A brief that says a conference meets in November, a regulator decides in March or a trial reports in the second half of next year has made a statement the calendar will test. This page collects those statements: 333 dated events named in 107 briefs, 24 of them in more than one. Each entry quotes every brief that names the event, word for word, and says what the outcome would change in that brief’s assessment. It never says what the outcome will be.

The dates are of three kinds and the page keeps them apart, because they deserve different amounts of trust. 38 are fixed in law: a regulation applies, a deadline falls. 53 are on an official calendar: a conference, a court hearing, a launch manifest. 242 are a party’s own target for its own work, and each names that party, because a date set by the organisation that benefits from meeting it is evidence of intent rather than of schedule. 123 are dated only to a year, because that is as far as the brief committed.

When a date passes, the Institute records what happened: that the event took place, with a source; that it slipped, and to when; or that it was cancelled. A release cannot ship while any event’s window closed more than sixty days earlier with nothing recorded. The recorded entries stay on this page, and the targets among them are scored on Track Record: how often the dates that parties set for their own work held. 6 have been recorded so far; 327 are awaiting their dates.

The list was extracted rather than written. Readers went through every sentence in the corpus that places something after 15 November 2026 near a scheduling word, and through every decisive experiment due soon, and kept the ones that name an event with an outcome somebody can check. Projections, the Institute’s own horizons and statements that nothing has been scheduled were left out. A brief’s single most informative test is on the Decisive Experiments page; changes that have already happened are on Updates.

October to December 2026

Firefly's Blue Ghost Mission 2 to the lunar farside

the fourth quarter of 2026 · Launch · Firefly Aerospace’s own target · Awaiting the date

  • Lunar Industry: “The other three moved into 2027: Blue Origin’s first Blue Moon Mark 1, carrying four plume-surface imaging cameras and a retroreflector array to Shackleton Connecting Ridge; Intuitive Machines’ IM-3; and Firefly’s Blue Ghost Mission 2, which one account puts no earlier than the end of 2026 and others in 2027.” Sources disagree on whether it flies at the end of 2026 or in 2027; either outcome adds a data point to the brief's reading of the commercial lunar manifest as a schedule of intentions.
  • Lunar Farside Radio Cosmology: “the lander vendor’s own mission page for Blue Ghost Mission 2, which carries LuSEE-Night to Nassau crater on the farside, says the mission is set to launch no earlier than 2027” Launch is the precondition for the brief's decisive experiment, and its date against the collaboration's successive quoted dates tests which delivery schedule the brief should carry.

Gestala's targeted first-generation prototype of its non-invasive ultrasound brain interface

the fourth quarter of 2026 · Milestone · Gestala’s own target · Awaiting the date

  • Focused Ultrasound in the Brain: “In March 2026 a Chinese company, Gestala, raised $21.6 million for an ultrasound interface whose lead programme is chronic pain, and it targets a first-generation prototype by the end of 2026.” Delivered, it adds a scanner-free phased-array device to the hardware record while leaving the neuromodulation flag where it is, since a prototype is not a sham-controlled result; missed, it joins the pattern the brief records of capital and company targets running ahead of evidence. Either way the sentence stating the target changes.

Start of HACM rapid fielding, the first air-breathing hypersonic weapon in service

October 2026 to September 2027 · Milestone · US Air Force’s own target · Awaiting the date

  • Hypersonic Flight: “HACM rapid fielding planned to begin in fiscal 2027 and full-rate production in fiscal 2029.” Tests the brief's reading that everything air-breathing is scheduled rather than demonstrated, and whether fielding again runs ahead of flight evidence as it did for the Army glide weapon (US fiscal 2027 runs October 2026 to September 2027).

HACM rapid-prototyping flight tests reported as scramjet-powered before the fiscal 2027 buy decision

October 2026 to September 2027 · Result due · US Air Force’s own target · Awaiting the date

  • Hypersonic Flight: “The decisive test for the air-breathing half of the subject is the HACM rapid-prototyping series: whether at least the first three of its five planned flight tests, which GAO treats as critical to the fiscal 2027 decision to begin buying the missile, fly under scramjet power and are reported as having done so before production starts.” This is the brief's decisive test for the air-breathing half: reported scramjet-powered flights before production would move air-breathing flight from the scheduled to the demonstrated part of the frontier, and their absence would leave it roughly where the X-51A left it in 2013 (US fiscal 2027 runs October 2026 to September 2027).

ISA Legal and Technical Commission consideration of the environmental threshold report

the fourth quarter of 2026 · Decision · ISA Legal and Technical Commission’s own target · Awaiting the date

  • Seabed Mineral Extraction: “The Authority's expert group is drafting thresholds for toxicity, turbidity and settling, and underwater noise and light around a zone-of-impact approach, with the Legal and Technical Commission due to consider the report in the fourth quarter of 2026 and to recommend to the Council in 2027.” First step toward numeric thresholds for toxicity, turbidity, settling, noise and light, without which, the brief says, compliance has no definition and an inspector has nothing to measure.

ISO New England and the California ISO implement ambient-adjusted line ratings under FERC Order No. 881

the fourth quarter of 2026 · Comes into force · On an official calendar · Awaiting the date

  • Transmission Without New Corridors: “ISO New England and the California ISO are scheduled to implement ambient-adjusted ratings in late 2026.” Implementation on time extends the only mandatory rating reform to two more markets and starts the before-and-after comparison the brief proposes as a running natural experiment; a slip lengthens the list of large markets still rating lines on static or seasonal assumptions.

Completion of rolling licence application for CD19 CAR-T in stiff person syndrome

the fourth quarter of 2026 · Milestone · Kyverna Therapeutics’s own target · Awaiting the date

  • Immune Engineering: “The first approvals are sought for stiff person syndrome, with submission expected to complete in late 2026 and launch targeted for 2027, and for myositis in 2027 — rare diseases chosen because single-arm evidence is acceptable there.” Completion would put the first engineered-cell autoimmune application fully before the regulator on single-arm evidence, the step the brief records as the field reaching a regulator.

First results from ESA's phase 1 development of European LISA telescopes

the fourth quarter of 2026 · Result due · European Space Agency’s own target · Awaiting the date

  • Next-Generation Gravitational-Wave Observatories: “The first results of the European LISA telescope contract are due by the end of 2026.” Good first results make a European replacement for the NASA-assigned telescopes a real option and loosen the 2035 launch's dependence on a contested American budget line; poor or unreported results leave the brief's reading of that dependency unchanged or tighter.

Lynas maintenance shutdowns in Malaysia and at Kalgoorlie, December 2026 quarter

the fourth quarter of 2026 · Milestone · Lynas Rare Earths’s own target · Awaiting the date

  • Critical Mineral Midstream: “Lynas scheduled about a month's shutdown in Malaysia in the December 2026 quarter for statutory electrical works and kiln maintenance, and about two weeks at Kalgoorlie for a grid upgrade; with one established separator outside China, one plant's maintenance calendar is a market event.” Tests the brief's claim that, with one established separator outside China, a single plant's maintenance calendar is a market event, as visible or not in non-Chinese supply and prices for the quarter.

Return to flight of Blue Origin's New Glenn launch vehicle

the fourth quarter of 2026 · Launch · Blue Origin’s own target · Awaiting the date

  • In-Space Servicing and Depots: “NASA’s October 2026 schedule showed Blue Origin’s New Glenn returning to flight in the fourth quarter of 2026” Bears on the launch-cadence dependency the brief identifies for tanker campaigns and on Blue Origin's Lunar Transporter depot plan, on which its crewed lander depends.

Ofgem final awards in the long-duration storage cap-and-floor first application window

the fourth quarter of 2026 · Decision · Ofgem’s own target · Awaiting the date

  • Energy Storage Revolutions: “Also falling in this window on stated schedules: the full Cambridge iron-air project in 2027, the British regulator's delayed final awards and its aim of opening a second application window in 2027” Final awards would turn Britain's provisionally named long-duration projects, the one eight-hour-minimum procurement the brief identifies, into contracted ones after slips from a second-quarter 2026 aim.

First post-marketing transplants of Sumitomo Pharma's raguneprocel in Japan, 35 patients

the fourth quarter of 2026 · Milestone · Sumitomo Pharma’s own target · Awaiting the date

  • Neurodegeneration Reversal: “Japan’s approval obliges surveillance of every treated patient, and the first post-marketing transplants, in 35 patients at seven facilities, were expected between October and December 2026.” Starts the uncontrolled post-marketing record on which the brief's assessment of conditional approval rests, the explicit bet that post-marketing evidence will be collected and acted on.

Completion of the 1.2 GW Stargate data-centre campus at Abilene

the fourth quarter of 2026 · Milestone · OpenAI and its Stargate partners’s own target · Awaiting the date

  • Compute Concentration: “Abilene was due for completion in the fourth quarter of 2026” Completion would be a pass on the brief's second test, the conversion of announced compute into energised capacity, from about 0.3 GW operating at Abilene in April 2026.

Astrobotic Griffin lunar landing carrying Astrolab FLIP rover to Nobile crater region

November 2026 · Launch · Astrobotic’s own target · Awaiting the date

  • Lunar Industry: “only Astrobotic’s Griffin remained on track, scheduled no earlier than November 2026 ; it concluded environmental testing on 13 October 2026 and is to carry Astrolab’s 500-kilogram FLIP rover to the Nobile crater region near Mons Mouton.” As the only one of four planned 2026 landers still on schedule in September, its outcome tests the brief's treatment of lunar manifest dates as intentions that mostly slip.

Gold Hydrogen publishes a maiden helium contingent resource for its Ramsay Project in South Australia

November 2026 · Publication · Gold Hydrogen’s own target · Awaiting the date

  • Geologic Hydrogen: “Gold Hydrogen targeted a maiden helium contingent resource for November 2026, ahead of any hydrogen resource.” If a helium resource is booked before any hydrogen resource, the brief's helium-first reading gains a second kind of evidence beyond concentrations and the frontier flag on it holds or strengthens; if it slips or is withdrawn, the helium-first case rests on reported concentrations alone and the sentence saying the explorer is booking helium first must be revised.

US agency implementing guidance under the policy for stopping high-risk life sciences research

November 2026 · Publication · Fixed in law · Awaiting the date

  • Mirror Life: “The US policy gave agencies 120 days to issue guidance, which falls in late November 2026, with compliance expected by 16 January 2027.” Shows whether agencies read "creation of mirror organisms" narrowly as the end product or broadly to include enabling work, which sets the reach of the first binding national instrument the brief records.

AISec workshop presentation of the cross-framework tool-poisoning robustness study

15 to 19 November 2026 · Conference · On an official calendar · Recorded

Happened on time (recorded 15 November 2026). The Dynatrace study is published in the proceedings of AISec ’26, the 19th ACM Workshop on Artificial Intelligence and Security, scheduled for 15 November 2026 in The Hague alongside ACM CCS (DOI 10.1145/3847352.3848107); the public record is the published paper, not an account of the talk. The version carrying that reference (arXiv v2, 10 November 2026) reports the figures the brief carries without change: 9,720 cells across 12 frameworks, 18 models and 45 scenarios, 22.9% overall attack success, per-model success from 0.4% to 49.7%, and Claude Opus 4.8 vulnerable in 8 of 530 cells. What changed in the briefs.
  • Agentic Autonomy and Control: “The November 2026 cross-framework robustness study is scheduled for presentation at the AISec workshop, 15–19 November 2026.” Moves the study behind the brief's reading that model-level injection resistance is real for some providers and absent for others from preprint to presented paper, and any revision of its figures would move that reading.

Seventh Review Conference of the Convention on Certain Conventional Weapons

16 to 20 November 2026 · Conference · On an official calendar · Recorded

Happened late (recorded 21 November 2026). The Seventh Review Conference met in Geneva from 16 November and closed on 21 November 2026, a day past its scheduled end, with no negotiating mandate and no protocol on lethal autonomous weapons systems: by consensus, states agreed to extend the discussions for two more years and to “elaborate” a possible accord by 2028, without committing to binding rules, on the Associated Press’s account. A proposal by Austria, Belgium, Brazil, Ireland, Mexico, New Zealand and Panama to launch negotiations fell short; activists blamed Russia and the United States for blocking stronger language, and the Stop Killer Robots campaign, an interested party, called the result a “watered-down mandate”. No account of the decision mentions weapons operating as a group, and none quotes the decision’s own text. What changed in the briefs.
  • Existential Risk Governance: “The Seventh Review Conference of the Convention on Certain Conventional Weapons meets in Geneva from 16 to 20 November 2026 and decides by consensus whether to open negotiations on autonomous weapons; as of 15 November 2026 the outcome is pending.” A consensus decision to open negotiations on autonomous weapons would cut against the brief's argument that a consensus rule lets one objecting state block a binding instrument, and a failure to reach one would be a further instance of it.
  • Military AI and Strategic Stability: “The Review Conference of 16 to 20 November 2026 decides by consensus whether negotiation begins; as of 15 November 2026 the outcome is pending.” This is the brief's decisive near-term result: a negotiating mandate, a renewed discussion mandate or no consensus moves its assessment of whether consensus arms control can open negotiations on autonomous weapons before mass adoption.
  • Autonomous Weapon Swarms: “The scheduled policy result is the Seventh CCW Review Conference, in Geneva from 16 to 20 November 2026.” Whether it adopts a mandate to negotiate an instrument, and whether any mandate addresses weapons operating as a group, bears on the brief's finding that the Geneva text never names swarms.

First field hearing of the Federal Reserve task force on productivity and employment

16 November 2026 · Hearing · On an official calendar · Recorded

Happened on time (recorded 16 November 2026). The Federal Reserve’s task force on productivity and jobs held its first public session on 16 November 2026, a conference hosted by the Board and the Federal Reserve Bank of San Francisco in San Francisco, with Chair Kevin Warsh opening it and moderating three of its four discussion sessions. Warsh set out three “illustrative scenarios, not forecasts” (broadly shared productivity gains, labour-market disruption, and disappointment) and asked: “Will this new technology deliver a rise in total factor productivity?” What changed in the briefs.
  • AI Driven Productivity: “A Federal Reserve task force on productivity and employment is scheduled, according to press reports, to hold its first field hearing in the San Francisco Bay Area on 16 November 2026.” Bears on the brief's finding that the central bank has become an actor in the AI-productivity question, showing how far it treats AI as a supply shock before the measurement the brief asks for exists.

Ninth Circuit argument on the constitutionality of California's AB 2013 training-data disclosure law

18 November 2026 · Hearing · On an official calendar · Recorded

Happened on time (recorded 18 November 2026). A three-judge Ninth Circuit panel in San Francisco heard argument on 18 November 2026 in x.AI LLC v. Bonta, No. 26-1591, xAI’s appeal from the district court’s denial in March 2026 of a preliminary injunction against AB 2013. The panel did not rule at the hearing, and no ruling had been reported by 22 November 2026. Two legal-press accounts describe the panel as sceptical of parts of xAI’s constitutional challenge. What changed in the briefs.
  • Synthetic Data and Training Provenance: “California's AB 2013 is the second, and its constitutional test has a scheduled date: the Ninth Circuit is to hear argument on 18 November 2026.” Bears on AB 2013 as one of the brief's two running experiments in mandated training-data transparency: the appeal it opens decides whether that experiment continues in its current form.

eGenesis fifth expanded-access pig-kidney recipient reaching one year post-transplant

22 November 2026 · Milestone · eGenesis’s own target · Awaiting the date

  • Xenotransplantation: “As of 14 November 2026 the open case is due to reach a year on 22 November 2026” A working graft at one year would answer, on a company-reported case, the brief's first frontier question of whether a pig kidney can reach and pass a year.

ESA release of Hera's first detailed images of Dimorphos

25 November 2026 · Publication · ESA’s own target · Awaiting the date

  • Planetary Defense: “The first detailed images of Dimorphos are to be released on 25 November 2026 , according to accounts of ESA's 27 October article, which this brief could not read directly.” The images begin the shape and volume half of the bulk-density measurement the brief treats as decisive for deflection momentum (beta), but on their own they supply no mass.

Expiry of China's suspension of the US gallium, germanium and antimony export ban

27 November 2026 · Comes into force · Fixed in law · Awaiting the date

  • The Physical Stack of AI: “China’s gallium, germanium and antimony suspension is due to end on 27 November 2026.” Bears on the minerals layer at the base of the brief's stack: whether the prohibition resumes, is extended or lapses changes how live a constraint the brief can call China's near-monopoly on gallium refining.

Archer's first piloted transition flight

December 2026 · Milestone · Archer Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “Joby flew a piloted transition in April 2025; Archer, as of November 2026, had not, and expected to by the end of that year” Would show whether Archer clears the step that precedes 50 hours of flight testing and any approval for vertical flight, the engineering gap the brief records against Joby.

Atlas Data Storage scales DNA data storage to terabyte data sets

December 2026 · Milestone · Atlas Data Storage’s own target · Awaiting the date

  • DNA Data Storage: “Atlas told a Library of Congress storage meeting in March 2026 that it was working on small end-to-end proofs of concept and expected to scale to terabyte data sets by the end of the year” A terabyte-scale write and read would approach the brief's decisive audited-terabyte test, though without blind independent read-back and published cost and time the brief says it would not meet it.

Remaining mandatory requirements of Australia's revised Policy for the responsible use of AI in government take effect, including an AI impact assessment before deployment for every in-scope use case

December 2026 · Comes into force · Fixed in law · Awaiting the date

  • Public-Sector AI Assurance: “The remaining mandatory requirements of Australia’s revised AI policy take effect in December 2026, including an AI impact assessment before deployment for every in-scope use case, after the first new requirement began on 15 June 2026.” Taking effect on schedule would put a mandatory pre-deployment assessment on every in-scope Australian AI use case and give the brief a coverage figure to look for in the next audit; a deferral would add the policy to the brief's record of assurance dates that move. Neither outcome changes the brief's scope finding unless the requirement is extended beyond AI to rules-based automation.

Final session of the BWC Working Group on the Strengthening of the Convention

December 2026 · Conference · On an official calendar · Awaiting the date

  • Existential Risk Governance: “The working group's final four-day session was scheduled, as of September 2026, for December 2026 with 90.6% of a report text agreed and enforcement, decision rules and standing unresolved.” Whether the group adopts a report carrying its proposed cooperation, science-and-technology and compliance mechanisms bears on the brief's assessment of the convention's institutional weakness, and sets what reaches the Tenth Review Conference.

CATL full-scale mass production of sodium-ion cells

December 2026 · Milestone · CATL’s own target · Awaiting the date

  • Advanced Battery Technologies: “End of 2026: Frontier CATL's stated full-scale mass production of sodium-ion, and the resolution of its own contradictory production statements.” Would resolve CATL's contradictory statements on whether its sodium-ion cell is already in large-scale production, bearing on the brief's finding that sodium-ion is approaching parity with LFP rather than displacing it.

Climeworks Mammoth direct-air-capture container upgrades

December 2026 · Milestone · Climeworks’s own target · Awaiting the date

  • Carbon Removal Verification: “Mammoth’s container upgrades are due by the end of 2026 and next-generation field tests in early 2027, on the operator’s schedule” Would show whether upgrades to Mammoth, whose early throughput fell far below design, arrive on the operator's own schedule, bearing on the delivered fraction of contracted removals the brief tracks.

Data closing date of the CODATA 2026 adjustment of the fundamental physical constants, on the task group's four-year cadence

December 2026 · Milestone · On an official calendar · Awaiting the date

  • Tabletop Tests of Gravity: “CODATA has adjusted the constants every four years since 1998 and closed its 2022 data at midnight on 31 December 2022, so on that cadence the next adjustment closes its data at the end of December 2026, and it is the first that can include the 2026 NIST replication.” A closing on the cadence makes the 2026 adjustment the first able to weigh the NIST replication against the 3.9 expansion factor the brief reports, and its eventual treatment of that value will raise or lower the brief's reading of G as the one soft number in the floor; a moved closing date, or an adjustment that excludes the replication, changes the brief's statement that this adjustment is the first that can include it.

EFSA publishes its reassessment of 3-NOP (Bovaer) safety for dairy cows and cows for reproduction

December 2026 · Publication · On an official calendar · Awaiting the date

  • Low-Methane Livestock: “The opinion was due by 30 June 2026 and is now expected by the end of 2026, and it will inform a Commission decision on whether the authorisation is maintained, amended, suspended or revoked.” A finding of no concern restores the inhibitor's case in confined dairy and weakens the brief's trust bottleneck; a diet-, dose- or class-specific restriction confirms the brief's expectation of a narrower, specified product; a recommendation to suspend would remove the only licensed route from the brief's upside entirely.

Deadline for Einstein Telescope site bid documents

December 2026 · Comes into force · On an official calendar · Awaiting the date

  • Multi-Messenger Astronomy: “Einstein Telescope bid documents are due by the end of 2026 and a site decision in the second half of 2027” Shows whether the competing site camps file complete bids, bearing on the brief's finding that the instrument's geometry is being decided by which regions can form a coalition.

FDA decision on Compass Pathways' COMP360 psilocybin application for treatment-resistant depression

December 2026 to January 2027 · Decision · US Food and Drug Administration’s own target · Awaiting the date

  • Precision Neuropsychiatry: “The psilocybin sponsor received rolling review and a Commissioner’s National Priority Voucher, which trade reporting described in November 2026 as setting a one- to two-month review target” Bears on the brief's assessment of a filing built on trials with measured blinding failure: approval, a request for more data or refusal shows how much weight the regulator places on the comparator design its new guidance accepts.

Food Standards Australia New Zealand completes its evaluation of Eden Brew's animal-free beta-casein, accepted in December 2025

December 2026 · Decision · Food Standards Australia New Zealand’s own target · Awaiting the date

  • Cellular Agriculture: “FSANZ accepted Eden Brew's application for an animal-free beta-casein in December 2025 and expects its evaluation to take less than a year.” Approval on time would add a precision-fermented casein to a market that already permits cultivated meat and support the brief's claim that the ingredient route clears regulators faster; a slip would show precision fermentation meeting the same regulatory-time cost the brief assigns mainly to cultivated meat.

End-2026 date by which cultivated-meat companies surveyed in early 2023 estimated industry output of about 125,000 tonnes could be reached

December 2026 · Milestone · Cultivated-meat producers and suppliers surveyed by the Good Food Institute’s own target · Awaiting the date

  • Cellular Agriculture: “No producer publishes annual tonnage, so the 2026 outturn cannot be stated.” A published industry tonnage for 2026 would turn the brief's forecast-versus-outturn comparison from an inference built on design capacities into a measured shortfall or a surprise; continued absence of any tonnage would confirm that the sector's central production figure remains unreported.

Start of Hera's closer characterisation phase at Didymos

December 2026 · Milestone · ESA’s own target · Awaiting the date

  • Planetary Defense: “What is scheduled for Hera: detailed Dimorphos images on 25 November 2026, closer characterisation from December 2026” This is the phase in which the decisive experiment's mass and bulk-density determination can begin, which would narrow or confirm the brief's beta range of about 2.2 to 4.9.

Joby piloted flight tests across its Dubai vertiport network

December 2026 · Milestone · Joby Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “Joby planned piloted flight tests across its Dubai vertiport network before the end of 2026” Bears on the brief's Gulf schedule, where no passenger can fly before a UAE air operator certificate and no UAE launch had carried one as of November 2026.

MARVEL microreactor dry criticality experiment at Idaho National Laboratory

December 2026 · Milestone · US Department of Energy’s own target · Awaiting the date

  • Microreactors and Process Heat: “The laboratory’s March 2026 annual review targets the dry criticality experiment for the end of 2026, with electricity and process-heat demonstrations to follow.” Met: the laboratory's own test reactor holds a date for the first time, and the brief's slip record for it stops growing; missed: a further slip on the one open-design microreactor strengthens the brief's reading that schedules in this subject are targets rather than commitments.

NOAA determination on certification of TMC USA's consolidated exploration-licence and commercial-recovery-permit application for the USA-A area

December 2026 · Decision · US National Oceanic and Atmospheric Administration’s own target · Awaiting the date

  • Seabed Mineral Extraction: “An environmental impact statement follows certification.” Certification is the step the brief places before the impact statement; NOAA's stated target is mid-December 2026, moved from October, and a refusal or further slip would push back the first step of the brief's decisive chain from permit to sale.

Commissioning of Rondo Energy's 100 MWh heat battery at Covestro, Brunsbüttel

December 2026 · Milestone · Rondo Energy’s own target · Awaiting the date

  • Energy Storage Revolutions: “with a 100 MWh Covestro project at Brunsbüttel in Germany, €75 million funded, supplying about 10% of site steam, whose commissioning was targeted for end-2026; that target could not be re-confirmed for this brief in November 2026.” Would show whether the industrial heat-storage fleet grows beyond its two operating units on its stated date, a test of the brief's record that dates in this category slip.

Sensorion US clinical filing for its GJB2 hearing-loss gene therapy

December 2026 · Milestone · Sensorion’s own target · Awaiting the date

  • Sensory Restoration: “A European developer scheduled a clinical trial application for a GJB2 therapy in the first half of 2026 and a US filing by the end of 2026” A filing would move gene therapy toward the cause of about half of recessive non-syndromic hearing loss, a programme the brief carries as unconfirmed and speculative as to a first human.

Launch of Boeing's uncrewed Starliner-1 cargo flight to the International Space Station

December 2026 to January 2027 · Launch · NASA and Boeing’s own target · Awaiting the date

  • Commercial Space Stations: “The fourth is a flight: Starliner-1, planned for the December 2026 to January 2027 timeframe.” A successful flight keeps a second certified American crew vehicle in prospect for 2028 and softens the brief's single-vehicle bottleneck; a slip or significant anomaly extends into the commercial-station era the period in which every American crew rides one vehicle type.

Xanadu reports its aggregate system loss indicator for the end of 2026 against its stated target of 10.2

December 2026 to March 2027 · Milestone · Xanadu’s own target · Awaiting the date

  • Fault-Tolerant Quantum Computing: “Xanadu's own 2025 paper on its Aurora machine measured far worse: losses of slightly over 95 per cent on its heralded optical paths, against loss budgets of about 1 per cent for fault tolerance.” The brief's eighth bottleneck is optical loss in photonic machines. A published reading at or below 10.2, with a definition of the indicator, would be the first dated measure from Xanadu of how far its components are from their loss budget; a miss, or a figure still undefined, leaves the bottleneck where the brief puts it. The company's 11 November 2026 release calls 10.2 its year-end 2026 target; one account of the earnings call places it at the beginning of 2027 and says the figure will be reported once a year.
  • Integrated Photonics: “Does the loss budget for photonic quantum computing close in a foundry process?” Xanadu's circuits are silicon nitride made in foundry processes, and the indicator is the only dated, company-set measure of whether that loss budget is closing; the company expects waveguide loss to be the largest source.

EU AI Act Article 50 marking obligation reaches systems already on the market

2 December 2026 · Comes into force · Fixed in law · Awaiting the date

  • Synthetic Data and Training Provenance: “Article 50 marking has applied to new systems since 2 August 2026 and is due for systems already on the market by 2 December 2026.” Completes the legal treatment group for the brief's proposed watermark-persistence field trial, which asks whether generation-time marking can ever support crawl-time filtering of machine-written text.
  • Content Authenticity Infrastructure: “EU marking for systems already on the market by 2 December 2026” Falls inside the brief's decisive-experiment window: if marking mandates bind, the labelled share of AI-generated media should bend at this date, testing the brief's central scepticism that the binding constraint is physical, not legal.

Two prohibitions added to the EU AI Act in 2026 begin to apply

2 December 2026 · Comes into force · Fixed in law · Awaiting the date

  • AI Governance: “Two new prohibitions are scheduled for 2 December 2026” Application on the date would extend the practice-based prohibitions the brief contrasts with scale-based triggers, and is the first test of whether the schedule reset in July 2026 holds.

ARC Prize 2026 results announcement, including private-set scores

4 December 2026 · Result due · On an official calendar · Awaiting the date

  • Artificial General Intelligence: “ARC Prize 2026 has closed and its results are scheduled to be announced on 4 December 2026; nothing about its private-set scores is known here before then.” One of the few scheduled measurements on the brief's calendar; contamination-resistant private-set scores would move its reading of measured, as opposed to claimed, generalisation, subject to the independence questions it records for the benchmark.

Proposals due for NASA commercial low-Earth-orbit station contracts

8 December 2026 · Milestone · On an official calendar · Slipped

Slipped — now 14 December 2026 (recorded 9 November 2026). NASA’s Amendment 1 to the solicitation, posted on 9 November 2026, moved the proposal deadline from 8 December to 14 December 2026, on New Space Economy’s account; the planned award date was not changed.
  • Space Habitats: “On 9 October 2026 NASA issued a final request for proposals for firm-fixed-price contracts with a competed certification phase, proposals due 8 December 2026 and award planned for spring 2027” Proposals arriving on the date would keep the spring 2027 award, and the brief's station-gap arithmetic built on it, on schedule; an extension would move both.
  • Commercial Space Stations: “Amendment 1, posted on 9 November 2026 with a revised business-case analysis template, moved the proposal deadline from 8 to 14 December 2026, and NASA’s cover letter gives 15 April 2027 as the anticipated award date.” Proposals received on the extended date keep the April 2027 award on schedule; a further extension would move the award and, with it, the brief's count of the months left for overlap with the ISS, and any disclosed count of bidders would bear on its expectation of a single funded provider.

Revised US third-quarter 2026 labour productivity release

8 December 2026 · Publication · On an official calendar · Awaiting the date

  • AI Driven Productivity: “The revised third-quarter 2026 productivity figures are scheduled for 8 December 2026.” Revises the 3.6% annual-rate third-quarter figure the brief carries, bearing on whether the 2024-2026 acceleration persists as the utilisation boost the brief treats as temporary normalises.

Australia's Privacy Act amendments on automated decisions commence, requiring privacy policies to describe the computer programs used to make significant decisions about individuals

10 December 2026 · Comes into force · Fixed in law · Awaiting the date

  • Public-Sector AI Assurance: “From 10 December 2026, Australia’s 2024 privacy amendments require entities covered by the Privacy Act to say in their privacy policies what kinds of personal information are used in computer programs that make significant decisions about individuals, and what kinds of decision those programs make.” If Commonwealth agencies' privacy policies list their rules-based payment and debt engines, the brief gains its first evidence that a duty keyed to the decision reaches the estate the AI-scoped instruments miss; if they list only AI tools, or describe programs too generally to identify any, the brief's finding that scope is the binding failure stands and the disclosure joins the controls that produce paperwork.

US Department of Energy contracts with host states for Nuclear Lifecycle Innovation Campuses

15 December 2026 · Milestone · US Department of Energy’s own target · Awaiting the date

  • Nuclear Waste Solutions: “the Department of Energy's September 2026 targets of host-state agreements by the end of that month and contracts by 15 December 2026 concern campuses, not a licensed repository, and this brief could not confirm that either target was met.” Bears on the brief's narrow correction that the American initiative concerns fuel-cycle campuses rather than a licensed repository; the decisive observation it names is a state enacting legislation to accept spent fuel for disposal, which contracts alone would not supply.

ICLR 2027 decision notification, the first main-venue review cycle run under a rule requiring reviewers who use a language model to file an original self-written assessment and the model interactions

16 December 2026 · Decision · On an official calendar · Awaiting the date

  • Research Integrity Infrastructure: “ICLR 2027, whose decisions are scheduled for 16 December 2026, is the first main-venue cycle run under that rule, and whether its organisers publish enforcement counts comparable to ICML's will show whether disclosure can be checked at all.” If ICLR publishes counts of reviews or papers sanctioned under the self-written-assessment rule, the brief gains a second venue-level enforcement measurement beside ICML's 795 flagged reviews and 497 desk rejections, and its claim that disclosure-based policies cannot be checked weakens; if no counts appear with the decisions or in a later retrospective, ICML's planted-phrase figures remain the only enforcement measurement and the exact-verifier reading stands.

NRC completes its expedited review of Radiant's fuel-facility licence application for the R-50 microreactor factory in Oak Ridge

18 December 2026 · Decision · On an official calendar · Awaiting the date

  • Microreactors and Process Heat: “on an expedited review it expects to complete by 18 December 2026, about 55% faster than the typical 18 months.” Issued on time: the first piece of the factory-fuelling pathway exists rather than being proposed, and the brief's institutional section records it; late: the brief reads the regulator's expedited microreactor schedules as targets rather than commitments.

Deadline for NIST module-validation changes under the June 2026 executive order

19 December 2026 · Comes into force · Fixed in law · Awaiting the date

  • Post-Quantum Migration: “The June 2026 executive order directs NIST to speed its module-validation processes, within 180 days on an industry body’s arithmetic, which puts the due date around 19 December 2026.” Would show whether the validation bottleneck the brief identifies is shortened on the order's timetable or slips like other security deadlines it records.

Australian Productivity Commission final report on GST distribution reforms

31 December 2026 · Publication · On an official calendar · Awaiting the date

  • Future Federalism: “The reforms “have largely not achieved their goals” , produced “two sets of rules” , and should be unwound; final report due 31 December 2026 .” The final report would confirm or revise the interim finding that the reforms should be unwound, and its date is one of the three the brief offers for a pre-registered evaluation of an equalisation reform.

Chinese state deadline for 10,000 humanoids in commercial operation

31 December 2026 · Milestone · China's Ministry of Industry and Information Technology and State-owned Assets Supervision and Administration Commission’s own target · Awaiting the date

  • Embodied AI and Robot Foundation Models: “China's industry ministry and state-assets regulator set 31 December 2026 for 10,000 humanoids in commercial operation.” A reported count against the directive would give the brief its first government-attested figure for humanoids in commercial operation, and would move its assessment of how far policy-driven deployment in China runs ahead of demonstrated reliability.

Close of written comments on the ISA draft road map for exploitation regulations

31 December 2026 · Comes into force · On an official calendar · Awaiting the date

  • Seabed Mineral Extraction: “The draft was due on 31 October 2026, comments close on 31 December 2026, and the Council meets from 8 March 2027.” Bears on whether the Council's July 2026 decision on method is being followed on schedule; the brief could not confirm the draft road map was circulated on its 31 October due date.

Delivery of NASA's finalised Coordinated Lunar Time strategy to the White House

31 December 2026 · Milestone · On an official calendar · Awaiting the date

  • Cislunar Navigation and Lunar Time: “Two documents due after this text would each change its assessment: NASA’s finalised strategy, due 31 December 2026, and the first version of the LunaNet reference-time standard to state its relation to TCL.” Whether the strategy adopts the conventions of CGPM Resolution 6 decides, on the brief's own test, whether one lunar time exists or the first fork has occurred; the brief notes the deliverable is owed to the Executive Office, so delivery may not be public.

NPCI's 30% cap on any one third-party app's share of monthly UPI volume reaches its deferred compliance date

31 December 2026 · Comes into force · Fixed in law · Awaiting the date

  • Digital Public Infrastructure: “NPCI has deferred the compliance date twice, and it now stands at 31 December 2026.” Enforcement would turn the cap into the first competition instrument actually applied to UPI and open the brief's proposed policy-result test of whether forced deconcentration of the interface changes fees, outages or entry; a third deferral or a retirement would confirm the brief's finding that India's only competition instrument on the rail was announced in 2020 and never used.

The second half of 2026, no closer date given

1X's first US customer deliveries of its home humanoid

the second half of 2026 · Milestone · 1X Technologies’s own target · Awaiting the date

  • Embodied AI and Robot Foundation Models: “1X's first US customer deliveries are scheduled by the end of 2026.” Deliveries would begin the home-fleet record the brief says 1X was to generate and expose its remote-operator dependence to customers; a slip would add a missed 2026 delivery promise to the brief's list of moved dates.

Interim proof-of-concept data for Absci's machine-learning-designed antibody

the second half of 2026 · Result due · Absci’s own target · Awaiting the date

  • Generative Biomolecular Design: “Fifth, a natural experiment already running: the clinical readouts scheduled for late 2026 and early 2027.” The brief's running natural experiment: a clean efficacy signal would change the capital available to the field and a null would change it the other way, without settling the de novo design question.

Construction begins on the first 30,000-tonne phase of Deep Sky's direct-air-capture facility in southwestern Manitoba

the second half of 2026 · Milestone · Deep Sky’s own target · Awaiting the date

  • Carbon Capture at Scale: “The pipeline is not the capacity.” Deep Sky said in October 2025 that construction of the first 30,000 tonnes would begin in 2026, and reported a target of late 2026 in December 2025. On 30 June 2026 it said it was waiting for Manitoba's final storage regulations and confirmation of power supply. A start would move 30,000 tonnes a year of direct air capture from pipeline to construction; a slip would add to the announced-to-delivered gap the brief measures.

Hydrostor's financial close for the 500 MW / 4,000 MWh Willow Rock compressed-air storage project in Kern County, California

the second half of 2026 · Milestone · Hydrostor’s own target · Awaiting the date

  • Energy Storage Revolutions: “Sixth: permitting, interconnection and financing bind before technology does.” The brief's evidence for this bottleneck is Willow Rock's failure to secure financing. The company said on 12 August 2026 that its US$230 million round takes the project to financial close later this year; a close would show the financing constraint met with the licence and federal environmental finding already in hand, and a further slip would extend the record of moved dates the brief sets out.

Groundbreaking at Hydrostor's Willow Rock compressed-air storage project in Kern County, California

the second half of 2026 · Milestone · Hydrostor’s own target · Awaiting the date

  • Energy Storage Revolutions: “For Hydrostor's Willow Rock, whose groundbreaking was planned for mid-2026, the company said on-site work began in July 2026 and, on 12 August, that it planned to break ground and reach financial close later in the year; a San Francisco resolution of April 2026 on California Community Power's contract expects commercial operation on 1 July 2030.” The brief records the groundbreaking as planned for mid-2026 and unconfirmed. The company said on 6 August 2026 that on-site work began in July and on 12 August that it plans to break ground later in 2026, so a groundbreaking would date the start of construction the brief could not confirm.

Let's Encrypt staging service for quantum-resistant certificates

the second half of 2026 · Milestone · Let's Encrypt’s own target · Awaiting the date

  • Post-Quantum Migration: “The certificate milestone now has dated intermediate readouts: a staging service from Let’s Encrypt targeted for late 2026, public bootstrapping by log operators in the first quarter of 2027, and Chrome’s quantum-resistant root store in the third quarter of 2027.” The first dated intermediate readout toward a browser-trusted post-quantum certificate, the milestone the brief uses to track the web's authentication layer.

Delivery of Stanford atom sources to the MAGIS-100 strontium interferometer at Fermilab

the second half of 2026 · Milestone · MAGIS-100 collaboration (Fermilab and Stanford)’s own target · Awaiting the date

  • Precision Quantum Sensing: “As announced in January 2026 — laser laboratory complete, atom sources due from Stanford in late 2026, installation through 2027 and commissioning from 2028 — the 100-metre strontium interferometer will show what phase noise, atom flux and wavefront control a kilometre-class instrument can expect.” Delivery on time would be the first dated step of the schedule behind the brief's claim that MAGIS-100's first science run will calibrate the mid-band programme; a slip would push that calibration later.

Start of Meta's power purchases from Perry, Davis-Besse and Beaver Valley

the second half of 2026 · Milestone · Meta’s own target · Awaiting the date

  • Small Modular Reactors: “Meta's 9 January 2026 announcement of “up to 6.6 GW by 2035” resolves into twenty-year agreements for 2,176 MW from three existing large plants — Perry, Davis-Besse and uprates at Beaver Valley — with purchases scheduled to begin in late 2026, which this brief could not confirm as of November 2026” Would confirm whether the firm part of the 6.6 GW headline resolves into purchases from existing plants, the distinction between orders and frameworks the brief exists to make.

Public Utilities Commission of Nevada decision on the Google–Ormat geothermal supply agreement

the second half of 2026 to the first half of 2027 · Decision · Ormat Technologies’s own target · Awaiting the date

  • Geothermal Megaprojects: “It has not, on the counterparty’s own account in a securities filing signed 5 November 2026, approved the Ormat agreement and its related energy supply arrangements, and the expected date has moved from the second half of 2026 to the end of 2026 or early 2027.” Approval would move up to 150 MW from the brief's tier of agreements signed and waiting on a regulator into binding supply, with the technology still unspecified; a further slip would add to the dated promises the brief records as moved.

Publication of the RESTORE trial comparing manufactured and donated red cells

the second half of 2026 to the first half of 2027 · Result due · NHS Blood and Transplant’s own target · Awaiting the date

  • Synthetic Blood: “Publication was expected in late 2026 or early 2027.” A materially longer half-clearance time for manufactured cells would put the brief's case for chronic transfusion on measured grounds; no difference would narrow the cultured-cell rationale to rare phenotypes.

Executive summary and core report of the next quadrennial ozone assessment

the second half of 2026 · Publication · On an official calendar · Awaiting the date

  • Global Cooperation Models: “The current published assessment dates from 2022; the successor's core report is due at the end of 2026, its executive summary in late 2026 and its updated public-facing questions in early 2027, and it will for the first time cover the impacts of stratospheric aerosol injection.” Every atmospheric figure in the brief rests on the 2022 assessment and is to be re-based on this one, which will also cover stratospheric aerosol injection impacts for the first time.

UK government lays regulations banning romantic companion chatbots for under-18s

the second half of 2026 · Decision · UK Government’s own target · Awaiting the date

  • AI Companions: “The United Kingdom’s first regulations were expected before the end of 2026 with force from spring 2027, a timetable announced a week before the Prime Minister who announced it resigned; this brief could not confirm that any regulations had been laid.” Laying would show the June 2026 announcement surviving the change of Prime Minister and would begin to close the gap the brief records in the Online Safety Act's reach over standalone companions; the brief lists whether they were laid as an open obligation.

UN General Assembly plenary action on First Committee resolution L.37 on autonomous weapons

the second half of 2026 · Vote · On an official calendar · Awaiting the date

  • Military AI and Strategic Stability: “plenary action on L.37 later in the 81st session of the General Assembly” Bears on the brief's alternative path in which the issue passes to the General Assembly: the plenary count, and how the states whose systems a rule would bind most vote, shows the support that route carries.

2026, no closer date given

Banco Central do Brasil launches Drex, its tokenised settlement platform

2026 · Launch · Banco Central do Brasil’s own target · Awaiting the date

  • Digital Public Infrastructure: “Drex, the central bank’s tokenised settlement platform, completed its second pilot phase in late 2025 and is slated for launch in 2026, on a trade magazine’s account that also notes its deadlines have slipped before.” A launch would extend the central bank's combined builder, owner, operator and regulator role from retail payments into tokenised settlement, widening the conflict-of-interest question the US determination raised and the brief examines; a further slip would keep that role confined to Pix and add another missed date to the record the brief cites.

Physical start-up of Russia's BREST-OD-300 lead-cooled fast reactor

2026 · Milestone · Rosatom’s own target · Awaiting the date

  • Advanced Fission: “Russia's lead-cooled demonstrator was about 70% assembled in January 2026, with physical launch scheduled for 2026 and grid connection targeted for the first half of 2027.” Physical start-up would be the first civil lead-cooled reactor at power scale reaching criticality, which the brief warns is a zero-power milestone that tests neither heat removal nor the unwritten corrosion limits.

Start of Generation Gold Standard universal influenza vaccine clinical trials

2026 · Milestone · US Department of Health and Human Services and National Institutes of Health’s own target · Awaiting the date

  • Universal Vaccines: “a United States in-house universal influenza programme whose announcements of 1 May 2025 stated that clinical trials would begin in 2026” Whether trials on the government's BPL whole-virus platform begin in 2026 tests the brief's listing of the programme as scheduled rather than forecast, against a phase 1 record in which the intranasal route did not immunise measurably.

A stem-cell-derived hypoimmune islet product's application to begin its first human trial, and the Phase 1 start that follows

2026 · Milestone · Sana Biotechnology’s own target · Awaiting the date

  • Universal-Donor Cells: “The candidate trial exists on paper: a stem-cell-derived hypoimmune islet product whose sponsor expected to file to begin a human study in 2026, following 15 months of glycaemic control in mice without histological abnormality.” A trial that starts gives the subject its second and third cloaked-graft recipients and a dose chosen to work rather than to satisfy a first-in-human floor, which is the only way the brief's central claim stops resting on one patient at 7.1% of a reference dose; a slip or a withdrawal would leave the hypoimmune clinical thread at a single recipient and make the suspension of the same sponsor's allogeneic programmes the field's dominant fact.

Drilling of KMT-1, the Krafla Magma Testbed's first well into the Krafla melt

2026 to 2027 · Milestone · Krafla Magma Testbed’s own target · Awaiting the date

  • Magma Energy Extraction: “Drilling has moved from 2026 to a window of 2026 or 2027, with mid-2026 reporting saying the date remained pending while funding and partnerships were secured.” Spud starts the brief's decisive experiment, whether a cased borehole holds open against magma for months, with the answer due within a year; its timing tests a drilling date that has moved in successive published schedules and that the brief treats as 2027 at the earliest.

Quaise Energy drills to about 1,000 m at its central Oregon site

2026 · Milestone · Quaise Energy’s own target · Awaiting the date

  • Geothermal Megaprojects: “In March 2026 the developer was reported seeking $200 million for a 50 MW first phase in central Oregon with operation targeted by 2030 rather than 2028, a well target of about 4,800 m, and a plan to drill to about 1,000 m during 2026.” Reaching about 1,000 m would be a tenfold step beyond the 100 m millimetre-wave field test, bearing on the brief's treatment of superhot drilling as a dated claim that has already slipped once.

UK government refresh of its national scientific expert register for emergencies

2026 · Milestone · UK Government’s own target · Awaiting the date

  • Scientific Advisory Institutions: “A national expert register is to be refreshed during 2026” A refreshed register would be the first checkable delivery on the government's acceptance of the Covid-19 Inquiry's scientific-advice recommendations, which the brief says can be verified without anyone building anything.

January to March 2027

Launch of Axiom Mission 5, the first private astronaut mission to the ISS since June 2025

January 2027 · Launch · Axiom Space’s own target · Awaiting the date

  • Commercial Space Stations: “Three private missions by three companies are scheduled for 2027 and 2028, the first awarded since NASA moved to full-cost pricing.” Ax-5 flying with a full paying crew would begin the 2027 to 2028 demand cadence the brief treats as the ISS-based counterpart of its decisive test; a slip or unsold seats would extend the record that no private mission flew in 2026.

First Blue Moon Mark 1 lunar landing, to Shackleton Connecting Ridge

the first quarter of 2027 · Launch · Blue Origin’s own target · Awaiting the date

  • Lunar Industry: “the award depends on the first Blue Moon Mark 1 landing successfully and on Blue Origin showing how the rover would be deployed; the ride is the second Mark 1, at late 2027 ; and the gating flight slipped from 2025 to no earlier than the first quarter of 2027.” A successful landing would meet the first condition on VIPER's conditional award and keep the brief's decisive drill experiment on its late-2027 ride; a failure or slip would push that experiment further out.

California's platform and hosting provenance duties, including the provenance interface, take effect

1 January 2027 · Comes into force · Fixed in law · Awaiting the date

  • Content Authenticity Infrastructure: “California’s platform and hosting duties, including the new provenance interface, from 1 January 2027” Falls inside the brief's decisive-experiment window: if marking mandates bind, the labelled share of AI-generated media should bend at this date, testing the brief's central scepticism that the binding constraint is physical, not legal. The brief records California's dates as intentions because they have slipped and been amended once.

Placebo-controlled phase 3 readout of mRNA CAR-T in myasthenia gravis

the first quarter of 2027 · Result due · Cartesian Therapeutics’s own target · Awaiting the date

  • Immune Engineering: “The first placebo-controlled trial of an engineered-cell product in an autoimmune disease has not reported as of November 2026; one is scheduled to read out in the first quarter of 2027.” The first placebo arm in the field would, for the first time, separate the cell's effect from that of enrolment in a subject whose every efficacy figure is an uncontrolled response rate; it leaves the brief's decisive durability question open.

Start of eGenesis RESTORE phase 1/2/3 pig-kidney trial (EGEN-2784)

the first quarter of 2027 · Milestone · eGenesis’s own target · Awaiting the date

  • Xenotransplantation: “The confirming experiment is RESTORE, expected to start in 1Q 2027 with 33 waitlisted patients.” Its start opens the brief's confirming experiment, testing six-month dialysis independence as a bridge in a healthier waitlisted population, after a start date that has already slipped.

Selection of up to seven EU AI gigafactories under the EuroHPC call

the first quarter of 2027 · Decision · On an official calendar · Awaiting the date

  • Compute Concentration: “The European Union’s call for up to seven AI gigafactories, with up to €10 billion of public and a projected €20 billion of private money, closed on 12 November 2026 with awards expected around the start of 2027.” Awards would fix the scale and siting of the European public compute the brief assesses as small against the private build.

Fervo Cape Station GeoBlocks 2 and 3 enter commercial operation

1 January 2027 · Milestone · Fervo Energy’s own target · Awaiting the date

  • Geothermal Megaprojects: “As of 9 November 2026 the second unit was synchronised and delivering test energy and the third was in cold commissioning, with both expected in commercial operation by 1 January 2027.” Completing Phase I on guidance would bring Cape to about 100 MW of nameplate in commercial operation, but the brief's open test is net output per unit against an expected $7,000/kW, which commercial operation alone does not settle.

Gold Hydrogen completes its green methanol feasibility study for a Yorke Peninsula facility using Ramsay natural hydrogen

the first quarter of 2027 · Publication · Gold Hydrogen’s own target · Awaiting the date

  • Geologic Hydrogen: “Gold Hydrogen’s methanol feasibility study is due in the March quarter of 2027.” A study that states a well count and a sustained per-well rate tests the brief's arithmetic of about a hundred development wells at the modelled 36.5 tonnes a year; a study premised on per-well rates well above 100 kg a day would need a flow record the brief says does not yet exist, and a deferral would extend the record of appraisal without development.

Release of Hera's CubeSats, including Juventas, at Didymos

January 2027 · Milestone · ESA Hera mission (dates per CNES and the Juventas team)’s own target · Awaiting the date

  • Planetary Defense: “the gravimeter and low-frequency radar that address internal structure ride on Juventas, whose release its own team places in early 2027 and the French agency's schedule places in January 2027” Juventas carries the gravimeter and low-frequency radar for internal structure, so its release governs when the brief's open question on Dimorphos's interior and porosity can start to be measured.

Launch of Lunar Pathfinder, Moonlight's precursor relay, on Firefly's second lander mission

the first quarter of 2027 · Launch · ESA’s own target · Awaiting the date

  • Cislunar Navigation and Lunar Time: “Lunar Pathfinder, Moonlight’s precursor relay, was to begin operations in 2026 in ESA’s October 2024 statement and is listed for the first quarter of 2027 in ESA’s February 2026 plan and “no earlier than 2027” by its carrier.” Tests the brief's finding that every contracted navigation date has moved right at least once, and its arrival would begin the 2027-2031 hardware window the brief sets for its decisive Augmented Forward Signal demonstration.

Start of the LIGO-Virgo-KAGRA six-month interim observing run IR1

January 2027 · Milestone · LIGO-Virgo-KAGRA collaboration’s own target · Awaiting the date

  • Multi-Messenger Astronomy: “The interim observing run planned for late summer 2026 moved to a target of mid-January 2027.” Opens the window for the brief's decisive result, a second binary neutron star merger with a kilonova and host redshift; the start has already moved from late summer 2026, and its timing sets when that result becomes possible.

Public bootstrapping of Merkle Tree Certificates by log operators

the first quarter of 2027 · Milestone · Google (Chrome)’s own target · Awaiting the date

  • Post-Quantum Migration: “The certificate milestone now has dated intermediate readouts: a staging service from Let’s Encrypt targeted for late 2026, public bootstrapping by log operators in the first quarter of 2027, and Chrome’s quantum-resistant root store in the third quarter of 2027.” A second intermediate readout on the certificate path; the brief treats these browser dates as one vendor's plan rather than results.

New York law barring AI companions from simulated relationships with minors takes effect

1 January 2027 · Comes into force · Fixed in law · Awaiting the date

  • AI Companions: “New York’s law takes effect 1 January 2027” Entry into force, or an injunction against it, decides whether the brief's account of statutory limits on relational features for minors describes operating law, and opens the period in which compliance and age-assurance error become observable.

New York RAISE Act frontier AI law takes effect

1 January 2027 · Comes into force · Fixed in law · Awaiting the date

  • AI Governance: “New York’s RAISE Act is scheduled for 1 January 2027” Taking effect would add a second US state frontier-model regime beside California's, bearing on the brief's account of state regulation proceeding while federal preemption remains unsettled.

First ship-to-ship propellant transfer demonstration between two Starships

the first quarter of 2027 · Milestone · SpaceX’s own target · Awaiting the date

  • Mars Colonization: “On 20 October 2026 SpaceX's president named early 2027 as the target for a first orbital refuelling attempt, and NASA schedule slides reported the same week placed a propellant transfer demonstration between two Starships in the first quarter of 2027” The transfer gates every downstream Starship lunar and Mars date in the Mars brief and the launch-cost arithmetic in the habitats brief; its outcome either ends or extends a record in which this milestone has carried five dates.
  • In-Space Servicing and Depots: “On 20 October 2026 SpaceX named early 2027 for its first orbital refuelling attempt, and NASA schedule slides shown that week placed the two-ship demonstration in the first quarter of 2027.” This is the brief's decisive experiment: a completed two-vehicle transfer would move depots from design literature into engineering, while a failure mode found at scale would re-price every architecture that assumes tanking, including NASA's contracted lunar landing.

Also named in: Space Habitats

US decision on The Metals Company's commercial recovery permit outside the Authority

the first quarter of 2027 · Decision · The Metals Company’s own target · Slipped

Slipped — now the fourth quarter of 2027 (recorded 12 November 2026). On 12 November 2026 the company said it expects the commercial recovery permit before its targeted fourth-quarter 2027 commissioning, its chief executive saying it could be in hand by this time next year, in place of the earlier expectation of the first quarter of 2027. What changed in the briefs.
  • Seabed Mineral Extraction: “whether a commercial recovery permit issued by the United States outside the Authority, which the applicant expects before its targeted fourth-quarter 2027 commissioning, is followed by nodules that are lifted, landed, smelted and sold to a buyer who accepts the title.” First step of the brief's decisive test: a permit granted, granted then enjoined under the suit filed on 30 September 2026, or delayed would bear on whether the Authority's code is a precondition for an industry.

Launch of Vast Haven-1, the first commercial space station module

the first quarter of 2027 · Launch · Vast’s own target · Awaiting the date

  • Artificial Gravity: “Haven-1 is a single module of 45 cubic metres habitable, 14,000 kg, four crew, missions to two weeks , now targeting the first quarter of 2027 after slipping from May 2026” A launch would test the schedule of the only commercial roadmap toward a rotating station, while leaving the brief's point that Haven-1 itself carries no spin demonstration unchanged.
  • Space Habitats: “Haven-1, a single module dependent on a docked Dragon, slipped from 2026 to no earlier than Q1 2027 and was reaffirmed in September 2026” A launch would give the brief its first commercial station on orbit, a single module dependent on a docked Dragon; a further slip would extend the brief's record that every first-element date has moved.
  • Commercial Space Stations: “Its launch moved from no earlier than May 2026 to no earlier than the first quarter of 2027 on 20 January 2026, and Vast reaffirmed early 2027 on 18 September 2026” A launch starts both of the brief's leading tests, the sale of Haven-1's 160 crew-days and the interval to its first crewed docking; a further slip delays both and lengthens the record that first-element dates move.

Verra's fifth programme version becomes mandatory for new registrations

1 January 2027 · Comes into force · On an official calendar · Awaiting the date

  • Carbon Removal Verification: “Verra’s fifth version becomes mandatory for new registrations on 1 January 2027” Brings Verra's revised programme rules, including its alternatives to pooled buffers, into force for new projects, bearing on whether registry rules can carry durability claims ahead of measurement.

Deadline for the House to pass the Senate-passed Bipartisan American Affordability and Jobs Act before the 119th Congress ends

3 January 2027 · Vote · Fixed in law · Awaiting the date

  • Transmission Without New Corridors: “If the House does not pass the Senate bill before the current Congress ends on 3 January 2027, the bill lapses and both provisions with it.” Enactment would make a NEPA categorical exclusion for in-corridor capacity work and a recurring duty to evaluate and deploy advanced transmission technologies law, the first federal requirement that goes beyond consideration; lapse leaves Order No. 1920's duty to consider, itself under appeal, as the only federal instrument.

Expiry of China's extended suspension of its October 2025 rare-earth export controls

10 January 2027 · Comes into force · Fixed in law · Awaiting the date

  • Critical Mineral Midstream: “On 9 November 2026, the day before the one-year suspension was due to lapse, China's Ministry of Commerce extended it by two months, to 10 January 2027, and gave no indication of what follows.” Decides whether the October 2025 controls take effect, are suspended again or are replaced, the scoreboard date that the brief's earlier text expected November 2026 to settle and that moved instead.

Resumed ninth meeting of WHO working group negotiating the Pandemic Agreement PABS annex

11 to 15 January 2027 · Conference · On an official calendar · Awaiting the date

  • Pathogen-Agnostic Surveillance: “the ninth meeting “will resume formal negotiations” from 11 to 15 January 2027” Agreed provisions here would bear on whether the legal right to the sample, which the brief treats as a precondition for the field, is on course for May 2027; no agreed text would extend a record of missed dates.

Full compliance date for the US policy for stopping high-risk life sciences research

16 January 2027 · Comes into force · Fixed in law · Awaiting the date

  • Mirror Life: “US agency implementation guidance (due about late November 2026) and full compliance (16 January 2027): does the guidance keep mirror organisms explicitly inside the prohibition?” Moves the US funding prohibition from text to institutional practice, testing whether mirror organisms stay explicitly inside it once funded institutions must review and report covered work.

The US GENIUS Act and the OCC's final implementing rule for payment stablecoin issuers take effect

18 January 2027 · Comes into force · Fixed in law · Awaiting the date

  • Tokenized Settlement: “The GENIUS Act, signed on 18 July 2025, takes effect on 18 January 2027, the date the Comptroller of the Currency's final implementing rule, issued on 21 October 2026, also takes effect.” If the first redemption episode under the two-business-day standard, the 10%-in-24-hours notification and the 5% on-demand reserve shows smaller par deviations for a given reserve shock than 2023, the run-risk paragraphs soften and the regime becomes a credible settlement asset; if deviations are unchanged or issuance migrates to affiliates paying rewards, the singleness and deposit-competition findings harden.

ISA Legal and Technical Commission consideration of Tonga Offshore Mining Limited's application to extend its exploration contract, which expires on 11 January 2027

February 2027 to March 2027 · Decision · On an official calendar · Awaiting the date

  • Seabed Mineral Extraction: “In the same July session the Council extended the Nauru company's exploration contract for five years, with delegations stating that the extension was not approval and was separate from the inquiry.” The second of the company's two Authority contracts comes up for extension while the compliance inquiry is open; a refusal, deferral or conditioned extension would show whether the Authority treats the US route as a breach.

Japan's fuller Chikyu trials recovering deep-sea rare-earth mud near Minamitorishima

February 2027 · Milestone · Government of Japan’s own target · Awaiting the date

  • Seabed Mineral Extraction: “Japan's drilling vessel Chikyu retrieved rare-earth mud from about 5,700 metres near Minamitorishima in February 2026, with fuller trials planned for February 2027” Bears on whether a state-led route to seabed minerals inside national jurisdiction advances alongside the contested nodule routes the brief assesses.

African young scientists workshop at Institut Pasteur de Tunis toward a mirror-life statement

1 to 2 February 2027 · Conference · On an official calendar · Awaiting the date

  • Mirror Life: “The planned statement from African scientific leaders (Brown Pandemic Center project; the Tunis workshop is scheduled for 1–2 February 2027): does it appear, and with academies' institutional endorsement?” One of the brief's secondary tests: whether a statement from African scientific leaders appears, and with academies' institutional endorsement, bears on how widely the restraint position it records is held beyond the US, UK and European funders.

UK Food Standards Agency's cultivated-meat sandbox closes, by which the agency hoped to have completed safety evaluations of two cultivated products

February 2027 · Milestone · UK Food Standards Agency’s own target · Awaiting the date

  • Cellular Agriculture: “The FSA hopes, by The Times's report, to complete safety evaluations of two products by the sandbox's end in February 2027, and has told the trade press there is no fixed timeline.” Two completed evaluations, especially on food-grade media, would make the lower half of the published cost and emissions ranges the operating case and weaken the regulatory-time bottleneck; evaluations that slip past the sandbox, or that require pharmaceutical-grade inputs, would make the Risner range the operating case and confirm regulatory time as a financing condition.

EU deadline for interoperability of AI-generated content detectors

2 February 2027 · Comes into force · Fixed in law · Awaiting the date

  • Content Authenticity Infrastructure: “EU detector interoperability by 2 February 2027” Falls inside the brief's decisive-experiment window: if marking mandates bind, the labelled share of AI-generated media should bend at this date, testing the brief's central scepticism that the binding constraint is physical, not legal.

February 2027 formal negotiating round on the Pandemic Agreement PABS annex

15 to 19 February 2027 · Conference · On an official calendar · Awaiting the date

  • Pathogen-Agnostic Surveillance: “further formal rounds are scheduled for 15 to 19 February and 15 to 25 March 2027.” Progress or its absence bears on whether the pathogen access and benefit-sharing annex, the brief's open legal precondition, can reach the May 2027 Assembly.

EU battery passport becomes obligatory for EV, light-transport and industrial batteries

18 February 2027 · Comes into force · Fixed in law · Awaiting the date

  • Material Passports: “the battery passport becomes obligatory on 18 February 2027, which creates a dated before-and-after on a defined product class whose recovery statistics are already collected.” The obligation is the trigger for the brief's decisive before-and-after test of whether passports raise recovered mass and value per tonne; its taking effect fixes the date after which baselines can only be reconstructed.

Deadline under the amended EU standardisation request for AI Act harmonised standards on logging, human oversight and accuracy

28 February 2027 · Publication · On an official calendar · Awaiting the date

  • Clinical AI Validation: “Without those standards the logging and oversight obligations that would apply to AI medical devices have nothing an engineer can build against or an assessor can audit against.” Delivery by the deadline would give AI medical-device manufacturers a buildable logging and oversight specification some eighteen months before the August 2028 application date and soften the brief's dependency on unwritten standards; a slip would leave the 2028 obligations without one, which the brief treats as obligations no engineer can build against.

Completion of Japan's Rokkasho reprocessing plant by end of fiscal 2026

March 2027 · Milestone · Japan Nuclear Fuel Limited’s own target · Awaiting the date

  • Advanced Fission: “Rokkasho's current target is fiscal 2026, ending March 2027.” Completion on target would end a run of twenty-seven delays on the reprocessing half of the fuel cycle; a twenty-eighth would extend the slip record the brief applies to every dated programme in the subject.

International Seabed Authority Council, thirty-second session, Part I

8 to 19 March 2027 · Conference · On an official calendar · Awaiting the date

  • Seabed Mineral Extraction: “That session, the first part of the thirty-second, is scheduled for 8 to 19 March 2027, with the second part from 12 to 23 July 2027.” The next negotiating session on the exploitation regulations, bearing on the brief's record that adoption has been forecast and missed repeatedly, most recently for the end of 2026.

March 2027 formal negotiating round on the Pandemic Agreement PABS annex

15 to 25 March 2027 · Conference · On an official calendar · Awaiting the date

  • Pathogen-Agnostic Surveillance: “further formal rounds are scheduled for 15 to 19 February and 15 to 25 March 2027.” As the last scheduled round before the Assembly, its outcome bears directly on whether the annex the brief treats as the legal right to the sample can be adopted in May 2027.

International Seabed Authority's defence on the merits due in ITLOS Seabed Disputes Chamber Cases 34 and 35 (NORI and TOML v. ISA)

30 March 2027 · Milestone · On an official calendar · Awaiting the date

  • Seabed Mineral Extraction: “Nauru Ocean Resources Inc. and Tonga Offshore Mining Limited, both subsidiaries of The Metals Company, began proceedings before the Seabed Disputes Chamber of the International Tribunal for the Law of the Sea in June 2026.” The merits phase decides how the Authority may pursue contractors that seek United States permits over their contract areas, which bears on the brief's first bottleneck, title.

April to June 2027

ADRAS-J2 robotic capture and deorbit of an H-2A upper stage (JAXA CRD2 Phase II)

April 2027 to March 2028 · Result due · Astroscale and JAXA’s own target · Awaiting the date

  • Orbital Debris and Space Traffic: “ADRAS-J2, contracted to grapple the same stage and drag it down, is targeted for Japan’s fiscal 2027 on a launcher contracted on 1 September 2026.” This is the brief's decisive demonstration: a first capture of a large uncooperative object at a published price would move removal from reconnaissance to demonstrated capability, while failure or a major overrun would weaken the claim that remediation is an engineering problem rather than a permanent cost (Japan's fiscal 2027 is April 2027 to March 2028).

First Conventional Prompt Strike flight test from a Zumwalt-class destroyer

the second quarter of 2027 · Launch · US Navy’s own target · Awaiting the date

  • Hypersonic Flight: “The first CPS flight test from a Zumwalt-class destroyer is planned for the third quarter of fiscal 2027, two years after the original plan.” Decides whether the sea-based glide weapon exists, and whether a date already moved two years from the original plan is carried as a schedule or added to the brief's record of slipped schedules (third quarter of US fiscal 2027 is April to June 2027).

Launch of Orbit Fab's Kamino hydrazine depot with Astroscale U.S. geosynchronous refueller

the second quarter of 2027 · Launch · Orbit Fab and Astroscale U.S.’s own target · Awaiting the date

  • In-Space Servicing and Depots: “The plans as of November 2026 are a storable hydrazine depot (Orbit Fab’s Kamino, listed for the second quarter of 2027)” Would supply the first depot to fly and the first US military hydrazine refuelling in geosynchronous orbit, evidence the brief says is missing for orbital logistics as an operating layer rather than one-off demonstrations.

Rondo Energy's Heineken Portugal heat-storage project reaching its target date

April 2027 · Milestone · Rondo Energy’s own target · Awaiting the date

  • Energy Storage Revolutions: “Two further dates stand as they did in September 2026 because nothing could be found to move them: Rondo's Covestro plant targeting commissioning at end-2026 and its Heineken Portugal project April 2027.” A second dated test of whether thermal-storage delivery holds to schedule, against the brief's recording of such dates as intentions in a category whose dates slip.

Deadline for US water systems to complete initial PFAS monitoring

April 2027 · Comes into force · Fixed in law · Awaiting the date

  • Persistent Pollutant Remediation: “US systems complete initial monitoring by April 2027 and the share exceeding the limits is known” Would make known the share of US drinking-water systems exceeding the limits, the measurement on which the brief's horizon for treatment reaching the systems that need it rests.

Regulatory decision on Orano's Oak Ridge uranium enrichment project

30 April 2027 · Decision · On an official calendar · Awaiting the date

  • Small Modular Reactors: “Orano's Oak Ridge project is licensed for 7.4 million SWU with $900 million of federal funding and a regulatory decision due 30 April 2027.” Would show whether the largest new American enrichment project clears its regulatory step on schedule, bearing on the brief's account of the fuel base beneath advanced reactors.

FDA action on uniQure's AMT-130 Huntington's gene therapy under accelerated approval

1 May 2027 · Decision · On an official calendar · Awaiting the date

  • Neurodegeneration Reversal: “The application, submitted in September 2026, was accepted for priority review under accelerated approval with a target date of 1 May 2027” Tests the brief's reading of accelerated approval in this field: a decision on external-control evidence shows whether the regulator accepts a historical comparator the brief treats as drifting, with the randomised confirmatory trial unlikely to report before about 2030.

PIXEurope photonic pilot line opens its new infrastructure to users

May 2027 · Milestone · PIXEurope (EU photonic pilot line)’s own target · Awaiting the date

  • Integrated Photonics: “Its stated schedule as of June 2026: access to existing partner infrastructure from November 2026, new infrastructure from May 2027, and full capacity including multi-project wafer runs by May 2028.” Tests the brief's claim that public pilot lines are several years behind the private ramp: new public infrastructure on its stated date narrows that lag, and a slip widens it.

World Health Assembly decision on the Pandemic Agreement's pathogen access and benefit-sharing annex

May 2027 · Vote · On an official calendar · Awaiting the date

  • Pathogen-Agnostic Surveillance: “The annex is next scheduled for rounds in January, February and March 2027 with adoption sought in May 2027, a schedule of a kind that has already been missed once.” Adoption would open the Pandemic Agreement for signature and begin to establish the right to the sample the brief names as a precondition; a third miss would extend the record against which the brief reads the date.
  • Global Cooperation Models: “The eighth negotiating round on the enabling annex was scheduled for 14–18 September 2026 , with the outcome due either at the May 2027 World Health Assembly or at a special session.” Adoption of the annex is the precondition for signature and ratification to begin, so it decides whether the Pandemic Agreement acquires a signature at all; the brief notes the outcome may instead come at a special session.
  • Existential Risk Governance: “That annex missed its May 2026 deadline; a seventh round ended on 17 July 2026 with contractual arrangements, laboratory networks and the definition of benefits still open; an eighth was scheduled for 14–18 September 2026, and this brief has not confirmed what it produced; the annex goes to the Assembly in May 2027 or an earlier special session” Adoption would open the Pandemic Agreement for signature, which the brief records cannot happen before the annex is adopted, so its ratification count of zero could begin to move; another deferral leaves it there.

Second session of the UN Global Dialogue on AI Governance, New York

3 to 4 May 2027 · Conference · On an official calendar · Awaiting the date

  • AI Governance: “The Dialogue’s co-chairs’ summary, expressly not a negotiated outcome, lists independent evaluation mechanisms among the evidence gaps; a second session is scheduled for New York on 3–4 May 2027.” Would show whether independent evaluation mechanisms, listed as an evidence gap at the first session, move toward any institutional form, bearing on the brief's view that the UN layer and national evaluators sit far apart.

Completion of the planning phase for Dayforce, the replacement for Canada's Phoenix pay system

June 2027 · Milestone · Government of Canada’s own target · Awaiting the date

  • Future Civil Services: “the Dayforce planning phase is to complete by June 2027.” Tests the schedule-compression risk the Auditor General flagged in advance and the brief's base rate that targets in this subject are more often restated than met.
  • Future Public Administration: “The Dayforce planning phase is to complete by June 2027” The first dated evidence on the brief's frontier question of whether an administration can learn from a documented failure of the same shape, the pay-system replacement it calls the scheduled test.

Deep Sky Alpha completes its first year of Isometric-certified deliveries, set against its stated capacity of 3,000 tonnes a year

June 2027 · Milestone · Deep Sky’s own target · Awaiting the date

  • Carbon Removal Verification: “Tracking delivered against due tonnes by contract vintage, rather than delivered against cumulative contracted, would separate supplier failure from contract timing.” Alpha's first certificates were issued on 29 June 2026 under a 10,000-tonne Microsoft and RBC contract running to 2034, with deliveries stated as quarterly. A year of issuance records gives one supplier's delivered-against-due record for that vintage. No announcement read gives the tonnes issued; the only public figure is a first injection reported as 14 tons in May 2026.
  • Carbon Capture at Scale: “And the sixth is delivery itself, which nobody discounts for.” Sets a year of certified tonnes against the site's stated 3,000 tonnes a year, the first full-year delivery ratio for a multi-vendor direct-air-capture site.

Juventas CubeSat landing attempt on Dimorphos

June 2027 · Milestone · ESA Hera mission (date per CNES)’s own target · Awaiting the date

  • Planetary Defense: “Juventas, whose release its own team places in early 2027 and the French agency's schedule places in January 2027, with a landing attempt in June 2027” A landing with the gravimeter running would add surface-gravity data to the bulk-density determination on which the brief's factor-of-two uncertainty in beta rests.

Expiry of United Therapeutics' five-year target for human trials of printed lungs

June 2027 · Milestone · United Therapeutics and 3D Systems’s own target · Awaiting the date

  • Lab-Grown Organs: “human clinical trials of three-dimensional-printed, cellularised lungs would follow within five years, with kidneys and livers listed as under development and no timeline attached; that five-year window closes in June 2027” An announced human trial by then would bear on the brief's assessment that the organoid field is pulled toward toxicology rather than transplantable organs; none would leave a stated five-year prediction unmet.

The first half of 2027, no closer date given

Full proof-of-concept data for Absci's machine-learning-designed antibody

the first half of 2027 · Result due · Absci’s own target · Awaiting the date

  • Generative Biomolecular Design: “Fifth, a natural experiment already running: the clinical readouts scheduled for late 2026 and early 2027.” Completes the brief's running natural experiment: a clean efficacy signal would change the capital available to the field and a null would change it the other way, without settling the de novo design question.

Agility Robotics' Digit 5 release

the first half of 2027 · Milestone · Agility Robotics’s own target · Awaiting the date

  • Embodied AI and Robot Foundation Models: “Agility's Digit 5 release is expected in the first half of 2027” A release on schedule would extend the one vendor-reported warehouse operating record the brief cites, still without an intervention rate; a slip would join the humanoid dates the brief flags as moved.

Interim event-free survival analysis of the randomised first-line consolidation trial of an off-the-shelf CD19 CAR-T, anticipated mid-2027

the first half of 2027 · Result due · Allogene Therapeutics’s own target · Awaiting the date

  • Universal-Donor Cells: “Interim event-free survival in the first-line consolidation trial is anticipated in mid-2027 and the primary analysis in mid-2028, against a day-45 surrogate that has so far shown 58.3% clearance against 16.7%.” A survival separation would convert the only randomised evidence for off-the-shelf cell therapy from a day-45 surrogate into clinical benefit, and would support the brief's reading that a transient allogeneic product can work without persisting; no separation would leave the 41.6-point clearance difference as a biomarker effect and strengthen the case that rejection costs efficacy.

Topline readout of Alto Neuroscience's EEG-biomarker-selected phase 2b depression trial

the first half of 2027 · Result due · Alto Neuroscience’s own target · Awaiting the date

  • Precision Neuropsychiatry: “The EEG-biomarker depression trial was expected to read out by mid-2026 and in May 2026 was moved to the first half of 2027.” Tests the brief's assessment that biomarker-defined drug trials have missed or slipped: a topline result on marker-positive patients shows whether the interim win, reported after site and subject exclusions, holds up.

Artemis III crewed Earth-orbit docking test of Orion with commercial lunar landers

the first half of 2027 · Launch · NASA’s own target · Awaiting the date

  • Deep Space Infrastructure: “On 27 February 2026 the programme was restructured: Artemis III became a crewed Earth-orbit docking flight targeted for mid-2027, and the first crewed landing moved to Artemis IV, targeted for 2028.” A mid-2027 flight would confirm the restructured sequence that places the brief's two-crewed-vehicle network test on Artemis IV, while a slip would push that test, and the next check on the brief's capacity claim, later still.
  • Lunar Industry: “Artemis III became a crewed low-Earth-orbit flight on which Orion docks with one or both commercial landers, targeted for mid-2027” Would show whether the commercial landers both briefs depend on can dock with Orion on the stated date, a test of the rule that no stated date in this domain has held and a gate on the first crewed landing.

Also named in: Mars Colonization

AST SpaceMobile reaching about 45 direct-to-handset satellites in orbit

the first half of 2027 · Milestone · AST SpaceMobile’s own target · Awaiting the date

  • Megaconstellation Externalities: “The direct-to-handset operator had twelve satellites of both blocks in orbit in October 2026, one more having been lost in April when a launch vehicle left it in the wrong orbit, against a stated target of about 45 by early 2027.” Tests the brief's finding that deployment schedules in this field have been wrong in one direction, and sets how soon the large, unmeasured direct-to-handset spacecraft weigh in its brightness assessment.

Boston Dynamics' first Atlas customers beyond Hyundai and Google DeepMind

the first half of 2027 · Milestone · Boston Dynamics’s own target · Awaiting the date

  • Embodied AI and Robot Foundation Models: “Agility's Digit 5 release is expected in the first half of 2027 and Boston Dynamics' first customers beyond Hyundai and Google DeepMind in early 2027.” Customers outside the owner and a research partner would be the first arm's-length demand for production Atlas, bearing on the brief's separation of vendor deployment claims from independent uptake.

Grid connection of Russia's BREST-OD-300 lead-cooled fast reactor

the first half of 2027 · Milestone · Rosatom’s own target · Awaiting the date

  • Advanced Fission: “Russia's lead-cooled demonstrator was about 70% assembled in January 2026, with physical launch scheduled for 2026 and grid connection targeted for the first half of 2027.” Grid connection would begin the power-scale operating record for a lead coolant whose corrosion limits the brief says nobody has written down; it does not bear on cycle closure, which waits for the reprocessing module.

Licence application for mRNA CAR-T in acetylcholine-receptor-positive myasthenia gravis

the first half of 2027 · Milestone · Cartesian Therapeutics’s own target · Awaiting the date

  • Immune Engineering: “with data expected in the first quarter of 2027 and a licence application planned for mid-2027.” A filing would be the field's first licence application resting on placebo-controlled evidence, bearing on the brief's concern that the first approvals rest on single-arm data.

Changjiang Hualong One Units 3 and 4 fully operational

the first half of 2027 · Milestone · CNNC’s own target · Awaiting the date

  • Small Modular Reactors: “The 1,100 MWe Hualong One Unit 3 poured first concrete in March 2021, reached first criticality on 10 July 2026 and was connected to the grid on 1 August 2026 ; trade reporting of 8 September 2026 has it and its twin scheduled to be fully operational in early 2027.” Extends the brief's Changjiang head-to-head, its decisive comparison of a large unit against the Linglong One small reactor on one site, where the small unit had not been fuelled as of November 2026.

Climeworks next-generation direct-air-capture field tests

the first half of 2027 · Milestone · Climeworks’s own target · Awaiting the date

  • Carbon Removal Verification: “Mammoth’s container upgrades are due by the end of 2026 and next-generation field tests in early 2027, on the operator’s schedule” Would show whether the operator's next-generation technology reaches field testing on schedule, bearing on whether contracted direct-air-capture volumes can be delivered.

US commercial launch of Compass Pathways' COMP360 psilocybin for treatment-resistant depression

the first half of 2027 · Milestone · Compass Pathways’s own target · Awaiting the date

  • Precision Neuropsychiatry: “The psilocybin sponsor expected in May 2026 to be launch-ready by the end of 2026 and in November 2026 expected a launch in the first half of 2027, subject to approval and rescheduling.” Bears on the brief's dependency claim that approval alone does not put the product on sale: launch inside the window, or a slip, shows whether federal and state rescheduling moved on the sponsor's timetable.

End of Dark Eagle operational testing and the Pentagon test evaluator's assessment

the first half of 2027 · Result due · US Army’s own target · Awaiting the date

  • Hypersonic Flight: “As reported then, testing had not produced enough data to assess its “operational effectiveness, suitability and survivability”, and the evaluator expected sufficient data only when operational testing ends, around early 2027.” Would show whether the land-based glide weapon, fielded ahead of evaluation, works as fielded, which bears on the brief's reading that the glide weapon is the demonstrated part of the frontier.

FAA pilots begin training on Joby's aircraft ahead of type-certification flight tests

the first half of 2027 · Milestone · Joby Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “Joby tied the start of its American passenger flights to FAA pilots beginning type-certification flight tests; in November 2026 it expected those pilots to begin training on the aircraft in the first half of 2027, where its November 2025 statement had put them at the controls in 2026.” The gating step for Joby's American passenger flights, which the brief says wait on agency test pilots; it has already moved once from 2026.

Enrolment completes in second randomised phase 3 of CD19 CAR-T in myasthenia gravis

the first half of 2027 · Milestone · Kyverna Therapeutics’s own target · Awaiting the date

  • Immune Engineering: “A second randomised phase 3, of an autologous CD19 product in generalised myasthenia gravis, is enrolling with completion expected by mid-2027.” Completion on schedule would add a second controlled trial for an autologous product, though like the first it measures response at months and leaves the brief's relapse-at-years question intact.

FDA decision on MCO-010 optogenetic gene therapy for retinitis pigmentosa

the first half of 2027 · Decision · On an official calendar · Awaiting the date

  • Sensory Restoration: “its applications were accepted in the United States on 9 September 2026 and in Japan on 1 October 2026, with decisions expected in the first half of 2027.” A decision would show whether a regulator accepts a sham-controlled logMAR gain from a very low baseline as benefit, which bears on the brief's unsolved endpoint problem for ultra-low vision.

Japanese regulatory decision on MCO-010 optogenetic gene therapy

the first half of 2027 · Decision · On an official calendar · Awaiting the date

  • Sensory Restoration: “Regulatory filings for a gene-agnostic optogenetic therapy accepted in the United States on 9 September and Japan on 1 October 2026, decisions expected in the first half of 2027.” A second regulator's decision on the same logMAR evidence would bear on the brief's endpoint problem and on whether its 2026 regulatory divergence between hearing and vision restoration narrows.

NASA award of the commercial low-Earth-orbit station contract

the first half of 2027 · Decision · On an official calendar · Awaiting the date

  • Space Habitats: “Expect one commercial station rather than six: NASA's own clarification is that the projected $1–1.5 billion for FY2026–31 supports one, and the contract that buys it is due to be awarded in spring 2027 on proposals due 14 December 2026.” The award tests the brief's expectation of one commercial station rather than six and starts the build clock on which its estimate of initial capability around 2032 rests.
  • Commercial Space Stations: “The third is a policy result with a date: the award anticipated on 15 April 2027.” Two early-development awards with no stated route to funding both for services would confirm the brief's reading of the programme as a procurement of one provider; funding two through services would contradict NASA's one-station arithmetic; any winning bid that prices crew transport from a provider other than SpaceX would weaken the transport-monopoly position.

Nittobo's tripled T-glass capacity reaches the market

the first half of 2027 · Milestone · Nittobo’s own target · Awaiting the date

  • The Physical Stack of AI: “Nittobo’s tripled T-glass capacity is due on the market in mid-2027.” Tests the brief's claim that substrates bind alongside memory, packaging and electricity: new glass-cloth supply on time would ease one of the four layers it says were binding at once.

Updated public-facing questions of the quadrennial ozone assessment

the first half of 2027 · Publication · On an official calendar · Awaiting the date

  • Global Cooperation Models: “The next quadrennial ozone assessment's core report is due at the end of 2026, its executive summary in late 2026 and its public-facing update in early 2027.” Completes the refresh of the independent measurement on which the brief rests the ozone regime's status as the field's one clean result.

Prime Medicine's planned biologics licence application for PM359 in chronic granulomatous disease, the first for a prime-editing product

the first half of 2027 · Milestone · Prime Medicine’s own target · Awaiting the date

  • Gene Writing: “Component count is a bottleneck that looks administrative and is not. A prime-editor-plus-integrase insertion is four separate manufactured items, each with its own release specification and stability profile, against two for a base editor.” The first licence application for a writing-class product sets the manufacturing and controls template an insertion product with twice the component count would have to meet, and whether a shelved programme can be filed at all tests this brief's claim that capital, not chemistry, is the constraint.

First images from the Nancy Grace Roman Space Telescope

the first half of 2027 · Result due · NASA’s own target · Awaiting the date

  • Mega-Telescopes: “Roman lifted off at 07:26 EDT on 30 August 2026 with a field of view at least 100 times Hubble's and a coronagraph aboard, on a three-month cruise with first images expected in early 2027.” First light opens the in-flight test of the coronagraph that the brief makes decisive for the next flagship's case, whose results it records as not yet existing; a delay defers that test.

Starship reaching weekly flight cadence, per SpaceX's chief executive

the first half of 2027 · Milestone · SpaceX’s own target · Awaiting the date

  • Orbital Data Centres: “The company's chief executive said on 20 October 2026 that he expected weekly flights at some point in the first half of 2027 and twice weekly by the end of that year.” Every launch-cost parity threshold the brief cites assumes roughly weekly reuse of a fully reusable launcher, so achieved cadence bears directly on its assessment that orbital compute economics do not yet close.

UK regulations banning romantic companion chatbots for under-18s come into force

the first half of 2027 · Comes into force · UK Government’s own target · Awaiting the date

  • AI Companions: “The United Kingdom’s first regulations were expected before the end of 2026 with force from spring 2027” Force from spring 2027 would add a national ban to the brief's comparison of regimes in a jurisdiction whose principal online-safety statute does not reach the standalone companion; a slip would leave that gap open.

First deployment of York Space Systems' 200-300 km stored-propellant bus

the first half of 2027 · Launch · York Space Systems’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “York Space Systems announced a 200 to 300 km bus on 2 September 2026 with stored xenon or krypton and a design life above three years, first deployment targeted for mid-2027.” Tests the brief's finding that the largest commitments below 350 km carry propellant rather than waiting for air-breathing propulsion.

July to September 2027

Most duties of California's 2026 companion chatbot child-safety statute become operative

1 July 2027 · Comes into force · Fixed in law · Awaiting the date

  • AI Companions: “New York’s law takes effect 1 January 2027; California’s takes effect the same day with most duties operative 1 July 2027 and first audits due from 2029.” Operative defaults for child users, including memory and notifications off, session and daily caps and measures against claims of sentience, would move the brief's design-surface table from statute into practice; a delay or successful challenge would move it back.

Chrome's quantum-resistant root store

the third quarter of 2027 · Milestone · Google (Chrome)’s own target · Awaiting the date

  • Post-Quantum Migration: “The certificate milestone now has dated intermediate readouts: a staging service from Let’s Encrypt targeted for late 2026, public bootstrapping by log operators in the first quarter of 2027, and Chrome’s quantum-resistant root store in the third quarter of 2027.” Tests the brief's position that broad browser trust in post-quantum certificates comes no earlier than 2027 and rests on one vendor's plan for a new kind of certificate.

NIH makes the first R3PEATS awards, Year 1 of the revised concept, with $19.43 million planned for fiscal 2027

the third quarter of 2027 · Milestone · US Department of Health and Human Services and National Institutes of Health’s own target · Awaiting the date

  • Research Integrity Infrastructure: “An earlier one-page version puts it at $175 million over five years; the revised concept posted in May 2026 puts it at $161.71 million over fiscal years 2027 to 2031, for four Replication Centers, three metascience testbeds, an education centre and a coordination centre, with $19.43 million in the first year.” Awards by the end of fiscal 2027 would make R3PEATS the first replication capacity funded as standing infrastructure and move the brief's techtree requirement for standing replication centres from proposed to funded; no awards, or a first year smaller than $19.43 million, would confirm the brief's reading that replication remains one-off grants and volunteer labour and that the concept is a proposal rather than an appropriation.

First tanker flight of the propellant campaign for Starship's uncrewed lunar landing

the third quarter of 2027 · Launch · SpaceX’s own target · Awaiting the date

  • Mars Colonization: “NASA schedule slides reported the same week placed a propellant transfer demonstration between two Starships in the first quarter of 2027 , the first tanker launch for the uncrewed lunar landing demonstration in the third quarter, and that landing in the fourth.” Would show whether the refuelling campaign, for which officials declined to give a launch count, has begun on the schedule that the uncrewed landing and every crewed date in the brief depend on.
  • In-Space Servicing and Depots: “as of 14 November 2026 it sat in the first quarter of 2027 on NASA’s schedule, with the first tanker for the uncrewed lunar landing in the third quarter and the landing in the fourth.” Tests the brief's reading that a tanker campaign is a cadence bet, since it would be the first use of ship-to-ship refuelling in service of a mission rather than as a demonstration.

International Seabed Authority Council, thirty-second session, Part II

12 to 23 July 2027 · Conference · On an official calendar · Awaiting the date

  • Seabed Mineral Extraction: “That session, the first part of the thirty-second, is scheduled for 8 to 19 March 2027, with the second part from 12 to 23 July 2027.” The second 2027 negotiating session on the exploitation regulations, bearing on the brief's record of missed adoption dates and on whether threshold values reach the Council that year.

EU deadline for training-data summaries of general-purpose models marketed before August 2025

August 2027 · Comes into force · Fixed in law · Awaiting the date

  • Synthetic Data and Training Provenance: “training-data summaries for models placed on the EU market before August 2025 by August 2027” Extends the brief's Article 53 natural experiment to models already in use, testing its claim that no institution can yet certify what any frontier model was trained on.

Deadline for EU Member States to have national AI regulatory sandboxes operating

2 August 2027 · Comes into force · Fixed in law · Awaiting the date

  • AI Governance: “the national sandboxes, now due by 2 August 2027, will generate the only cross-jurisdictional variation in AI supervision that anyone is going to get” Sandboxes in place by the deadline would create the only cross-jurisdictional variation in AI supervision the brief identifies; late designation, as with the 2025 authority deadline, would thin or remove it.

End of ESA's Hera mission at Didymos, as listed by CNES

September 2027 · Milestone · ESA Hera mission (date per CNES)’s own target · Awaiting the date

  • Planetary Defense: “What is scheduled for Hera: detailed Dimorphos images on 25 November 2026, closer characterisation from December 2026, CubeSat release in early 2027, a Juventas landing attempt around June 2027 and an end of mission that one partner agency lists as September 2027.” Marks the end of the window in which the mission itself can deliver the masses and bulk density the brief treats as decisive; an extension, or a density published before it, would bear directly on the beta uncertainty.

Launch of NASA's NEO Surveyor infrared asteroid-survey telescope

September 2027 · Launch · NASA’s own target · Awaiting the date

  • Planetary Defense: “NASA's mission page, as updated on 3 November 2026, gives launch no earlier than September 2027 — the same date the September 2026 text of this page carried.” Launch starts the ten-to-twelve-year clock in the principal investigator's claim that the telescope brings completeness to the 90% mandate, which the brief holds open; a slip toward the committed June 2028 date would push that clock back.

US federal agencies' second round of AI compliance plans under OMB memorandum M-25-21 falls due, two years after the first

September 2027 · Publication · Fixed in law · Awaiting the date

  • Public-Sector AI Assurance: “Compliance plans were due within 180 days of the memorandum and every two years thereafter until 2036.” Plans that report how many waivers were granted, how many presumed high-impact uses were determined not high-impact and on what grounds, and how many systems were discontinued would supply the response-stage numbers the brief says no one publishes; plans that again describe process alone would confirm its reading that the American regime measures its own designations rather than its systems.

NASA ESCAPADE twin orbiters arrive at Mars

7 to 9 September 2027 · Milestone · On an official calendar · Awaiting the date

  • Mars Colonization: “NASA's two small ESCAPADE orbiters, launched on a New Glenn on 13 November 2025, which made their trans-Mars injection burns during Earth flybys on 7 and 9 November 2026 and are due at Mars on 7 and 9 September 2027.” Arrival would confirm the only Mars departures the brief could find in the window; the brief notes the orbiters carry nothing bearing on landing, closure or dose, so its central claims are not moved.

October to December 2027

Completion of China's BEST burning-plasma tokamak at Hefei

the fourth quarter of 2027 · Milestone · Chinese state fusion programme (BEST, Hefei)’s own target · Awaiting the date

  • Commercial Fusion: “China's BEST tokamak at Hefei is targeted for completion end-2027 , had a 400-tonne, 18-metre Dewar base installed in October 2025, was reported by state media in January 2026 to be more than half assembled, and states goals of burning D-T plasma and generating electricity from fusion for the first time .” Tests the brief's state-led scale-up path against the private schedules it contrasts with it; completion bears on assembly progress only, since the electricity-generation demonstration is placed around 2030.

DARPA Otter full mission: air-breathing thrust measured against drag in orbit

the fourth quarter of 2027 to the third quarter of 2028 · Result due · DARPA’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “Defence press reported on 6 November 2026 that a scaled precursor of under 24 hours is planned for late 2027 and the full mission for fiscal 2028.” This is the brief's decisive experiment: thrust at or above drag on collected air, measured on the same vehicle for weeks below 250 km, would replace a ground record of 6 mN against 26 mN with flight evidence; the brief flags the fiscal-2028 date as unpublished by the programme.

Osivax's first phase 1/2 study of OVX836 combined with seasonal influenza vaccine

the fourth quarter of 2027 · Milestone · Osivax’s own target · Awaiting the date

  • Universal Vaccines: “a first phase 1/2 study of OVX836 combined with a seasonal influenza vaccine in the fourth quarter of 2027” A start on schedule would show the conserved-internal-target strategy continuing after its 24 per cent phase 2b result, recast as an add-on to seasonal vaccines rather than a universal one; a slip or cancellation would move the brief's ranking of that strategy further down.

Uncrewed Starship lunar landing demonstration

the fourth quarter of 2027 · Launch · SpaceX’s own target · Awaiting the date

  • Mars Colonization: “the uncrewed landing demonstration that must precede any crew sat in the fourth quarter of 2027 on the schedule shown that month.” The demonstration must precede any crewed Starship landing; its timing tests the brief's evenhanded rule that every forward date in the domain was set by a party whose previous date had failed.
  • In-Space Servicing and Depots: “as of 14 November 2026 it sat in the first quarter of 2027 on NASA’s schedule, with the first tanker for the uncrewed lunar landing in the third quarter and the landing in the fourth.” Would show whether a full refuelling campaign can be closed end to end, which the brief treats as the dependency under every architecture that assumes tanking, including the lunar landing NASA has contracted.

Tower Semiconductor's converted Japanese fab adds 300 mm silicon photonics capacity

the fourth quarter of 2027 · Milestone · Tower Semiconductor’s own target · Awaiting the date

  • Integrated Photonics: “New 300 mm photonic capacity in Japan is targeted for the fourth quarter of 2027” Bears on the brief's account of foundry capacity booked through prepaid contracts: new 300 mm capacity on time changes how far start-ups and national programmes are bidding against prepaid commitments.

Completion of Idemitsu Kosan's solid-electrolyte plant at several hundred tonnes a year

December 2027 · Milestone · Idemitsu Kosan’s own target · Awaiting the date

  • Advanced Battery Technologies: “the electrolyte plant completes at the end of 2027 — months before the deadline — at several hundred tonnes a year.” The brief reads Toyota's solid-state schedule off this plant, so its completion date and capacity bear directly on whether the deadline is met by limited batches.

EU AI Act high-risk requirements apply to Annex III systems, as deferred to December 2027

2 December 2027 · Comes into force · Fixed in law · Awaiting the date

  • AI Governance: “the high-risk requirements from 2 December 2027 for Annex III systems and 2 August 2028 for Annex I products.” Application on the rescheduled date would bring the high-risk tier into force sixteen months late on the brief's arithmetic; a further move would confirm the brief's treatment of these dates as a slipped schedule.
  • Standards as Governance: “The decisive experiment is already running and has a date: whether European harmonised standards for high-risk artificial intelligence exist and are cited in time for the December 2027 obligations, or the deadline moves a second time.” This is the brief's decisive experiment: harmonised standards cited in time would show the private committees can supply the law's operative content, and a second deferral would add to its evidence that the law moves when standards are late.
  • Public-Sector AI Assurance: “AI-Assisted Governance records that the European high-risk obligations now apply from 2 December 2027, with systems already in use by public authorities given until 2 August 2030; those obligations include the fundamental-rights impact assessment that public deployers must complete.” Application on the rescheduled date would bring the first fundamental-rights impact assessment for public deployers into force, under a definition the brief shows excludes rule-based systems, and would let the brief test whether European assurance reaches public administration at all; a further deferral would extend the brief's record of assurance deadlines that move and leave the European instrument with no obligations on any public system.

The second half of 2027, no closer date given

Second Blue Moon Mark 1 flight delivering VIPER to a lunar polar cold trap

the second half of 2027 · Launch · Blue Origin’s own target · Awaiting the date

  • Lunar Industry: “VIPER or an equivalent metre-class drill delivered to a polar cold trap is the single event that would move the most numbers; as of November 2026 it is scheduled on the second Blue Moon Mark 1 for late 2027, conditional on the first Mark 1 succeeding” This is the brief's decisive experiment: a metre-class drill in a permanently shadowed region would begin to settle where lunar volatiles are, how accessible they are and in what form, which every extraction figure in the brief depends on.

Restart of the 835 MW Crane reactor, formerly Three Mile Island Unit 1

the second half of 2027 · Milestone · Constellation Energy’s own target · Awaiting the date

  • AI Electricity Demand: “The furthest advanced, the 835 MW restart of a Pennsylvania reactor under a 20-year contract signed in September 2024, is targeted for the second half of 2027, a year ahead of its original 2028 date.” The restart is the brief's furthest-advanced case of firm supply contracted to data-centre load, so its timing and delivered output bear on the brief's claim that what exists is a fraction of what is announced, under transmission limits it records until December 2030.
  • The Physical Stack of AI: “The Crane restart was targeted for the second half of 2027 as of July 2026.” Part of the 2028 cohort the brief treats as its decisive test; a restart date already pulled forward from 2028 is evidence on whether restarts buy schedule against the electricity layer the brief calls slowest.

DARPA Otter scaled precursor flight, under 24 hours, of an air-breathing spacecraft

the second half of 2027 · Launch · DARPA’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “Defence press reported on 6 November 2026 that a scaled precursor of under 24 hours is planned for late 2027 and the full mission for fiscal 2028.” Would be the first in-orbit step of the programme the brief names as the closest scheduled attempt at its decisive experiment, though a flight of under 24 hours cannot show drag compensation sustained for weeks.

Launch of Eagle-1, the European quantum key distribution satellite for EuroQCI

the second half of 2027 · Launch · European Space Agency, European Commission and SES’s own target · Awaiting the date

  • Quantum Networks: “Eagle-1 is due to launch in late 2027 for three years of in-orbit validation” Begins the in-orbit validation on which EuroQCI's space segment depends, and adds a further data point to the brief's record of slipped schedules in this field.

Eden GeoPower starts a stimulated-hydrogen field pilot with an unnamed partner

the second half of 2027 · Launch · Eden GeoPower’s own target · Awaiting the date

  • Geologic Hydrogen: “Eden GeoPower said in August 2026 that a hydrogen pilot with a partner could start late in 2027.” A start that later publishes kilograms produced and a decline curve would supply the first stimulated field rate the brief lacks and could move its speculative claim that stimulation only relocates the flow-rate problem; a slip leaves stimulated rates resting on extrapolations from a 13-day laboratory record.

Einstein Telescope site decision by an independent scientific committee

the second half of 2027 · Decision · On an official calendar · Awaiting the date

  • Multi-Messenger Astronomy: “Einstein Telescope bid documents are due by the end of 2026 and a site decision in the second half of 2027” Settles the site and with it the L-shaped versus triangle geometry, resolving the question the brief says has held up governance and left Europe's ground observatory without a legal entity.

Closing of GE Vernova's $9 billion acquisition of Trench Group

the second half of 2027 · Milestone · GE Vernova’s own target · Awaiting the date

  • The Physical Stack of AI: “On 28 October 2026 GE Vernova agreed to buy Trench Group, a maker of high-voltage bushings, instrument transformers and coils, for $9 billion, closing expected in late 2027, a purchase its chief executive tied to lead times and supply certainty.” Bears on the brief's reading that equipment makers are integrating around electrical-equipment lead times; completion or failure shows whether vertical integration proceeds as a response to the bushing and transformer queue.

GXO and Apptronik first North American humanoid deployment

the second half of 2027 · Milestone · GXO and Apptronik’s own target · Awaiting the date

  • Embodied AI and Robot Foundation Models: “GXO and Apptronik plan trials from 2027 and a first North American deployment in late 2027, toward up to 1,000 robots over four years, all conditional on unstated targets.” Whether a letter of intent signed on 12 November 2026 becomes a deployment in late 2027 tests the brief's reading that such schedules are conditional on unstated targets.

Oklo Aurora-INL powerhouse at Idaho National Laboratory reaches operation

the second half of 2027 to the first half of 2028 · Milestone · Oklo’s own target · Awaiting the date

  • Advanced Fission: “Aurora-INL is targeted for late 2027 to early 2028 and Aurora-Ohio for early 2030.” Operation within the stated window would be a first-of-a-kind advanced reactor meeting a vendor date; a slip would add to the brief's record that every date in this field belongs to a programme that has already moved one.

Oxford PV production start at a new perovskite-silicon tandem manufacturing site

the second half of 2027 to the first half of 2028 · Milestone · Oxford PV’s own target · Awaiting the date

  • Perovskite Tandem Photovoltaics: “In July 2024 Oxford PV expected niche-market scale in 2025, residential entry in 2026 and high-volume manufacturing in 2026–2027, and in September 2024 a gigawatt-scale plant “up and running in 2026–27”; in January 2026 the company was scouting new sites and aiming to start production in late 2027 or early 2028.” Tests the brief's record of serially moved tandem manufacturing dates and its ladder placing large shipments of an independently tested module no earlier than 2028-2029.

Samsung SDI all-solid-state battery mass production at its Ulsan plant

the second half of 2027 · Milestone · Samsung SDI’s own target · Awaiting the date

  • Advanced Battery Technologies: “On Samsung SDI, where the September 2026 edition could attach no number, there is now a reported schedule and no primary one: a compiled engineering timeline revised on 5 November 2026 has the company starting all-solid-state mass production in the second half of 2027 at its Ulsan plant” Would test a reported and uncorroborated Korean all-solid-state schedule, which the brief carries only as reported.

Tesla's first Optimus deliveries to outside customers

the second half of 2027 · Milestone · Tesla’s own target · Awaiting the date

  • Embodied AI and Robot Foundation Models: “Tesla's outside Optimus deliveries are put towards the end of 2027 — on a programme that secured parts for a fifth or less of its 2025 target.” Outside deliveries would be the first test of Tesla's humanoid programme against external customers, on a programme the brief records as having secured parts for a fifth or less of its 2025 target.

Offshore integration and commissioning of The Metals Company's converted production drillship

the second half of 2027 · Milestone · The Metals Company’s own target · Awaiting the date

  • Seabed Mineral Extraction: “The first production system is a single converted drillship with a stated nameplate of 3.0 million wet tonnes a year. Under the company's plan of 12 November 2026 it starts at about 1 million tonnes a year, possibly 1.5 million in the second year, with commissioning targeted for the fourth quarter of 2027 and conversion to full capacity in the third year.” A step in the brief's decisive chain from permit to sale: a vessel commissioned with no port of landing, or a slip, would locate the binding constraint in an industry the brief describes as one vessel deep.

First human use of TransMedics' kidney perfusion device

the second half of 2027 · Milestone · TransMedics’s own target · Awaiting the date

  • Ex-Vivo Organ Repair: “The leading vendor’s kidney device reaches its first human use, scheduled on 5 November 2026 for the second half of 2027” Starts the test the brief sets, against an American kidney nonuse rate of 29.3 per cent, of whether machine perfusion moves kidneys as it moved livers.

First flight of DARPA's X-65 CRANE active-flow-control demonstrator

the second half of 2027 · Launch · DARPA’s own target · Awaiting the date

  • Frontier Aerospace Programs: “The X-65 CRANE , DARPA's active-flow-control demonstrator, has slipped from a planned first flight in summer 2025 to late 2027 — more than two years — on “technical and supply chain challenges” One of the two vehicles the brief names as near-term evidence, so a first flight would supply the first flight data on active flow control, while a further slip would extend a delay already beyond two years.

Xanadu's one-year contract extension under DARPA's Quantum Benchmarking Initiative, building on its Stage B work and provisionally approved in October 2026, reaches the end of its term

the second half of 2027 · Milestone · On an official calendar · Awaiting the date

  • Fault-Tolerant Quantum Computing: “None appeared in the Stage C announcements up to 7 October 2026, which DARPA says is not a rejection.” Promotion to Stage C would put Xanadu's design before the government team that tests whether a concept can be built as designed, and would change the brief's reading of the Canadian position; the extension, announced by the company on 19 October 2026 for up to US$10 million, keeps it in Stage B for about a year. The term's end date is the Institute's reading of a one-year extension from October 2026, not a date DARPA has published.

2027, no closer date given

Launch of Albedo's second satellite, Vicinity-1, follow-on to Clarity-1

2027 · Launch · Albedo’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “York’s stored-propellant bus is targeted for mid-2027 and Albedo’s second satellite for 2027.” Could supply the low-altitude drag measurement Clarity-1 did not report, bearing on the brief's judgement that the claimed five-year lifespan at 275 km is a model output rather than a measurement.

Completion of enrolment in the randomised first-line consolidation trial of an off-the-shelf CD19 CAR-T, at about 220 to 250 patients

2027 · Milestone · Allogene Therapeutics’s own target · Awaiting the date

  • Universal-Donor Cells: “Enrolment is planned to complete by the end of 2027 — at about 220 patients in the sponsor’s account and about 250 in one conference report of it — with an interim survival analysis anticipated in mid-2027 and the primary analysis in mid-2028.” Full enrolment makes the field's only randomised test interpretable and settles which of the two published target sizes is right; failure to enrol, in a trial that treats patients who feel well on the strength of a residual-disease assay, would show that the constraint on off-the-shelf products is patient and clinician acceptance rather than immunology.

Archer's first passenger flight in its Midnight aircraft

2027 · Milestone · Archer Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “Archer said in February 2025 that it was targeting a passenger flight in Abu Dhabi later that year; by October 2025 that had become 2026; in November 2026 its chief executive said he intended to be Midnight’s first passenger in 2027.” Tests a passenger date that has already slipped from 2025 to 2026 to 2027, against the brief's advice to discount the next set of launch dates.

Archer Aviation passenger service in the United States

2027 · Milestone · Archer Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “Both companies had targeted 2025 for American service and both pointed to 2027 in their third-quarter 2026 reports.” A second test of the brief's view that American eVTOL passenger dates slip, for a developer that had not flown a piloted transition as of November 2026.

ArkeaBio files its first methane vaccine for approval with New Zealand regulators

2027 · Milestone · ArkeaBio’s own target · Awaiting the date

  • Low-Methane Livestock: “It expects to apply to New Zealand regulators in 2027 and hopes for revenue in 2028.” A filing with published methane data would give the vaccine route its first independently reviewable efficacy figure and test the brief's claim that every vaccine number is the developer's own; a slip past 2027 would push the only grazing-capable product further out of the 10-year horizon.

Tenth Review Conference of the Biological Weapons Convention

2027 · Conference · On an official calendar · Awaiting the date

  • Mirror Life: “The choice will be shown to be holding if the 2027 BWC review conference and China's government adopt it, and eroding if any credible actor openly begins work toward a mirror cell while the barriers that now do most of the preventing are still falling.” This is the brief's decisive test: mirror organisms named in an agreed outcome document would show the choice holding at treaty level, while no mention would leave it resting on funders and one national policy.
  • Existential Risk Governance: “The date they share with it is the Tenth Review Conference of the Biological Weapons Convention, due no later than 2027, which Mirror Life records as a proposed venue for putting mirror biology on the treaty agenda.” The conference is where the working group's mechanisms would be adopted or dropped and where mirror biology could reach the treaty agenda, so its outcome moves the brief's assessment of whether the convention can acquire standing institutions.

BYD all-solid-state battery limited-batch production on the sulfide route

2027 · Milestone · BYD’s own target · Awaiting the date

  • Advanced Battery Technologies: “2027: Handwave CATL and BYD all-solid-state small-batch production; 2030 for scale.” A second Chinese test of the all-solid-state small-batch schedules the brief grades as handwave, independent of CATL's roadmap.

Licence application for CD19 CAR-T in myositis from single-arm registrational cohorts

2027 · Milestone · Cabaletta Bio’s own target · Awaiting the date

  • Immune Engineering: “The first approvals are sought for stiff person syndrome, with submission expected to complete in late 2026 and launch targeted for 2027, and for myositis in 2027 — rare diseases chosen because single-arm evidence is acceptable there.” A second rare-disease filing on single-arm cohorts would extend the regulatory pattern the brief flags as defensible one filing at a time and a precedent in aggregate.

NASA Carbothermal Reduction Demonstration (CaRD) oxygen extraction on the lunar surface

2027 · Milestone · NASA CaRD project’s own target · Awaiting the date

  • Lunar Industry: “Expect a surface oxygen demonstration at pilot scale — CaRD's own roadmap names 2027 — and treat that as a schedule rather than a result” A surface demonstration would give the brief's lunar oxygen pricing, now resting on vacuum-chamber yields, its first in-situ datum; no flight would add to the record of lunar oxygen pilot dates (2012, mid-2020s) that passed.

CATL all-solid-state battery small-batch production at roughly 5 GWh

2027 · Milestone · CATL’s own target · Awaiting the date

  • Advanced Battery Technologies: “CATL's reported roadmap is semi-solid mass production in 2026, all-solid-state small-batch in 2027 at roughly 5 GWh targeting readiness levels 7 to 8, and scale around 2030.” Tests whether the Chinese all-solid-state schedules the brief grades as handwave deliver even limited batches, before any claim about scale around 2030.

EU carbon border mechanism default-value markup rises to 20 per cent

2027 · Comes into force · Fixed in law · Awaiting the date

  • Global Cooperation Models: “2026 to 2028: the carbon border mechanism's escalation schedule.” A step in what the brief calls the nearest thing to a scheduled test of whether unilateral trade measures can substitute for agreement, observed through domestic carbon pricing in exporting states or a dispute.

Launch of China's Chang'e-7 lunar south-pole mission

2027 · Launch · China National Space Administration’s own target · Awaiting the date

  • Cislunar Navigation and Lunar Time: “Chang’e-7, which the relay is to serve at the south pole, was scheduled for 2026 and as of September 2026 was reported as targeting 2027.” Would put Queqiao-2 to work for the south-pole mission it is to serve, bearing on the brief's finding that China operates the only functioning dedicated lunar relay.

Chery mass production of a claimed 600 Wh/kg semi-solid cell

2027 · Milestone · Chery’s own target · Awaiting the date

  • Advanced Battery Technologies: “2027: Handwave Chery mass production of a claimed 600 Wh/kg semi-solid cell, after 2026 fleet deployment.” Would test a production schedule attached to an energy-density specification the brief regards as unsupported; production alone would not verify the specification.

China's medium-orbit quantum satellite and global quantum-communication service

2027 · Launch · China's quantum programme led by Pan Jianwei’s own target · Awaiting the date

  • Quantum Networks: “China’s programme, on an independent survey’s reading of Pan Jianwei’s announcements, targets a medium-orbit quantum satellite and a global service in 2027 and a constellation by 2030.” Bears on the brief's assessment that trusted-node QKD spans continents while repeater-based networks do not: a medium-orbit node with global service would extend the trusted-node reach without closing that gap.

Public hearing on OPG's Darlington small-reactor operating licence application

2027 · Hearing · Ontario Power Generation’s own target · Awaiting the date

  • Small Modular Reactors: “OPG applied for a twenty-year operating licence on 25 March 2026; the owner expects the public hearing in 2027 and the regulator had not scheduled it as of November 2026.” Bears on the brief's use of Darlington as the transparent Western licensing case: the hearing's timing shows whether that process keeps pace into operation.

Dow preliminary investment decision on the Long Mott Xe-100 project

2027 · Decision · Dow’s own target · Awaiting the date

  • Small Modular Reactors: “Dow expects to consider a preliminary investment decision in 2027” Would show whether a granted construction permit converts into an investment commitment, the rung the brief keeps separate from licensing.

Dutch public dialogue on extending the embryo research limit to 28 days

2027 · Milestone · Dutch cabinet’s own target · Awaiting the date

  • Embryo Models: “The 28-day recommendation awaits a public dialogue expected in 2027.” The Dutch cabinet has deferred its response to the 28-day recommendation until after this dialogue, so it bears on the brief's finding that no jurisdiction has legislated an extension of the fourteen-day limit.

UN Early Warnings for All target: early-warning protection for every person

2027 · Milestone · United Nations Early Warnings for All initiative’s own target · Awaiting the date

  • Earth-System Digital Twins: “The United Nations’ Early Warnings for All initiative targeted protection for every person by the end of 2027” Measures coverage of warning systems, the delivery precondition for the brief's unmeasured last link between forecasts and better local decisions; the brief already records the initiative looking beyond the date.

Launch of ESA's RISE geostationary life-extension mission for a Eutelsat client

2027 · Launch · ESA’s own target · Awaiting the date

  • In-Space Servicing and Depots: “ESA’s RISE life-extension mission, reported at €119 million, is due to launch in 2027 for a Eutelsat client” Bears on the brief's finding that who pays is the institutional question, since RISE pairs a reported €119 million agency budget with an unpriced commercial client, and tests the sector's record of slipped launch dates.

Form Energy's full 1.5 MW / 150 MWh Cambridge, Minnesota iron-air project online

2027 · Milestone · Form Energy’s own target · Awaiting the date

  • Energy Storage Revolutions: “Form Energy's Cambridge project was originally due in service at end-2025; the company's own site then described the full project as expected online in 2026; reporting of 6 October 2026 has it set to come online in 2027, and the offtaker's project page still said end-2025.” Would show whether the only grid-connected hundred-hour iron-air system reaches full rating after two slips, and so whether the brief's count of Western long-duration delivery moves beyond a first system.

French government authorisation decree for the Cigéo deep geological repository

2027 · Decision · Government of France’s own target · Awaiting the date

  • Nuclear Waste Solutions: “Regional reporting in September 2026 expected that in 2027, probably before the presidential election; the wire report gave no date.” Would move France from a favourable public-inquiry opinion to an authorised repository, one of the three five-year outcomes the brief names; the brief records the 2027 date as a press expectation, not a government timetable.

Federal Trade Commission report from its 2025 study of AI companion chatbots

2027 · Publication · Federal Trade Commission’s own target · Awaiting the date

  • AI Companions: “The Federal Trade Commission report was expected during 2027.” The report is the only scheduled source of audited usage and monetisation data the brief identifies, so its publication would test claims the brief now rests on lawsuits, audits and company documents.

Launch of Gateway's HALO module into near-rectilinear halo orbit

2027 · Launch · NASA’s own target · Awaiting the date

  • Deep Space Infrastructure: “Gateway's HALO module, which has arrived in the United States from Turin and had its initial power system activated, with launch no earlier than 2027 into a near-rectilinear halo orbit.” A 2027 launch would bear out the brief's ruling that Gateway is the one element with flight hardware and a stated launch year, and a slip would weaken it; the launch also sets the deadline for the ground sites meant to precede it.

Delivery of a 4 MWh sodium-ion storage product on a 785 Ah cell

2027 · Milestone · Hithium’s own target · Awaiting the date

  • Advanced Battery Technologies: “And a sodium-ion storage product announced on 16 September 2026 — 4 MWh on a 785 Ah cell, quoted at 20,000 cycles with no retention threshold or rate attached — is scheduled for delivery in 2027.” Delivery would show large-format sodium-ion storage reaching customers on a vendor's own schedule, without settling the quoted cycle life the brief notes has no retention threshold attached.

British holographic storage startup begins mass production of archival media

2027 · Milestone · unnamed British holographic storage startup’s own target · Awaiting the date

  • DNA Data Storage: “A British holographic startup was reported in March 2026 to have completed a trial deployment inside an existing tape library and to target mass production in 2027.” Mass production would put a non-molecular rival with far higher write speeds into the century-scale archive niche DNA storage is competing for, bearing on the brief's assessment of DNA storage's market.

Hypersonic test-bed programme reaching a cadence of 50 flights a year

2027 · Milestone · Test Resource Management Center (hypersonic test-bed programme)’s own target · Awaiting the date

  • Hypersonic Flight: “The test-bed programme expected to fund 50 hypersonic flights a year by 2027.” A count of flights actually flown in calendar 2027, by vehicle and operator, would show whether the brief's twenty-year flight-test cadence constraint is lifting or whether the target joins its record of slipped schedules.

Drilling of the IDDP-3 superhot well near Nesjavellir in Iceland's Hengill field

2027 to 2028 · Milestone · Reykjavik Energy’s own target · Awaiting the date

  • Magma Energy Extraction: “Reykjavik Energy, with the Clean Air Task Force and Transition Labs, has been developing a superhot well near Nesjavellir in the Hengill field at a reported $15 to $20 million, targeting the formation well NJ-11 found above 380 °C at about 2,100 m, with drilling indicated for 2027 to 2028.” A superhot well reached without magma would bear on the brief's claim that magma extraction's locational advantage shrinks if superhot conditions can be reached elsewhere.

Temporary prohibitions on cultivated meat in Indiana and Texas reach their statutory end dates, to lapse or be renewed

2027 · Comes into force · Fixed in law · Awaiting the date

  • Cellular Agriculture: “Whether the temporary bans lapse or are renewed is the cleanest available test of whether the legislative wave was a response to a product or a response to a word, because there is still almost no product.” Lapse would suggest the 2024-2025 legislative wave was a reaction to a prospect that receded, easing the market-access bottleneck; renewal or conversion to permanent bans, with still almost no product on sale, would show the bans are about the word rather than the product and harden the fragmented US market.

Intuitive Machines IM-3 lunar landing mission

2027 · Launch · Intuitive Machines’s own target · Awaiting the date

  • Lunar Industry: “The other three moved into 2027: Blue Origin’s first Blue Moon Mark 1, carrying four plume-surface imaging cameras and a retroreflector array to Shackleton Connecting Ridge; Intuitive Machines’ IM-3; and Firefly’s Blue Ghost Mission 2, which one account puts no earlier than the end of 2026 and others in 2027.” One of three 2026 landers that moved into 2027; its outcome adds a data point to the brief's reading of the commercial lunar manifest as a schedule of intentions.

Adoption of the International Seabed Authority's exploitation regulations

2027 · Vote · International Seabed Authority’s own target · Awaiting the date

  • Seabed Mineral Extraction: “Adoption of exploitation regulations has been forecast and missed before, most recently for the end of 2026; a date in the 2027 road map is a target and no more.” Adoption would end the absence of rules that the Council says should precede commercial exploitation, while a further miss would extend a record of missed deadlines the brief traces to work begun in 2014.

Regional environmental management plan for the Indian Ocean

2027 · Milestone · International Seabed Authority’s own target · Awaiting the date

  • Seabed Mineral Extraction: “Regional environmental management plans, which most delegations said should be final before any exploitation is approved, are still being prepared for the north-west Pacific and are scheduled for 2027 in the Indian Ocean.” Bears on the brief's finding that the regional plans most delegations want final before any exploitation approval remain incomplete.

Environmental threshold values recommended to the ISA Council

2027 · Decision · ISA Legal and Technical Commission’s own target · Awaiting the date

  • Seabed Mineral Extraction: “Threshold values are due to reach the Council in 2027 at the earliest.” Would give the environmental rule numbers for the first time, addressing a bottleneck the brief identifies, while the brief cautions that thresholds drawn from one trial and one plume study are first estimates.

Joby Aviation's production reaches four aircraft a month

2027 · Milestone · Joby Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “The three leading American developers, however, held between US$1.34 billion and US$2.2 billion each at the end of September 2026, were building aircraft at a rising rate — Joby had 17 in production — and were buying revenue rather than folding.” Tests the brief's reading that the survivors were building at a rising rate: Joby had 17 aircraft in production in November 2026 and targets 48 a year in 2027, before any type certificate.

Joby Aviation passenger service in the United States

2027 · Milestone · Joby Aviation’s own target · Awaiting the date

  • Advanced Air Mobility: “Both companies had targeted 2025 for American service and both pointed to 2027 in their third-quarter 2026 reports.” Tests the brief's view that the American schedule waits on agency test pilots and that dates set for 2025 and 2026 have slipped.

Commercial 1 MW ocean thermal energy conversion plant at Kumejima, Japan

2027 · Milestone · Mitsui O.S.K. Lines’s own target · Awaiting the date

  • Ocean Thermal Energy Conversion: “The 1 MW Japanese plant, “around 2027.” The operator's 2023 announcement targeted “the world's first commercialization of OTEC on a 1 MW scale around 2026.” Its own later publication says “around 2027.”” A 1 MW plant operating around 2027 would be the first commercial-scale OTEC in the brief's record; the brief classes the date as handwave because no such plant is under construction and the operator has not settled its business model.

US approval and launch of CD19 CAR-T for stiff person syndrome

2027 · Decision · Kyverna Therapeutics’s own target · Awaiting the date

  • Immune Engineering: “The first approvals are sought for stiff person syndrome, with submission expected to complete in late 2026 and launch targeted for 2027, and for myositis in 2027 — rare diseases chosen because single-arm evidence is acceptable there.” Approval would make it the first engineered-cell therapy licensed for an autoimmune disease, on single-arm evidence, the precedent the brief warns could anchor evidence standards for larger diseases.

Start of clinical trials of the LambdaVision orbit-manufactured artificial retina

2027 to 2028 · Milestone · LambdaVision (with Space Tango)’s own target · Awaiting the date

  • Space-Based Manufacturing: “LambdaVision with Space Tango has built an artificial retina from 200 alternating layers of conductive polymer and bacterial-rhodopsin assemblies, with clinical trials planned for 2027 to 2028” Trial start would give in-space manufacturing its first chance at a regulated medical outcome rather than a materials result, the standard by which the brief says this programme will be judged.

Start of LMU Munich clinical pilot of pig-heart xenotransplantation

2027 · Milestone · LMU Munich group’s own target · Awaiting the date

  • Xenotransplantation: “The LMU Munich group targeted a pig-heart pilot "from 2027."” Enrolment would extend clinical heart xenotransplantation beyond US expanded access and trials, a step the brief carries as speculative until enrolment.

LuSEE-Night calibrated low-frequency spectrum across a full lunar night on the farside

2027 · Result due · LuSEE-Night collaboration and Firefly Aerospace’s own target · Awaiting the date

  • Lunar Farside Radio Cosmology: “Expect LuSEE-Night to land and return a first farside spectrum on a schedule the collaboration has quoted as late 2025 through late 2026 and the lander vendor quotes as no earlier than 2027, with the first low-resolution sky maps below 50 MHz as the concrete product.” A calibrated spectrum at a measured systematic floor would turn the field's central assumption, that the farside is quiet enough for sky-noise-limited integration, from assertion into a number; the brief treats the floor, not a Dark Ages detection, as the decisive result.

First smartphones shipping with Metalenz's Polar ID metasurface face authentication

2027 · Milestone · Metalenz’s own target · Awaiting the date

  • Programmable Metasurfaces: “First phones carrying Polar ID were reported in May 2026 as slated for 2027; the product has been in evaluation since October 2023 and no handset maker has been named.” A named handset shipping Polar ID would move the brief's next consumer metasurface step from announced to delivered; no device in 2027 would add a further slip to a vendor date the brief already flags as interested.

Launch of NASA's first Near Space Network lunar relay satellite

2027 · Launch · NASA and Intuitive Machines’s own target · Awaiting the date

  • Cislunar Navigation and Lunar Time: “The first American relay satellite was expected in 2025 when the contract was announced, about 2026 in NASA’s February 2025 account, and 2027 as of autumn 2026.” Tests the brief's record of serial slips (2025, about 2026, now 2027) and would put in place one of the contracted assets its decisive navigation demonstration requires.

NASA decision on whether to deorbit the International Space Station in 2030

2027 · Decision · On an official calendar · Awaiting the date

  • Space Habitats: “NASA is due to decide in 2027 whether to deorbit in 2030” Would settle whether the end-of-2030 deorbit, once called the brief's most certain date, still holds, and with it how long a gap commercial stations must cover.
  • Commercial Space Stations: “The fifth is NASA’s 2027 decision on the ISS’s end, which converts every gap estimate in this brief from a forecast into an arithmetic of dates, and which GAO has asked the agency to document before it is taken.” A decision to deorbit on schedule with no station certified for NASA crews turns the brief's possible gap into a dated interval; an extension moves the overlap but depends on Russian participation beyond its stated 2028 commitment and on money the agency's slides already show as short.

Start of operations at Niron Magnetics' 1,500-tonne-a-year iron-nitride magnet plant in Minnesota

2027 · Milestone · Niron Magnetics’s own target · Awaiting the date

  • Critical Mineral Midstream: “Niron Magnetics has a conditional commitment, announced on 7 August 2026, for a loan of up to US$150 million from the Office of Strategic Capital toward a 1,500-tonne-a-year iron-nitride plant in Minnesota scheduled to operate from 2027, and has begun site selection for a 10,000-tonne plant.” Bears on the misconception that a rare-earth-free magnet is about to make the midstream moot; operation with a published energy product and coercivity would test the brief's reading that substitution is slow, partial and a hedge rather than a rescue.

NIST's next post-quantum cryptography standardisation conference

2027 · Conference · On an official calendar · Awaiting the date

  • Post-Quantum Migration: “On 14 May 2026 NIST advanced nine to a third round — FAEST, HAWK, MAYO, MQOM, QR-UOV, SDitH, SNOVA, SQIsign and UOV — said that round would last about two years, and planned its next standardisation conference for 2027.” Would report on the nine third-round signature candidates, bearing on the brief's account of hedges against a break in the module-lattice assumptions.

Publication of NOAA Atlas 15 volume 1 for the contiguous United States

2027 · Publication · NOAA National Weather Service’s own target · Awaiting the date

  • Design Codes Under Nonstationarity: “Atlas 15 volume 1 publishes and supersedes Atlas 14, on the current schedule in 2027 for the contiguous states and 2028 for the rest.” The moment the brief identifies as decisive: manuals that cite the source generically would switch to nonstationary design values without a vote, testing its finding that adoption is bibliographic rather than deliberative.

NVIDIA Kyber rack and row-level 800-volt power centres reach production

2027 · Milestone · NVIDIA’s own target · Awaiting the date

  • The Physical Stack of AI: “NVIDIA’s first 800-volt power racks are due in the second half of 2026, the Kyber rack and row-level power centres in 2027, solid-state transformers in 2028.” Tests whether the shift to 800-volt direct current, which the brief says adds a retraining requirement for scarce electrical trades, arrives in the rack-and-power layer on the vendor's stated timetable.

Ofgem opening a second long-duration storage cap-and-floor application window

2027 · Milestone · Ofgem’s own target · Awaiting the date

  • Energy Storage Revolutions: “Also falling in this window on stated schedules: the full Cambridge iron-air project in 2027, the British regulator's delayed final awards and its aim of opening a second application window in 2027” Would show whether the British cap-and-floor scheme becomes a repeated procurement rather than a single round, bearing on the brief's view that procurement decisions, not technology readiness, set long-duration timing.

First deliveries from the largest contracted olivine rock-weathering programme

2027 · Milestone · Supplier on Frontier's 78,709-tonne olivine offtake (originally Eion)’s own target · Awaiting the date

  • Enhanced Rock Weathering: “Nothing comparable exists for olivine at commercial doses over a decade, and the largest contracted olivine programme is due to deliver from 2027.” Deliveries would begin olivine application at commercial doses, the setting for which the brief finds no cumulative trace-metal budget comparable to the Illinois basalt trial.

Qualification of optical input-output on the accelerator package

2027 · Milestone · Optical input-output vendors (venture-backed firms and one acquirer)’s own target · Awaiting the date

  • Integrated Photonics: “Optical input-output on the accelerator package: vendor targets of qualification by the end of 2027 and volume in 2028 are, on this field’s record, more likely to slip than not.” Tests the brief's assessment that co-packaged optics arrive about as late as sceptics said and as real as advocates said, applied to the package-level step beyond switches.

Initial clinical data from Prime Medicine's in-body prime editing trial of PM577a in H1069Q Wilson disease

2027 · Result due · Prime Medicine’s own target · Awaiting the date

  • Gene Writing: “The condition on the whole case is one sentence: a donor molecule of ten kilobases has to reach the inside of a target cell in a living person at a dose the person tolerates, and nothing in the published record does that yet.” The nearest live test of whether a lipid nanoparticle can deliver writing machinery to hepatocytes in people at a tolerated dose; a clear pharmacodynamic effect strengthens the in-body route this brief doubts, and a null leaves ex vivo manufacture as the only plausible path for insertion products.

Initial clinical data from Prime Medicine's PM647 in alpha-1 antitrypsin deficiency, after FDA clearance of the application in September 2026

2027 · Result due · Prime Medicine’s own target · Awaiting the date

  • Gene Writing: “Its 2026 disclosures put initial clinical data for PM577a in Wilson disease and PM647 in alpha-1 antitrypsin deficiency in 2027, a biologics licence application for PM359 in the first half of 2027, cash of $74.8 million at 30 September 2026 against $191.4 million nine months earlier, a November 2026 raise of about $134.7 million net and a runway stated as through 2027” A second liver readout from the same platform owner distinguishes a programme-specific result from a platform property; two positives would make the capital-fragility argument in this brief weaker, and two nulls would make the insertion programmes behind them unfundable.

The end of Prime Medicine's stated cash runway, which covers the owner of the PASSIGE insertion platform

2027 · Milestone · Prime Medicine’s own target · Awaiting the date

  • Gene Writing: “The company whose whole thesis was targeted insertion shed nearly its entire staff within six months of publishing its best integration data.” If the one remaining platform owner is funded beyond this horizon, the capability survives the attrition that took Tome Biosciences; if it is not, targeted insertion returns to being academic work with no route to a first-in-human study.

Launch of QEYSSat, Canada's uplink quantum key distribution microsatellite

2027 · Launch · Canadian Space Agency’s own target · Awaiting the date

  • Quantum Networks: “QEYSSat is to launch no earlier than 2027 for a one-year mission.” Would add a Canadian uplink QKD demonstration to the brief's record of satellite trusted-node links, the route by which QKD spans distances fibre cannot without the repeater nobody has fielded.

First flight of SpaceX's Starmind orbital compute satellites

2027 · Launch · SpaceX’s own target · Awaiting the date

  • Orbital Data Centres: “three organisations have computing hardware in orbit and a fourth says it will fly in 2027” These are the first flights that could supply the decisive measurement of kilograms per kilowatt on a 100 kW-class satellite, between the applicant's implied 10 to 14 and the independent 34 to 59, though the brief notes publication is not assured.

First plasma in Commonwealth Fusion Systems' SPARC tokamak

2027 · Milestone · Commonwealth Fusion Systems’s own target · Awaiting the date

  • Commercial Fusion: “This brief's September 2026 edition, following a March trade report, gave first plasma as later in 2026; as of November 2026 none had been reported, reporting from January and August 2026 placed it in 2027, and the company declined to update its public schedule in July.” First plasma is the precondition for SPARC reaching Q above one in D-T, the first half of what the brief says would settle the private-tokamak path, and its timing tests a date the brief has already carried and withdrawn once.
  • High Temperature Superconductors: “First plasma targeted for 2027 after two slips, as of November 2026, with net energy to follow.” Bears on the brief's reading of SPARC as the largest full-scale test of whether kilometre-class REBCO can be wound, joined, cooled, protected and operated at manufacturing volume, and on its record of two slips already.

Launch of Starcloud-2, two compute satellites of about 8 kW each

2027 · Launch · Starcloud’s own target · Awaiting the date

  • Orbital Data Centres: “Starcloud-2 was targeted for October 2026 and, as of November 2026, is expected in 2027.” At about 8 kW per satellite it would be the first flight between a single 700 W processor and a 100 kW node, and any published mass and radiator figures would bear on the brief's kilograms-per-kilowatt dispute.

Return of Tianwen-2's sample capsule from quasi-satellite 469219 Kamoaalewa

2027 · Milestone · On an official calendar · Awaiting the date

  • Asteroid Mining: “Earth return is scheduled for 2027 , with an extended mission to the main-belt comet 311P/PanSTARRS arriving January 2035 .” The brief's next hard measurement: a capsule on the ground would confirm anchor-and-attach and touch-and-go sampling at a new class of target, a capability result rather than an economic one, and until then the agency's success claims are carried as interested.

Toyota commercialisation of its compact all-solid-state battery, in limited batches

2027 to 2028 · Milestone · Toyota’s own target · Awaiting the date

  • Advanced Battery Technologies: “Toyota's own annual report for the year ended 31 March 2026, filed 10 June 2026, puts commercialisation of its compact all-solid-state battery “between 2027 and 2028” and says the technology is “finally approaching the phase of practical application”” The brief's decisive solid-state experiment: whether Toyota ships in the window tests the date, and the volume shipped tests its reading that the scope shrank to limited batches.

TRAILBLAZER-ALZ 3 readout: donanemab in cognitively unimpaired people with high plasma p-tau217

2027 · Result due · Eli Lilly’s own target · Awaiting the date

  • Neurodegeneration Reversal: “The donanemab and lecanemab prevention readouts, expected from 2027 to 2028, are the field’s pivot” The brief's other decisive prevention trial: its event-driven result on time to clinical progression after amyloid removal tests the assessment that the hypothesis now turns on timing rather than mechanism.

UK-EU sanitary and phytosanitary agreement takes effect, which the FSA has reportedly warned could void UK novel-food authorisations

2027 · Comes into force · On an official calendar · Awaiting the date

  • Cellular Agriculture: “The UK–EU sanitary and phytosanitary agreement is set to take effect in mid-2027.” If UK authorisations survive, the UK stays the most structured European route to a human-food approval; if they are voided or folded into the EU process, Europe's only active pathway merges into one that has approved no cell-cultured food, and the brief's European regulatory geography changes.

UK revision of scientific advisers' terms of appointment, including institutional compensation

2027 · Milestone · UK Government’s own target · Awaiting the date

  • Scientific Advisory Institutions: “advisers' terms of appointment revised by 2027.” Revised terms with compensation for advisers' home institutions would test whether the accepted recommendations widen who can serve on emergency advisory groups, the diversity question the brief says is checkable in 2027 and 2028.

Urenco's Eunice enrichment plant adding 700,000 SWU a year of capacity

2027 · Milestone · Urenco’s own target · Awaiting the date

  • Small Modular Reactors: “Urenco's Eunice plant runs 4.3 million SWU a year, expanding by 700,000 by 2027” Bears on the brief's enrichment-base argument that near-term domestic capacity is small against American demand and foreign-origin supply.

Inflation adjustment of the US 45Q carbon-capture tax credit begins

2027 · Comes into force · Fixed in law · Awaiting the date

  • Carbon Removal Verification: “45Q inflation adjustment begins in 2027” Changes the value of the statutory credit beneath US capture-and-storage removals, bearing on the brief's account of policy support running ahead of verification.

World Radiocommunication Conference 2027 (WRC-27)

2027 · Conference · On an official calendar · Awaiting the date

  • Cislunar Navigation and Lunar Time: “As of February 2026 the 2483.5–2500 MHz band assumed by the specification and by the space agencies’ own frequency-coordination group had, in the words of a provider preparing to file, “no status in the ITU radio regulations” for lunar use, with inclusion expected at the 2027 World Radiocommunication Conference.” Decides whether the 2483.5-2500 MHz band the LunaNet specification assumes gains status in the ITU Radio Regulations for lunar use, a bottleneck the brief records along with coexistence with the far-side radio-astronomy shielded zone.
  • Next-Generation Networks: “The consequence is structural: the band plan will be decided by a treaty conference in 2027, before the radio specification is written, and the incumbents there — fixed satellite services, radio astronomy, government and military users — are the parties whose displacement sets the timetable.” The conference's decision on 7.125–8.4 GHz and 14.8–15.35 GHz settles whether the spectrum the brief's 6G case rests on is identified for mobile, and it closes the window in which the brief's decisive uplink measurement is most useful.

Zhejiang Lab on-orbit computing constellation reaching about one hundred satellites

2027 · Milestone · Zhejiang Lab and its commercial partner’s own target · Awaiting the date

  • Orbital Data Centres: “The Chinese constellation targeted more than fifty satellites in 2025 and had fourteen in November 2026; its target of about one hundred in 2027 should be read accordingly.” The constellation is the brief's evidence that the credible near-term regime is edge processing rather than a data centre; its deployment pace against a target already missed once tests how fast that niche is scaling.

Availability of Vertex's zimislecel stem-cell-derived islet therapy

2027 · Milestone · Vertex Pharmaceuticals’s own target · Awaiting the date

  • Lab-Grown Organs: “the sponsor brought its planned regulatory submission forward from 2030 to 2026 and projected availability no earlier than 2027” Availability would move what the brief calls the clearest demonstration that manufactured cells can replace organ function from an investigational result under chronic immunosuppression to a licensed therapy.

January to March 2028

California's capture-device provenance duties take effect

1 January 2028 · Comes into force · Fixed in law · Awaiting the date

  • Content Authenticity Infrastructure: “California’s capture-device duties from 1 January 2028” Would put capture-device duties into force, bearing on the brief's finding that no shipping phone runs a secure capture-to-signature pipeline; the brief records the date as an intention.

Close of British Columbia's first electricity allocation window for AI and data centres

1 February 2028 · Comes into force · Fixed in law · Awaiting the date

  • AI Electricity Demand: “British Columbia’s first allocation window closes on 1 February 2028.” Uptake against the 300 MW AI and 100 MW conventional caps, with curtailment commitments, would be the first data from the statutory rationing regime the brief sets against open-access queues.

Earliest entry into force of the IMO Net-Zero Framework

1 March 2028 · Comes into force · Fixed in law · Awaiting the date

  • Inadvertent Geoengineering: “At an extraordinary session of the Marine Environment Protection Committee in October 2025, adoption of the IMO Net-Zero Framework was deferred: “A majority of 57 member states voted to adjourn the meeting for one year, while 49 voted to continue”, with the meeting resuming in October 2026 and entry into force on 1 March 2028 at the earliest.” Entry into force would fix the fuel transition the brief expects to deliver a second aerosol perturbation over the same shipping lanes, while its absence would bear out the brief's reading that the 2025 deliberations gave no sign of adoption.

OpenAI's stated target of an automated AI researcher

March 2028 · Milestone · OpenAI’s own target · Awaiting the date

  • Artificial Scientists: “Scheduled, not achieved: OpenAI’s “automated AI researcher” by March 2028, a target set and to be scored by the same party.” Bears on the brief's line between scheduled and achieved autonomous research; because the target is set and scored by the same party, a claim of success would move the brief only with an external evaluation behind it.

OCEAN(a)-Outcomes, the olpasiran lipoprotein(a) outcome trial: estimated primary completion

31 March 2028 · Result due · Amgen (olpasiran sponsor)’s own target · Awaiting the date

  • RNA Medicines: “the lipoprotein(a) outcome trials completing on 31 March 2028 and in March 2029.” Its readout would test the threshold hypothesis the brief labels untested, that deeper lipoprotein(a) suppression by small interfering RNA prevents events where pelacarsen did not, and so whether the target is retired or revived.

April to June 2028

PIXEurope pilot line reaches full capacity with multi-project wafer runs

May 2028 · Milestone · PIXEurope (EU photonic pilot line)’s own target · Awaiting the date

  • Integrated Photonics: “Its stated schedule as of June 2026: access to existing partner infrastructure from November 2026, new infrastructure from May 2027, and full capacity including multi-project wafer runs by May 2028.” Measures the same public-versus-private lag at full capacity: multi-project wafer runs are the access route the brief identifies for start-ups and national programmes outbid for prepaid foundry capacity.

The Swiss National Bank's wholesale CBDC pilot on SIX Digital Exchange reaches its stated end date

June 2028 · Milestone · Swiss National Bank’s own target · Awaiting the date

  • Tokenized Settlement: “The sources disagree on how long the Swiss pilot runs: a vendor explainer reports a June 2025 extension “to at least mid-2027,” and AFME's October 2026 report says it “will continue until June 2028.”” A decision to make the arrangement permanent would move native tokenised central-bank money from pilot to production and weaken the claim that the endorsed settlement assets barely exist outside pilots; another extension or a wind-down would confirm it. The earlier mid-2027 date reported by a vendor would be checked against whatever the SNB announces.

SONOBIRD phase 3 (implanted SonoCloud-9 with carboplatin against temozolomide or lomustine in recurrent glioblastoma) reaches its estimated study completion

June 2028 · Milestone · Carthera’s own target · Awaiting the date

  • Focused Ultrasound in the Brain: “SONOBIRD, a phase 3 trial sponsored by the device maker, randomises patients with recurrent IDH-negative glioblastoma between the implanted device with carboplatin and standard temozolomide or lomustine, with a planned 560 participants; it started in January 2024 and its estimated study completion is June 2028.” A survival benefit would move ultrasound-mediated delivery from frontier to established for one indication and make barrier opening the platform's second proven mode; a null would say the 5.9-fold concentration gain does not become clinical benefit with this drug, leaving the general-route thesis resting on ablation alone. A further slip of the completion date would itself change the brief's timelines entry.

The first half of 2028, no closer date given

Primary event-free survival analysis of the randomised first-line consolidation trial of an off-the-shelf CD19 CAR-T, anticipated mid-2028

the first half of 2028 · Result due · Allogene Therapeutics’s own target · Awaiting the date

  • Universal-Donor Cells: “That is the only randomised comparison in the field, and it answers whether an off-the-shelf product delivers clinical benefit rather than a biomarker shift.” This is the result that would license the first off-the-shelf engineered cell product, or not: a positive primary analysis would make inventory-and-redose the proven model for effector cells and leave immune cloaking needed only for persistent grafts, while a negative one would return the field to autologous products and make the cloaking programme the only route left to an off-the-shelf effector cell.

Artemis IV, the first crewed lunar landing of the programme

the first half of 2028 · Launch · NASA’s own target · Awaiting the date

  • Deep Space Infrastructure: “The follow-on is scheduled, and it moved: after the February 2026 restructure the two-crewed-vehicle cislunar flight is Artemis IV, targeted for 2028, with Artemis III a crewed Earth-orbit docking test in mid-2027.” This is the scheduled follow-on to the brief's decisive experiment: two crewed vehicles on the Deep Space Network at once would show whether the contention Artemis I exposed recurs at crewed load, which is the brief's central capacity claim.
  • Mars Colonization: “the landing became Artemis IV, targeted for early 2028 with the lander not yet selected” A crewed landing would mark the start of the surface presence that lunar resource demand assumes and test the Mars brief's slip record against an agency date; a further move would extend that record.
  • Cislunar Navigation and Lunar Time: “the mission once planned as the first landing was re-planned as an Earth-orbit test, with landings reported for 2028 and after.” Crewed landings anchor the agency demand on which, in the brief's assessment, a one-customer-deep lunar navigation market rests, so the landing's timing moves the brief's view of when that demand becomes real.

Also named in: Lunar Industry

Launch of the first Axiom Space commercial station element

the first half of 2028 · Launch · Axiom Space’s own target · Awaiting the date

  • Space Habitats: “Axiom's first element, no earlier than 2027 in the September text, is listed for early 2028” Would show whether the second commercial first-element date holds after a year's slip, bearing on the brief's assessment of how wide the gap after the ISS will be.

Launch of ESA's Skimsat very-low-orbit demonstrator, Redwire prime

the first half of 2028 · Launch · ESA and Redwire’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “Skimsat was targeted for early 2028 in mid-2024 and has not been re-dated.” Tests the brief's flag that the early-2028 date has not been restated since the prime contractor changed, and its reading that the civil European line runs through technology budgets rather than a mission programme.

First power from Fervo Cape Station Phase II, contracted to Google

the first half of 2028 · Milestone · Fervo Energy’s own target · Awaiting the date

  • Geothermal Megaprojects: “Eight 50-MW GeoBlocks, as of November 2026 contracted to Google under a 396 MW agreement, are guided for first power in mid-2028 and full capacity by the end of 2028, at a target capital cost of $5,500/kW and with drilling about 18% complete.” First power would test whether the developer's claimed learning curve carries to 50 MW units at the $5,500/kW target, against the roughly $7,000/kW the brief records as expected for Phase I.

GE Vernova gas-turbine production capacity reaches 24 GW a year

the first half of 2028 · Milestone · GE Vernova’s own target · Awaiting the date

  • The Physical Stack of AI: “GE Vernova’s turbine capacity is planned at 24 GW a year by mid-2028.” Bears on the brief's arithmetic that a 122 GW backlog is about five years of output: capacity reached or missed changes how long the turbine queue it records takes to clear.

Start of PorMedTec pig-organ xenotransplant trials in Japan

the first half of 2028 · Milestone · PorMedTec’s own target · Awaiting the date

  • Xenotransplantation: “PorMedTec targeted Japanese trials from early 2028 and an approval application in 2029” Trial start would add a third national regulator to clinical xenotransplantation, using pigs cloned from US-supplied edited cells, which the brief records as a plan.

Initial operating capability of the UK's nationally owned eLoran system

the first half of 2028 · Milestone · UK Department for Science, Innovation and Technology’s own target · Awaiting the date

  • Sovereign Timing Infrastructure: “Britain is procuring a national system with initial capability targeted for early 2028 and full capability from 2029, which is a schedule, not a deployment.” Initial capability on schedule would be the brief's first case of a sovereign terrestrial timing backup moving from procurement to service, a decade after the UK, France and Norway abandoned the technology; a slip would bear on its claim that eLoran's constraint is political durability.

July to September 2028

Maunakea Stewardship and Oversight Authority takes full control of the mountain

July 2028 · Comes into force · Fixed in law · Awaiting the date

  • Mega-Telescopes: “A state-appointed authority began a five-year transition in July 2023, including Native Hawaiian community representatives and cultural practitioners, with full control transferring in July 2028” The transfer fixes when the authority whose community representative describes a pathway forward controls the site, and so moves the brief's ruling that the Thirty Meter Telescope is unfunded rather than dead.

First R3PEATS Replication Center replications begin, in Year 2 of the revised concept (fiscal 2028)

the third quarter of 2028 · Milestone · US Department of Health and Human Services and National Institutes of Health’s own target · Awaiting the date

  • Research Integrity Infrastructure: “The revised concept plans replications in Year 1 and conducts them “starting in Year 2”, so no R3PEATS replication is scheduled to begin before fiscal 2028, and every lead institute is still listed as to be determined.” Replications under way by the end of fiscal 2028 would end the brief's statement that no R3PEATS replication has begun and open the question of how targets were chosen, which the brief's experiments section says decides what any reported replication rate means; a slip would extend the period in which replication has a concept and a budget table but no work.

US prohibition on digital asset service providers offering non-permitted payment stablecoins begins

18 July 2028 · Comes into force · Fixed in law · Awaiting the date

  • Tokenized Settlement: “That last date is when US law begins to divide the dollar-token market into permitted and non-permitted instruments, which will either consolidate dollar settlement on licensed tokens or push the rest offshore.” If dollar-token settlement consolidates on licensed tokens, fragmentation of the dollar-token layer falls and the singleness concern narrows to licensed issuers; if non-permitted tokens keep their volume offshore, the brief's fragmentation and monetary-sovereignty paragraphs strengthen and the dollar-token market splits along a legal line.

EU AI Act high-risk requirements apply to Annex I products

2 August 2028 · Comes into force · Fixed in law · Awaiting the date

  • AI Governance: “the high-risk requirements from 2 December 2027 for Annex III systems and 2 August 2028 for Annex I products.” Application on the date would complete the high-risk tier twelve months later than enacted on the brief's arithmetic; a further move would extend the slipped schedule the brief records.
  • Clinical AI Validation: “The EU AI Act's high-risk requirements are due to apply to Annex I products, which include AI medical devices, on 2 August 2028, unless the proposed device-regulation amendment moves the device regulations to Section B of Annex I first” Application on the date with the device regulations still in Section A would bring the first logging and post-market monitoring obligations for AI medical devices into force and retire the brief's statement that no regime in force requires a version-to-patient record; a prior move to Section B would leave those requirements to acts under the device regulations and keep that statement standing; a further deferral extends the gap the brief describes.

Deadline for an Army-regulated microreactor to be operating at a domestic military installation under the Janus programme

30 September 2028 · Milestone · Fixed in law · Awaiting the date

  • Microreactors and Process Heat: “The first candidates are the Army’s Janus units, due in useful service by 30 September 2028, and Radiant’s first Air Force unit, planned for 2028 under the civil regulator.” Met, with the staffing and availability published: the brief's decisive result arrives and the remote-grid and mining cases move from conditional to live or collapse to the military buyer depending on the crew size; missed: the defence case joins the slip record and the 2028 row in the timelines moves.

October to December 2028

OpenAI's further Stargate data-centre sites due in late 2028

the fourth quarter of 2028 · Milestone · OpenAI and its Stargate partners’s own target · Awaiting the date

  • Compute Concentration: “Abilene was due for completion in the fourth quarter of 2026; five further Stargate sites are projected for the fourth quarter of 2028” Each site energised or not on its date is a pass or a miss on the brief's announcement-to-capacity test, against more than 9 GW projected and none operating at the other sites in April 2026.
  • The Physical Stack of AI: “The announced 2028 cohort — five Stargate-class sites carrying roughly 8 GW of stated capacity against fourth-quarter-2028 targets, the Crane nuclear restart, and the giant load queues behind them — will either reach powered operation on schedule or slip, and the pattern of the slips will localise the binding layer of the stack in a way no forecast can.” This is the brief's decisive test: arrival on schedule on on-site gas would weaken the stack thesis into a procurement story, while the pattern of any slips would locate the binding layer.
  • Digital Chokepoints: “as of April 2026, a single programme’s seven planned United States sites totalled more than 9 GW, with one site operating at about 0.3 GW and most of the rest projected for late 2028.” Would test the brief's load-bearing claim that compute is concentrating into a few very large sites on multi-year build times, and the build-time premise behind its point that a displaced region cannot be rebuilt within an outage.

3GPP Release 21 (first 6G release) stage-3 specification freeze

December 2028 · Milestone · On an official calendar · Awaiting the date

  • Programmable Metasurfaces: “3GPP’s Release 21 timeline, approved in June 2026, puts the 6G stage-3 freeze in December 2028 and the ASN.1 freeze in March 2029.” The frozen Release 21 content settles whether reconfigurable surfaces have entered a 6G work item, which moves the brief's claim that the specified network reality is the repeater rather than the surface.
  • Next-Generation Networks: “3GPP opened 6G study items in Release 20 in 2025, with normative work expected in Release 21 and a first freeze in the 2028–2029 window on the schedules circulating in 2026.” A freeze in this window would confirm the brief's structural point that the band plan is set by treaty before the radio specification is written, and would fix when 6G equipment can be built to a standard.

Form Energy shipping first modules for the 300 MW Pine Island project

December 2028 · Milestone · Form Energy’s own target · Awaiting the date

  • Energy Storage Revolutions: “Form Energy's chief executive said in March 2026 that he expected to ship first modules for the 300 MW / 30 GWh Google and Xcel project at Pine Island, Minnesota by the end of 2028” Bears on the brief's 2028–2031 horizon as the first point at which a Western long-duration electricity asset could plausibly matter at grid scale.

The second half of 2028, no closer date given

First operation of an EU AI gigafactory under the eighteen-month rule

the second half of 2028 · Milestone · Fixed in law · Awaiting the date

  • Compute Concentration: “European gigafactory awards are expected around the start of 2027 and operation within eighteen months of signature, which puts first operation in the second half of 2028 at the earliest.” Operation within eighteen months of signature would be a pass on the brief's announcement-to-capacity test for public compute; a miss would join the slips the brief already records.

Fervo Cape Station Phase II reaches full capacity of eight 50 MW units

the second half of 2028 · Milestone · Fervo Energy’s own target · Awaiting the date

  • Geothermal Megaprojects: “Eight 50-MW GeoBlocks, as of November 2026 contracted to Google under a 396 MW agreement, are guided for first power in mid-2028 and full capacity by the end of 2028” Full capacity on time would convert the largest binding EGS contract in the brief into operating megawatts, narrowing the contracted-against-operating gap the brief uses as its measure, though the net output reported would matter more than the date.

First electricity from Mazama Energy's superhot-rock geothermal project at Newberry Volcano, Oregon

the second half of 2028 to 2029 · Milestone · Mazama Energy’s own target · Awaiting the date

  • Magma Energy Extraction: “It projects roughly 15 to 20 MW net from the pilot pair, about 200 MW at first scale and over 5 GW at full site, with plant construction possibly from 2027 and first electricity late in 2028 or 2029 (developer’s own figures) .” Bears on the brief's judgment that superhot-rock EGS, which skips the melt, is the better bet on present evidence than magma extraction.

2028, no closer date given

Aarhus University reports its controlled animal-welfare studies of Bovaer feeding on dairy cows

2028 · Result due · On an official calendar · Awaiting the date

  • Low-Methane Livestock: “Controlled research is under way, with Aarhus welfare studies running to 2028.” A controlled null would close the Danish question in the inhibitor's favour and upgrade the brief's persistence and safety assessment; an identified dietary interaction (silage, sulphur, fat) would turn the inhibitor into a product with a diet specification, as the experiments section anticipates; a direct welfare effect would undercut the brief's upside for confined dairy.

AHEAD 3-45 readout: lecanemab in people with amyloid but no symptoms

2028 · Result due · Eisai’s own target · Awaiting the date

  • Neurodegeneration Reversal: “AHEAD 3-45 tests lecanemab over four years in two strata — about 200 per arm at intermediate amyloid levels of 20 to 40 centiloids and about 500 per arm above 40 — with a cognitive composite, PACC-5, as the primary outcome of the larger stratum, and is expected to read out in 2028.” Bears directly on the brief's pivot: whether removing amyloid before symptoms delays clinical decline is the timing question on which the remaining amyloid hypothesis now rests, and a result moves it in either direction.

ArkeaBio's first methane vaccine reaches commercial sale (company target for first revenue)

2028 · Launch · ArkeaBio’s own target · Awaiting the date

  • Low-Methane Livestock: “The leading developer hopes for revenue in 2028, from a first product targeting 10 to 15 per cent for three months, and it cut a third of its staff in 2026 to get there.” Commercial sale at 10 to 15 per cent for three months would make a vaccine the first licensed route that can reach a grazing animal and would move the timeline's 10-year line from expectation to record; a miss would strengthen the brief's view that grazing cattle remain effectively unreached.

Artemis V crewed lunar mission

2028 · Launch · NASA’s own target · Awaiting the date

  • Lunar Industry: “Artemis V is tentatively later in 2028.” A second crewed mission in the same year would indicate the surface cadence that lunar resource demand assumes; the brief records the date as tentative, so it bears on that assumption only weakly.

Bellatrix and TelePIX first air-breathing propulsion flight

2028 · Launch · Bellatrix and TelePIX’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “Kreios, NewOrbit and Bellatrix with TelePIX each target 2028 for a first air-breathing flight” Bears on the brief's reading, on the field's record, that one or two air-breathing engines will have fired in orbit by 2030, and on its note that no announced flight has a published launch contract.

British Academy partial-randomisation trial: examination of award outcomes in the 2025–2028 extension

2028 · Result due · The British Academy’s own target · Awaiting the date

  • Scientific Funding Models: “The British randomisation trial states it will examine award outcomes during 2025–2028, which is the nearest thing to a scheduled outcome comparison anywhere in the record.” A published comparison of lottery- against panel-allocated awards would be the first outcome comparison the brief says no funder has produced, and would bear on whether randomisation above a quality threshold costs anything in results.

EU carbon border mechanism default-value markup rises to 30 per cent

2028 · Comes into force · Fixed in law · Awaiting the date

  • Global Cooperation Models: “2026 to 2028: the carbon border mechanism's escalation schedule.” The final step in what the brief calls the nearest thing to a scheduled test of whether unilateral trade measures can substitute for agreement, observed through domestic carbon pricing in exporting states or a dispute.

CERN's Antimatter Factory (Antiproton Decelerator and ELENA) returns to operation after Long Shutdown 3, as part of the staged restart of the injector complex

2028 · Milestone · On an official calendar · Awaiting the date

  • Tabletop Tests of Gravity: “CERN's Antimatter Factory began its final six months of physics before Long Shutdown 3 on 27 February 2026 and fell silent with the rest of the injector complex on the morning of 31 August; CERN says the complex will return to operation in stages from 2028 onwards.” Beam back in 2028 reopens the only route to the 1 per cent antihydrogen free-fall measurement the brief ranks second among its experiments and places in its 10-year horizon; a slip past 2028 keeps the antimatter bound at about 20 per cent for longer and moves that horizon and the brief's beam-time bottleneck later.

Chandrayaan-4 flight of ISRO and DAE artificial heating to extend lander life

2028 · Launch · Indian Space Research Organisation and Department of Atomic Energy’s own target · Awaiting the date

  • Lunar Energy Infrastructure: “The Indian Space Research Organisation and the Department of Atomic Energy are jointly developing artificial heating intended to extend lander life from about fourteen days to 100 to 200 days , targeting Chandrayaan-4 at around 2028 on a budget above ₹2,100 crore.” Would add a deliberately heated lander to the brief's lunar-night survival record, testing its base rate that every vehicle to survive a night carried isotopes or survived by accident.

Cosmic Explorer short list of detector sites

2028 · Decision · Cosmic Explorer project’s own target · Awaiting the date

  • Multi-Messenger Astronomy: “Cosmic Explorer’s short list of sites is due in 2028.” Bears on the brief's reading that the American next-generation detector is a set of research grants with a site search attached and no construction budget.

Readout of lecanemab plus E2814 in autosomal-dominant Alzheimer's mutation carriers

2028 · Result due · Dominantly Inherited Alzheimer Network Trials Unit (DIAN-TU)’s own target · Awaiting the date

  • Neurodegeneration Reversal: “In families carrying autosomal-dominant mutations, a study combining lecanemab with a second antibody, E2814, is expected to read out in 2028” Adds the familial-mutation arm of the brief's decisive prevention test, where onset is genetically predictable, to the evidence on whether early anti-amyloid treatment, here combined with a tau antibody, alters the disease course.

UN-agency-backed digital public infrastructure campaign target of 50 countries

2028 · Milestone · The UN-agency-backed campaign’s own target · Awaiting the date

  • Civic Technology: “More than 50 countries requested multilateral technical support for such systems following India's promotion of the model at the G20, and a campaign backed by a United Nations agency targets 50 countries by 2028” Meeting the count would measure adoption of the digital-public-infrastructure framing rather than outcomes, the distinction on which the brief's assessment of civic technology turns.

Next release of the SCREAM-based US Earth-system model (E3SM)

2028 · Milestone · E3SM project developers’s own target · Awaiting the date

  • Earth-System Digital Twins: “The next release of the SCREAM-based US model is described by its developers as due in 2028.” Tests whether the US kilometre-scale strand of the brief's satellite-to-simulation chain moves from a completed research run to a released model on its developers' schedule, amid the funding disruption the brief records.

EU Union registry for certified carbon removals under the certification framework

2028 · Comes into force · Fixed in law · Awaiting the date

  • Carbon Removal Verification: “On 3 February 2026 the Commission adopted methodologies for direct air capture, biogenic capture and biochar, and projects could begin applying; certification is done by schemes the Commission recognises, the certificates are voluntary, and the Union registry is due by 2028.” A Union registry would make EU-certified removals traceable in one public place, bearing on the brief's question of whether certification can be audited apart from the schemes that issue it.

The Eurosystem's Appia programme delivers its blueprint for an integrated European tokenised financial ecosystem

2028 · Publication · European Central Bank (Eurosystem)’s own target · Awaiting the date

  • Tokenized Settlement: “A longer programme, Appia, published a roadmap in March 2026 aimed at a blueprint for an integrated European tokenised financial ecosystem in 2028, without yet deciding whether that ecosystem uses one shared ledger or several interconnected ones.” A blueprint choosing one shared ledger with tokenised reserves would answer the one-ledger-or-many question in favour of atomic reach and concentrated operational risk; one choosing interconnected ledgers or continued synchronisation would confirm that the interoperability and legal-finality bottlenecks remain the binding constraints, and that netting survives behind a tokenised front end.

Eve's eVTOL type certification

2028 · Decision · Eve Air Mobility’s own target · Awaiting the date

  • Advanced Air Mobility: “Beta received a market survey certificate for its Alia 250 in October 2026, and Eve targets type certification in 2028.” Tests the brief's finding that passenger eVTOL certification dates slip, for a developer whose target still stands at 2028.

Helion's Orion plant delivering power under its 50 MW Microsoft contract

2028 · Milestone · Helion Energy’s own target · Awaiting the date

  • Commercial Fusion: “Established Helion reported 150 million °C on its Polaris prototype in February 2026 and, as of 1 October 2026, still targeted 2028 for a 50 MW Microsoft contract from its Orion plant in Washington State.” Tests the brief's treatment of a 2028 grid date from a company with no peer-reviewed net-energy result as a commercial commitment rather than evidence about physics or schedule.

Launch of India's Venus Orbiter Mission

2028 · Launch · ISRO’s own target · Awaiting the date

  • Venus Cloud Habitability: “India’s Venus Orbiter Mission is costed at about $147 million, or 12.36 billion rupees, with 16 payloads and a launch no earlier than 2028, having already slipped from 2023.” Bears on the brief's point that Venus data this decade does not depend on a single agency, while as an orbiter it measures remotely and cannot settle the in-situ habitability question.

Kairos Power's Hermes 1 non-power test reactor coming online

2028 · Milestone · Kairos Power’s own target · Awaiting the date

  • Small Modular Reactors: “Also inside this window, on dates that are their owners' own: Hermes 1 online in 2028 against a construction deadline moved from the end of 2026 to April 2029” Tests whether an advanced-reactor date holds after its regulatory construction deadline was extended by about 28 months, adding to or breaking the brief's record of slips.

Kreios first air-breathing propulsion flight

2028 · Launch · Kreios’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “Kreios, NewOrbit and Bellatrix with TelePIX each target 2028 for a first air-breathing flight” Bears on the brief's reading, on the field's record, that one or two air-breathing engines will have fired in orbit by 2030, and on its note that no announced flight has a published launch contract.

Ramp of Lumentum's fifth laser fab, a converted North Carolina gallium arsenide plant

2028 · Milestone · Lumentum’s own target · Awaiting the date

  • Integrated Photonics: “Its fifth fab, a converted gallium arsenide plant in North Carolina, is expected to ramp around 2028.” Bears on the brief's claim that the laser is the binding constraint as of late 2026: added capacity on schedule tests whether that constraint eases with fab capacity or persists for wafer-size reasons.

Start of the LIGO-Virgo-KAGRA fifth observing run (O5)

2028 · Milestone · LIGO, Virgo and KAGRA collaborations’s own target · Awaiting the date

  • Next-Generation Gravitational-Wave Observatories: “In November 2025 the fifth run was planned to start in 2028.” A 2028 start with the improved-coating test masses installed opens the brief's decisive in-detector coating measurement and the first test of A+ near 280 megaparsecs; a further slip extends the brief's record of schedule slips and pushes back the A# timeline on which the 440-megaparsec projection depends.

Start of commissioning of the MAGIS-100 100-metre strontium atom interferometer

2028 · Milestone · MAGIS-100 collaboration (Fermilab and Stanford)’s own target · Awaiting the date

  • Precision Quantum Sensing: “As announced in January 2026 — laser laboratory complete, atom sources due from Stanford in late 2026, installation through 2027 and commissioning from 2028 — the 100-metre strontium interferometer will show what phase noise, atom flux and wavefront control a kilometre-class instrument can expect.” Commissioning from 2028 would bring within reach the phase-noise, atom-flux and wavefront data the brief says a kilometre-class instrument needs; a slip would defer the calibration it relies on for the mid-band programme.

Metlen reaching 50 tonnes a year of by-product gallium production in Greece

2028 · Milestone · Metlen’s own target · Awaiting the date

  • Critical Mineral Midstream: “At least one gallium or germanium by-product retrofit outside China sells at commercial scale, or the announcements lapse; Metlen's 2028 target and S&P Global's 2030 projection of about 386 tonnes are the checkpoints.” Measures whether by-product gallium supply outside China responds to price at all, a parameter the brief says no model has.

MISO and the New York ISO reach their deadline for ambient-adjusted line ratings under FERC Order No. 881

2028 · Comes into force · On an official calendar · Awaiting the date

  • Transmission Without New Corridors: “MISO and the New York ISO are scheduled to implement them no later than 2028.” Meeting the deadline completes ambient adjustment across United States organised markets, which the brief's ten-year horizon assumes; a further extension would mean the weakest mandatory tool is still not universal seven years after the rule.

Commissioning of MP Materials' second US magnet plant at Northlake, Texas

2028 · Milestone · MP Materials’s own target · Awaiting the date

  • Critical Mineral Midstream: “MP Materials' second magnet plant was announced in July 2025 with commissioning expected to begin in 2028” The brief's 2028 magnet-facility scoreboard date: commissioning on time would support the reading that magnet capacity outside China is being built, and a slip would confirm the schedule-under-pressure language it records.

Open-access 6-inch indium phosphide line in the Netherlands begins operation

2028 · Milestone · PIXEurope open-access indium phosphide line’s own target · Awaiting the date

  • Integrated Photonics: “Within it, an open-access 6-inch indium phosphide line under construction in the Netherlands targets about 10,000 wafers a year and is expected to operate in 2028.” Bears on the brief's wafer-size account of the laser constraint: an open 6-inch line would extend the 3-to-6-inch transition beyond the two dominant laser makers.

NewOrbit first air-breathing propulsion flight

2028 · Launch · NewOrbit’s own target · Awaiting the date

  • Very-Low-Earth-Orbit Spacecraft: “Kreios, NewOrbit and Bellatrix with TelePIX each target 2028 for a first air-breathing flight” Bears on the brief's reading, on the field's record, that one or two air-breathing engines will have fired in orbit by 2030, and on its note that no announced flight has a published launch contract.

Publication of NOAA Atlas 15 volume 1 for Alaska, Hawaii and the territories

2028 · Publication · NOAA National Weather Service’s own target · Awaiting the date

  • Design Codes Under Nonstationarity: “Atlas 15 volume 1 publishes and supersedes Atlas 14, on the current schedule in 2027 for the contiguous states and 2028 for the rest.” Completes the supersession of Atlas 14 the brief tracks, extending its test of whether design values change by citation rather than by deliberate adoption to the remaining jurisdictions.

Solid-state transformers at the facility edge in NVIDIA's 800-volt design

2028 · Milestone · NVIDIA’s own target · Awaiting the date

  • The Physical Stack of AI: “NVIDIA’s first 800-volt power racks were expected in production in the second half of 2026, row-level power centres and the Kyber rack in 2027, and solid-state transformers at the facility edge in 2028.” Bears on the brief's transformer bottleneck: solid-state conversion at the facility edge would change how much of the conventional transformer queue the brief documents stands between campuses and power.

Volume production of optical input-output on the accelerator package

2028 · Milestone · Optical input-output vendors (venture-backed firms and one acquirer)’s own target · Awaiting the date

  • Integrated Photonics: “Optical input-output on the accelerator package: vendor targets of qualification by the end of 2027 and volume in 2028 are, on this field’s record, more likely to slip than not.” Follows qualification as the second dated vendor target the brief flags as more likely to slip than not; volume on time would count against the brief's reading of this field's schedule record.

QuantumScape 100 MWh line starting production

2028 · Milestone · QuantumScape’s own target · Awaiting the date

  • Advanced Battery Technologies: “A 100 MWh line is scheduled to start production in 2028, and no commercial vehicle launch date is given.” The brief says QuantumScape's readout is a line rather than a cell; a production start, and its yield, would move that manufacturing experiment from pilot toward scale.

Launch of the ESA–JAXA Ramses mission to Apophis

2028 · Launch · ESA (with JAXA)’s own target · Awaiting the date

  • Planetary Defense: “ESA's Ramses, built on Hera's design, is planned to launch in 2028 and arrive at the end of February 2029, before the encounter” Launch is the condition for characterising Apophis before its 13 April 2029 Earth flyby, the planned observation the brief describes as dependent on one 2028 launch and one unconfirmed budget decision.

Start of SpaceX orbital compute deployment, per its registration statement

2028 · Milestone · SpaceX’s own target · Awaiting the date

  • Orbital Data Centres: “The registration statement filed publicly on 20 May 2026 says the orbital compute initiatives “involve significant technical complexity, unproven technologies or technologies that do not exist”, that execution is “highly dependent on the successful development and scaling of Starship”, and that deployment is expected “as early as 2028”.” Deployment would bear on the brief's framing question, whether orbital compute is an industry or a reservation, and the applicant itself makes it conditional on Starship scaling.

Start of Tandem PV high-volume perovskite tandem panel manufacturing

2028 · Milestone · Tandem PV’s own target · Awaiting the date

  • Perovskite Tandem Photovoltaics: “Tandem PV expected utility-ready panels in 2026 and in April 2026 put high-volume manufacturing in 2028.” A second developer's date on the brief's ladder from record cell to shipped module; volume production would bear on its reading that 35% cells do not mean 35% panels are near, and a further move would extend its record of moved dates.

TerraPower operating licence application for the Kemmerer Natrium plant

2028 · Milestone · TerraPower’s own target · Awaiting the date

  • Small Modular Reactors: “The revised date is the one the project carried into construction: when work on the nuclear plant began in April 2026 the developer cited completion in 2030, and its published schedule anticipates an operating licence application in 2028.” Would show whether the one project whose schedule the fuel constraint already moved holds its revised licensing path toward 2030 completion.

Launch of China's Tianwen-3 Mars sample return mission

2028 · Launch · China National Space Administration’s own target · Awaiting the date

  • Mars Colonization: “China's Tianwen-3 is planned to launch in 2028 and return samples in 2031.” A 2028 launch would keep the only dated Mars sample return, which the brief sets against the defunded US programme, on its stated path; a slip would leave the brief's sample-return horizon with no dated mission at all.

Construction start of Type One Energy's roughly 400 MWe Infinity Two stellarator plant

2028 · Milestone · Type One Energy’s own target · Awaiting the date

  • Commercial Fusion: “Type One Energy targets its Infinity One stellarator prototype for 2029 and has said construction of a roughly 400 MWe Infinity Two could begin as early as 2028 with startup by 2034” One of the private targets the brief says this window tests; construction beginning before the Infinity One prototype has operated would bear on its reading of private schedules against the physics record.

Construction start of Britain's dedicated high-assay low-enriched uranium facility

2028 · Milestone · Developer of the British high-assay facility (unnamed in the brief)’s own target · Awaiting the date

  • Small Modular Reactors: “The dedicated British high-assay facility targets 27 tonnes a year , enough for “up to 30 advanced reactors,” with construction from 2028 and production in the early 2030s” Would show whether a non-Russian high-assay fuel source moves from plan to construction, bearing on the brief's finding that high-assay fuel has no market yet.

Vertical Aerospace's European eVTOL certification target

2028 · Decision · Vertical Aerospace’s own target · Awaiting the date

  • Advanced Air Mobility: “Vertical Aerospace had moved its target from 2026 to 2028 by February 2025.” Would show whether Europe's moved-out certification dates hold at their second setting, bearing on the brief's finding that no passenger eVTOL is certificated in Europe or Canada.

Xanadu's stated milestone of crossing the fault-tolerance threshold on its photonic hardware

2028 to 2029 · Milestone · Xanadu’s own target · Awaiting the date

  • Fault-Tolerant Quantum Computing: “The correct statement as of November 2026 is three platforms, all over short runs.” A photonic logical qubit whose error falls as the code grows would add a fourth platform to the brief's statement of where below-threshold error correction has run; a miss would leave photonics behind the optical-loss bottleneck the brief names.

January to March 2029

NIH develops and pilots metrics rewarding data sharing, open code, participation in replication consortia and methodological rigour, on the director's stated three-year target from March 2026

the first quarter of 2029 · Milestone · US Department of Health and Human Services and National Institutes of Health’s own target · Awaiting the date

  • Research Integrity Infrastructure: “NIH's director told House appropriators on 17 March 2026 that within three years the agency would develop and pilot metrics rewarding data sharing, open code, participation in replication consortia and methodological rigour; no funder in the sources read here yet makes a verification status count in evaluation.” A piloted metric would be the first funder rule under which a verification status counts in evaluation, changing the brief's statement that none does and the incentive half of its institutional assessment; a missed target would leave the integrity layer financed by volunteers and one-off grants, as the brief describes it.

October to December 2029

France's reimbursement arrangement for SonoCloud-9 glioblastoma trial care expires

19 December 2029 · Milestone · Fixed in law · Awaiting the date

  • Focused Ultrasound in the Brain: “Carboplatin with the device has orphan designation from both the US and European regulators, and France reimburses the trial under an arrangement listed as expiring on 19 December 2029.” If SONOBIRD has reported a benefit by then, the arrangement is the bridge to routine coverage and the institutional sentence changes from a state paying for a trial to a state paying for a device; if it lapses with no result or no successor, the only public payment for ultrasound-mediated delivery in the record ends, which would weaken the brief's reading of the oncology route.

April to June 2030

Google's option to expand its Fervo Cape Station offtake by about 600 MW, to nearly 1 GW, reaches its June 2030 date

June 2030 · Decision · Fervo Energy’s own target · Awaiting the date

  • AI Electricity Demand: “none supplies a gigawatt to a data centre as of November 2026.” Exercised and delivered, the option would put nearly 1 GW of enhanced geothermal behind one prospective Google data centre in Utah, the first test of the brief's statement at that scale. The company's 1 September 2026 release ties the option to June 2030 without saying whether that is the exercise or the delivery date, and the data centre is subject to engineering, state and local approvals.

July to September 2030

Commercial operation of Hydrostor's 500 MW / 4,000 MWh Willow Rock compressed-air storage plant

July 2030 · Milestone · Hydrostor’s own target · Awaiting the date

  • Energy Storage Revolutions: “Hydrostor's 1.75 MW Goderich facility in Ontario has been operating since 2019 as a commercial reference plant, seven years, while its 500 MW / 4,000 MWh Willow Rock project in California had its offtake amended three times” Operation would make Willow Rock the first Western eight-hour compressed-air plant delivering electricity. California Community Power's contract, as approved by San Francisco in April 2026, expects commercial operation on 1 July 2030; the federal environmental assessment of June 2026 schedules about 60 months of construction from July 2026, which implies mid-2031.

2030, no closer date given

Denmark's livestock emissions price under the Agreement on a Green Denmark takes effect, at 300 kroner a tonne

2030 · Comes into force · Fixed in law · Awaiting the date

  • Low-Methane Livestock: “The same agreement prices livestock emissions from 2030 at 300 kroner a tonne, rising to the equivalent of almost $120 by 2035.” Taking effect on schedule would give the brief's cost bottleneck its first statutory buyer of avoided enteric methane outside a mandate; deferral or dilution after the 2025 herd reports would confirm the brief's trust bottleneck and leave processors' programmes as the only payers.

Completion of the Air Force microreactor at Eielson Air Force Base, Alaska, built by Oklo

2030 · Milestone · US Air Force’s own target · Awaiting the date

  • Microreactors and Process Heat: “its June 2026 project newsletter gives an estimated completion date of 2030, with environmental review starting on base in summer 2026, and describes the reactor as supplementing the base’s existing coal-fired heat and power plant.” Met: the first civil-licensed microreactor supplying heat and power to a cogeneration site gives the brief its nearest test of the combined-heat case MIT ranked most promising; missed: the one civil defence project in Alaska joins the Canadian and test-bed slip record.

Resolution of the AI-risk adversarial collaboration's leading shared crux: whether METR or a similar group finds before 2030 that AI can autonomously replicate, acquire resources and avoid shutdown

2030 · Result due · On an official calendar · Awaiting the date

  • Adversarial Collaboration: “The strongest one the two groups shared — whether METR, formerly ARC Evals, or a similar group finds before 2030 that AI can autonomously replicate, acquire resources and avoid shutdown — “would narrow the disagreement between the median pair from 22.7 percentage points to 21.48 percentage points in expectation,” which “means eliminating 5.35% of their disagreement.”” If the crux resolves and the 22 participants are re-surveyed, movement close to their 2023 conditional forecasts would turn the brief's claim that no preregistered update has been observed to bind into a first positive instance and reshape its proposed protocol around registered concessions; movement well short of them would confirm that the method's value rests on the audience; no re-survey leaves the decisive experiment unrun and the 10-year horizon must say so.

Resolution of the AI-risk adversarial collaboration's crux on whether war is declared between major powers by 2030

2030 · Result due · On an official calendar · Awaiting the date

  • Adversarial Collaboration: “The concerned group’s own leading cruxes also included whether war is declared between major powers by 2030.” A second, independent resolution of a concerned-group crux; whether that group's forecasts then move as its members said they would tests the same binding claim from the other side of the disagreement, and a divergence between the two groups' compliance would add an asymmetry the brief does not now report.

First observations at the LIGO-India observatory at Aundha, Maharashtra

2030 · Milestone · LIGO-India project and LIGO Laboratory’s own target · Awaiting the date

  • Next-Generation Gravitational-Wave Observatories: “LIGO-India was approved twice and broke ground in April 2026, ten years after the first approval, with first observations targeted for 2030.” Observing in 2030 adds the long baseline the brief says the network needs for localisation while Virgo's return is uncertain; a slip would confirm the brief's reading that every forward date in the subject is a target, and leave the network dependent on Virgo for a third site.

Tellus Energy Solutions' natural hydrogen pilot in northern Bavaria reaches its target of a commercial proof of concept

2030 · Milestone · Tellus Energy Solutions’s own target · Awaiting the date

  • Geologic Hydrogen: “Tellus Energy Solutions’ pilot in northern Bavaria aims for a commercial proof of concept by 2030 (company’s target, as reported by the German academies).” A proof of concept with a published sustained flow would be the first such record in Europe and a candidate for the decisive test; a miss or a proof of concept without flow data would extend the brief's finding that drilling continues without a second producing field.

2035, no closer date given

Canada's Nuclear Energy Strategy aim to demonstrate a Canadian microreactor

2035 · Milestone · Government of Canada’s own target · Awaiting the date

  • Microreactors and Process Heat: “the Nuclear Energy Strategy launched in June 2026 aims to “demonstrate a Canadian microreactor by 2035.”” Met: Canada moves from an inactive project and three held design reviews to an operating unit, and the brief's Canadian position is rewritten; missed or quietly dropped: the remote and northern case in Canada rests on a provincial pilot alone.

Launch of the three LISA spacecraft on an Ariane 6

2035 · Launch · European Space Agency’s own target · Awaiting the date

  • Next-Generation Gravitational-Wave Observatories: “2035 is the agency’s stated date, with adoption, a prime contract and a launcher behind it, which is more than any other next-generation observatory has.” A 2035 launch would make LISA the first next-generation observatory delivered on its adopted date and open the millihertz band; a slip, for example if Europe must replace the American lasers and telescopes, would support the brief's finding that the hardware partnership rather than the physics is LISA's bottleneck.