1 · Why this matters

Speculative If a hydrogen well outside Mali can hold a flow about ten times Bourakebougou’s for years — which no well has yet shown, and 7 names the test that would — the prize is a supply of hydrogen whose modelled cost sits below what most buyers will pay without subsidy. The Hydrogen Economies brief puts that willingness-to-pay ceiling below $2 per kilogram for most sectors. Published models of geologic hydrogen run from $0.14 to $6.82 per kilogram, explorers target about $1, and electrolytic hydrogen is quoted at $3.9 to $13. Geologic estimates cluster near $1, about half the ceiling, while the low end of fossil hydrogen with carbon capture, $1.9, only just reaches it. None of the geologic figures is a produced cost.

Established The magnitude is set by a per-well rate, and the measured rates are small. The world uses about 100 million tonnes of hydrogen a year, made mostly from gas and coal at roughly 10 to 12 kg of CO2 per kilogram. A high-purity geologic stream is modelled at about 0.4 kg CO2e per kilogram, rising to 1.5 when 22% of the gas is methane. Against that, Bourakebougou yields about 50 tonnes a year, and the best appraisal result elsewhere, Ramsay in South Australia, models a development well at about 36.5 tonnes a year. At that rate, matching the roughly 1 million tonnes of low-emissions hydrogen made worldwide in 2025 would take about 27,000 wells; matching total demand would take about 2.7 million.

Frontier Who gets it is decided by rock and by law, and the first revenue may not be hydrogen at all. The gains go to whoever holds tenure where iron-rich source rock, reservoir and seal coincide: a village in Mali since 2012, explorers in South Australia, France since 2022, Germany since 1 April 2026, and Saskatchewan, where one company reports about 1.3 million acres under permit. A cubic metre of hydrogen weighs about 0.09 kg, so the gas is costly to move and the first beneficiary is a nearby ammonia, methanol or power user rather than a distant market. Several projects report helium at 3 to 20%, and the explorer that has published the only flow-based rate outside Mali is preparing to book a helium resource before any hydrogen resource.

Frontier The condition is that the resource is a flow and not a stock. Mali’s steady pressure is read as live replenishment, but it is equally consistent with dissolved gas coming out of solution at depth, and the two readings predict different futures for every well drilled. The bottleneck list in 5 starts with that difference.

2 · Concept overview

Established Geologic hydrogen is molecular hydrogen made by rock rather than by industry. The federal prospectivity method recognises three source classes: serpentinisation, in which water oxidises ferrous iron in ultramafic rock and releases hydrogen; radiolysis, in which radiation from uranium- and thorium-bearing rock splits water; and deep sources along faults, sutures and zones of high heat flow. The federal global model adds banded iron formations and highly mature organic-rich rocks as possible sources, and cites growing evidence that serpentinisation runs well below the 200 °C once thought necessary. Established Generation is not in question. What happens after generation is: hydrogen migrates, is eaten by microbes, reacts with minerals, leaks to the atmosphere, and only occasionally is trapped.

Established There are two production routes, and the colour labels add nothing to either. The natural route finds hydrogen the Earth has already made and drills it, as petroleum is drilled. The stimulated route injects water, heat, catalysts or acidified fluid into iron-rich rock and produces what the reaction makes, which turns an exploration problem into a reactor problem. Trade usage calls the first white or gold hydrogen and the second orange; this brief says natural and stimulated.

Established The question this brief owns is what the subsurface record shows, well by well and measurement by measurement. The Hydrogen Economies brief sets out why geologic hydrogen must be judged as a stock or a flow, records the two-orders-of-magnitude gap between observed and commercial flow, and treats the subject as one supply option among four. This brief does not restate that case. It examines the evidence underneath it: what the two federal publications do and do not estimate, what the only producing field’s pressure record can and cannot distinguish, what the exploration wells drilled since 2023 have and have not disclosed, what stimulation has shown outside the laboratory, and what every published cost assumes.

Established The literature is quoted in incompatible units, and converting them is the first act of analysis. Flow appears as cubic metres per day, kilograms per day and tonnes per year; composition as mole per cent, volume per cent and parts per million. At standard conditions a cubic metre of hydrogen weighs about 0.09 kg, so Bourakebougou’s reported 1,500 m³ a day is about 135 kg a day, or about 49 tonnes a year. Established Concentrations differ by method as well as by well. A mud-gas reading, a core-desorption assay, an air-corrected sample and a flow-test analysis measure different things, and only the last says anything about what a well would deliver. This brief converts rates to tonnes a year wherever the source allows and names the method behind every concentration it reports.

Established Two neighbouring subjects are excluded except where they bear on supply. Demand, transport and end-use economics belong to Hydrogen Economies. The completion toolkit that stimulation borrows from shale and geothermal drilling is examined in Geothermal Megaprojects. Where either changes the supply question, this brief cites it rather than repeating it.

3 · Current scientific position

Established The best-known number in this subject comes from a model whose output spans seven orders of magnitude. Ellis and Gelman’s 2024 mass-balance model in Science Advances gives a most probable value of about 5.6 million megatonnes of hydrogen in the crust, inside a range of 103 to 1010 Mt, and states that this hydrogen contains more energy, about 1.4×1016 MJ, than all proven natural gas reserves on Earth, about 8.4×1015 MJ. It adds that most of it is likely impractical to recover, and that a small fraction, for example 105 Mt, would meet projected net-zero hydrogen demand for about 200 years. Established The 105 Mt is an illustration, roughly 2% of the most probable value, and the authors present it as one. The model does not evaluate the size or distribution of accumulations; it is a global inventory with no geography.

Established The model’s answer depends most on the one parameter nobody has measured in a real reservoir. In the paper’s sensitivity table the largest correlation with the result, 0.72, belongs to the residence time of hydrogen against consumption inside a reservoir, entered with a range from 104 years to 5 billion years and a midpoint of 1.4 million. Generation rate comes second at 0.44 and trapping efficiency third at 0.30; trapping efficiency itself is entered at 0.1 to 10%, so most generated hydrogen is assumed never to be trapped. Established The generation input is the second striking choice. The literature estimate the paper cites is 23 ± 8 Mt a year, which the authors treat as a minimum, while the model’s median input is 500 Mt a year, more than twenty times higher. Speculative A reader who quotes the most probable value as a central estimate is accepting a generation rate an order of magnitude above the published one and a consumption rate that no field has measured.

Established The federal 2025 product is a map of relative chances, and it states that no volumes are known. United States Geological Survey Professional Paper 1900, by Gelman, Hearon and Ellis and released on 16 January 2025, multiplies a chance of sufficiency for source, reservoir and seal into a prospectivity score for the conterminous United States. Its median map runs from 0.15 to 0.85 with a mean of 0.54, and it says that because “no volumes are known yet for subsurface hydrogen occurrences” the scale is not benchmarked to any volume. The highest scores fall in the midcontinent, including parts of Kansas, Michigan, north Texas and southern Oklahoma, and along the central and northern California coast; the offshore eastern seaboard is offered as a hypothesis. The agency’s programme page states that “it is currently not possible to quantitatively assess the resource potential,” and announces no national resource assessment. Frontier Any sentence that attaches a tonnage to “the 2025 USGS assessment” has merged two publications: one with a number and no geography, and one with a geography and no number.

Established The map encodes assumptions that bear directly on where the wells are going. It treats salt as a good seal and scores seals generally below reservoirs. It lets hydrogen migrate laterally up to 250 km, with the chance of sufficiency falling linearly to zero over that distance, a rule the authors use to stand in for biotic and abiotic consumption along the path. It cites 96 mol% hydrogen in the Hofmann #3 well in Iowa and high concentrations in several Nemaha High wells in Kansas between the 1980s and the early 2000s, and its compilation of drilled wells, shown as context rather than used as a model input, leaves out dry holes because some may hold unrecognised hydrogen. Speculative The Nemaha occurrences are the ones now being drilled, so a successful well in a high-scoring cell will test the method only if hydrogen analyses from unsuccessful wells in high-scoring cells are reported as well.

Established Every estimate of how much hydrogen the continents release disagrees with every other. The literature generation figure is 23 ± 8 Mt a year. A Royal Society working group, as summarised by the German national academies, puts leakage to the atmosphere at up to 0.74 Mt a year; the federal model’s most probable flux to the atmosphere is about 24 Mt a year, roughly thirty times higher, inside its own range of under 1 to about 1,000 Mt. A modelling study cited by the academies puts the renewable production rate in the order of 5 Mt a year, under 1% of projected 2050 demand. Frontier The spread between 0.74 and 24 Mt, for what is nominally the same flux, is the clearest measure of how little the field knows about the flow term on which the replenishment case rests.

Established The largest natural hydrogen flow ever measured is about four Mali wells. In the Bulqizë chromite mine in Albania, Truche and colleagues measured a relatively constant flow of at least 200 tonnes a year of gas about 84% hydrogen by volume, over six years, using a network of 38 boreholes. Their institutions describe it as the highest natural hydrogen flux measured to date, and it is an order of magnitude above comparable outgassing sites in Oman and Turkey. Some of the gas may derive from reactions 160 to 165 million years ago. Established The team’s own releases say natural hydrogen is not renewable, because its production is far too slow for global energy needs, and calls the outflow minimal against world production of about 100 million tonnes a year. Established At 200 tonnes, the record flux is one five-hundred-thousandth of annual demand.

Established Bourakebougou is the only producing field, and its record is better documented than its reputation suggests. Discovered in 1987 during water drilling and producing since 2012 for a village power supply, the field is characterised in a 2023 Scientific Reports paper by Maiga, Deville, Laval, Prinzhofer and Diallo. Twenty-five wells have been drilled; the paper’s conclusion reports hydrogen in all of them, while its introduction counts 24 discoveries plus one basement well. Hydrogen occurs in stacked reservoirs from about 100 m to about 1,460 m, the shallow main reservoir a karstified dolomite with porosity of 0.21 to 14.32%, sealed by dolerite. Gas from that reservoir is about 98% hydrogen with about 1% each of nitrogen and methane. The first reservoir found flows about 1,500 m³ a day; a 2022 trade account gives 1,300. Established After eleven years of operation, “no pressure decline has been recorded,” and the pressure has risen from 4.5 to 5 bars.

Frontier The pressure record does not distinguish live generation from a dissolved stock coming out of solution. The same paper reports that below a free-gas zone about 800 m thick hydrogen is mainly dissolved in water, and that the shallow reservoir’s potential depends on “the degassing potential that is fed by a source of dissolved gas at depth and recharged progressively.” IFP Energies nouvelles, which summarises the doctoral work behind the paper, puts it more directly: as production lowers pressure, dissolved hydrogen is released as gas and recharges the upper reservoir. Established The paper also states that “the residence time of H2 in the subsurface remains unknown so far,” leaves open whether hydrogen is being generated in situ today, and calls for a dynamic model before reserves or production rates can be defined. Frontier Those are two different resources. Exsolution from a large dissolved inventory would hold pressure for a long time and then decline, as a stock does; active generation would hold it indefinitely at the generation rate. Speculative Eleven years at about 50 tonnes a year is compatible with both, so Mali is evidence that hydrogen can be trapped and produced, and not yet evidence that it is replenished on a production timescale.

Established Outside Mali, the count of explorers has grown and the disclosed flow record has not. The federal programme page counted more than 40 companies exploring for geologic hydrogen at the end of 2023, a fourfold rise since 2020. The German academies’ discussion paper of April 2026 states that flow-rate data from wells are available only for Bourakebougou, and that elsewhere “there are no flow tests from wells.” Established Since then one explorer has published a flow-based rate, and it lands at Mali’s scale rather than above it.

Frontier Ramsay, South Australia: the first flow-based appraisal outside Mali models about 36.5 tonnes a year per well. Gold Hydrogen flow-tested the Parara Limestone in Ramsay 3 on the Yorke Peninsula from 13 to 16 October 2026, after drilling that recorded air-corrected hydrogen concentrations of up to 97%. The company says appraisal testing and modelling indicate that a development well could produce about 100 kg a day, roughly 36.5 tonnes a year at continuous output, and that a 500 m horizontal well is modelled at up to 112 kg a day, although none has been drilled. It cites Bourakebougou, at about 125 kg a day, as the only comparable appraisal result it knows of, and cautions that the results do not confirm commercially recoverable hydrogen, sustained flow rates or project economics (company’s own figures). Speculative A reservoir model that credits a 500 m horizontal well with only 12% more than a vertical one is saying that contact area does not limit the well, which points at supply or recharge as the constraint.

Frontier The company’s own development plan shows the scale problem in its own units. Gold Hydrogen is studying about 20,000 tonnes a year of methanol with its shareholder Mitsubishi Gas Chemical under a non-binding memorandum signed in June, according to a November 2026 report, with a feasibility study due in the March quarter of 2027. Established Methanol made from carbon dioxide consumes three molecules of hydrogen per molecule of methanol, about 0.19 kg of hydrogen per kilogram, so 20,000 tonnes of methanol needs roughly 3,800 tonnes of hydrogen a year. Frontier At the modelled 36.5 tonnes per well that is about a hundred development wells, and the company has not said how many it plans.

Frontier Saskatchewan: Canada’s first dedicated hydrogen well found hydrogen, and then water. Max Power’s Lawson well near Central Butte, announced on 16 January 2026, returned 16.80 to 19.07% hydrogen in a through-casing flow test and up to 28.6% in sealed core-tube samples, with helium averaging 4.4% across nine core samples and reaching 8.7%. The flow-test gas was described as about 90% hydrogen and nitrogen combined. No flow rate was given; the release says the well showed “robust initial rates and pressures” and was then “overtaken by a powerful influx of formation brine” (company’s own figures). Frontier A second Lawson well reached 2,370 m in July 2026 with readings “continuously above background” over 831 m, reported without units or method, and a step-out well 325 km away, Bracken, was described as showing anomalies in several zones, with no concentrations and no test. Established The January release discloses paid promotional agreements of US$165,000, US$130,000 and US$150,000 and a €200,000 extension. Frontier On the published record Lawson is a hydrogen-bearing system with a water problem and no measured rate, which is some distance from a discovery in the resource sense.

Frontier Kansas: the best-funded explorers disclose least. HyTerra’s McCoy 1, drilled to 1,695 m on the Nemaha Ridge and announced in October 2025, reported “elevated hydrogen and helium flowing gas shows” during swabbing and laboratory confirmation of both gases, with no concentrations and no rate; a production test was planned for after the 2026 winter, and no rate from it appears in the sources this brief relies on. Established Koloma, according to securities filings reported in January 2025, had raised about $394 million, including $245.7 million in February 2024. Its operating arm described a five-well test programme from late 2022 through 2023, and its spokesperson said, “We are not aware of a production well or the plans you reference.” Speculative Close to $400 million of private capital has produced no public flow datum, which is consistent either with a commercially sensitive result or with no result worth disclosing, and the record does not say which.

Established Composition sets the processing bill before flow sets the revenue. A 2025 review of the field in Energy & Environmental Science by Mao and colleagues reports purity across known sites ranging from under 10% to over 90%, with a mean of about 40.3%, the balance mostly nitrogen, with methane, carbon dioxide and water vapour. It cites a study in which a fall in purity from 85% to 35% adds about $0.6 per kilogram to the cost of purifying to above 99%. A federal webinar in April 2025 reported helium at 3 to 20% in a number of projects. Hydrogen Economies makes the argument that separation plant scales with total gas rather than hydrogen throughput; these are the measured inputs to that argument.

Established Carbon intensity is low only while methane stays out of the stream. The same review gives natural hydrogen a mean of about 0.37 kg CO2e per kilogram against about 11 for grey hydrogen, with most emissions arising from tail-gas treatment; an MIT thesis estimates 0.40 for its baseline case. The Clean Air Task Force gives about 0.4 kg at 85% hydrogen with minimal methane, and 1.5 kg at 75% hydrogen and 22% methane. Frontier None of these is a measurement at a producing well, and no fugitive-emissions figure for Bourakebougou appears in the record this brief examined.

Frontier There is no produced cost, and the published cost models do not rest on a measured flow. The German academies collect estimates from $0.14 to $6.82 per kilogram, note that explorers target about $1, and compare green hydrogen at $3.9 to $13, blue at $1.9 to $5.9 and grey at $1.0 to $4.3. Established The same lower bound appears in a 2025 National Science Review model by Zhang and colleagues, which runs 32,000 scenarios to a range of $0.14 to $5.33 per kilogram, assuming 20 production wells at 400 to 500 m and accumulations of specified volume, one of them 1.8 billion m³; it states no per-well flow rate. Frontier At Bourakebougou’s reported rate a single well would take about 3,300 years to produce 1.8 billion m³. Established A January 2025 EarthArXiv preprint by Mathur and colleagues gives $0.54 for natural and $0.92 for stimulated hydrogen, names wellhead flow rate and purity as the primary cost drivers, and conditions its result on further field data; the federal webinar showed $0.44 to $1.45 across well designs at 1 and 3 km; an MIT thesis gives $1.45. Established One trade analyst’s summary is exact: “every cost claim in this space is self-reported and pre-field-validation.”

Frontier Stimulation has left the laboratory and has not yet published a rate. Hydrogen Economies describes the concept and the volume-expansion objection; the field record is newer. Established ARPA-E’s project list for its geologic hydrogen topics names 18 projects whose awards sum to about $22.8 million, spanning fracturing, catalysts, organic acids, carbon dioxide, cyclic injection and microbial studies; a trade account gives $20 million to 16 teams in 2024. Frontier In Oman, a field-scale injection into serpentinised peridotite at almost 1 km depth, reported by Shannon, Ellison, Al Mani, Matter and Templeton for the European Geosciences Union assembly in May 2026, recovered fluids with pH up to about 11.5 and gas “dominated by hydrogen,” with no volumes given. Frontier In the Permian Basin, Eclipse Energy and Weatherford reported on 13 November 2026 a 30-day pilot in a mature, naturally fractured carbonate oil reservoir in which hydrogen moved between wells, was produced at an offset well and was sold alongside natural gas, at a rate more than four times that of a June 2025 California trial; no volume, rate or concentration was released and the injected materials were not named (vendor). Speculative Hydrogen made inside an oil reservoir is a different proposition from serpentinisation, because its precursor may be the hydrocarbons themselves, and nothing published says which.

Speculative The modelled stimulated rates start where Mali already is. A Texas A&M paper at the February 2026 Stanford geothermal workshop extrapolates a 13-day laboratory record on a sample of 0.00585 m² to field scale through an assumed fracture surface area, and obtains first-day rates of 532, 1,597 and 2,661 m³ a day for its uncatalysed, catalysed and heated-catalysed cases. It excludes the cost of restimulation. Frontier Even on those assumptions the opening rates bracket Bourakebougou’s 1,500 m³ a day, so the stimulated case does not escape the flow-rate problem; it relocates it to the question of how long a fracture network stays reactive.

Frontier The money has run well ahead of the data. A June 2026 trade analysis counts over $500 million of venture investment in the space with no commercial production, of which Koloma accounts for nearly $400 million. Established The public stimulation programme is about one twentieth of that private total. Speculative An industry whose capital is private and whose disclosure is voluntary will produce its decisive data on its investors’ schedule, which is why 10 treats disclosure as a requirement rather than a courtesy.

4 · Frontier questions

Frontier Is anything being replenished on a timescale an operator cares about? The pressure record at Bourakebougou supports both live generation and exsolution from a dissolved inventory, as 3 sets out. The two predict the same past and different futures. Until a mass balance separates them, the self-replenishing well remains a hypothesis with one supporting observation, and the industry’s preferred reservoir model, an accumulation drawn down quickly and then produced at a recharge rate, has no recharge rate to settle to.

Frontier What seals hydrogen, and for how long? At Mali the seal is dolerite whose sealing capacity comes from being only slightly fractured, with none of the fractures open, according to the institute that hosted the field study. The federal map treats salt as a good seal. An AAPG Explorer interview with the federal model’s lead author reports that the seal capacity of other lithologies “is not yet well understood.” Speculative If dolerite sills and salt are the only proven seals, the prospective area is far smaller than the source-rock area, and the map’s multiplication of source, reservoir and seal is doing exactly the right thing by letting a weak seal term zero a cell.

Frontier How fast do microbes and minerals consume a trapped accumulation? This is the parameter that dominates the federal model, and it has no field measurement. The same interview sets out a window: abiotic consumption more likely above 200 °C, microbial consumption more likely at 120 °C or lower, and an accumulation window somewhere between 100 and 200 °C. Speculative Mali’s main reservoir sits about 100 m down, far inside the microbial range, so either consumption there is slow or supply outruns it, and measuring which would constrain both the federal model and the replenishment thesis at once.

Frontier Is the global generation rate 0.74, 5, 23 or 500 megatonnes a year? Those four figures, from a learned-society flux estimate, a modelling study, the literature compilation and the federal model’s median input, span nearly three orders of magnitude. Speculative At the bottom of the range geologic hydrogen is a curiosity; at the top it is a primary energy source. No measurement programme in the record this brief examined is designed to narrow the range, which is the strongest argument for one.

Frontier Can a stimulated rock volume keep reacting? Laboratory studies put the best temperature for hydrogen production at around 200 to 300 °C. The Texas A&M modeller quoted in a 2026 engineering magazine expects that commercial rates will need a lot of fracturing and catalysts, and restimulation as well. One ARPA-E project exists specifically to stop output falling over time, which states the problem. Speculative The decisive quantity is not the opening rate but the decline curve, and no field test has published one.

Speculative Is the first business helium rather than hydrogen? Hydrogen Economies raises this as a speculative possibility. The evidence since has moved it. Frontier The Ramsay explorer targets a maiden helium contingent resource before any hydrogen resource; Lawson reports helium averaging 4.4% in core; the federal webinar reports helium at 3 to 20% in a number of projects; and Germany’s April 2026 act made hydrogen and helium free-to-mine minerals together. Speculative A helium-led industry would value hydrogen as a co-product and would be judged on helium prices, which is a different investment case from the one the hydrogen framing presents.

Frontier Does a concentration anomaly predict deliverability? Lawson produced 28.6% hydrogen in core tubes, 16.8 to 19.1% in a flow test, and then brine. Its second well reported readings above background over 831 m without stating a unit. Frontier No published relationship links a mud-gas or soil-gas anomaly to a well’s sustained rate, and until one exists every anomaly is a reason to drill rather than evidence of a resource.

5 · Technological bottlenecks

Established Per-well rate is the binding constraint, and every other bottleneck is secondary to it. The only flow-based rates on record are Bourakebougou’s, about 49 tonnes a year, and Ramsay’s modelled 36.5. At those rates a million tonnes a year takes tens of thousands of wells, each with its own separation, compression and gathering. Frontier No amount of progress on the bottlenecks below makes up for a well that delivers a hundred kilograms a day; an order-of-magnitude higher rate would make most of them ordinary engineering.

Established Water is both the store and the enemy. At Mali most of the hydrogen at depth is dissolved in aquifers and the gas cap is fed by degassing. At Lawson the first well was overtaken by formation brine. Frontier Wells in hydrogen systems will produce water, sometimes mainly water, and the cost of lifting and disposing of it is absent from every published cost model cited in 3. Stimulation adds the opposite problem: it needs water injected, at temperature, into rock that the reaction is filling with new minerals.

Frontier Disclosure has no standard, and the record shows it. Readings are published without units, concentrations without methods, flow tests without rates, and the best-funded explorer publishes nothing. The Saskatchewan explorer says its resource modelling will follow “applicable standards and regulatory guidance” without naming one, and the Australian explorer is booking a helium contingent resource before any hydrogen resource. Speculative A resource-classification code written for hydrogen, specifying what a flow test must report and for how long, would do more for the subject’s credibility than any single well.

Established Separation of a dilute stream is expensive in proportion to what is not hydrogen. Mean purity across known sites is about 40%, mostly diluted in nitrogen, and the cost of purifying rises by about $0.6 per kilogram between 85% and 35% hydrogen. Mali and Ramsay are high-purity exceptions; Lawson’s flow-test gas was under a fifth hydrogen. Frontier A dilute well needs the same separation plant as a pure one at several times the gas throughput, which is the Hydrogen Economies argument made concrete.

Established Hydrogen is light, and moving it is costly. A 2022 trade account reports that the Mali operator intends to compress its gas to 300 bars and above for transport to the nearest port, and that liquefaction is not an option because of its energy cost. The Clean Air Task Force notes that deposits may not align with existing industrial demand centres. Frontier Geologic hydrogen is therefore most valuable where the user is on top of the resource, which is why the Australian plan converts it to methanol near the resource.

Frontier Tenure is cheap to fix and unevenly fixed. Hydrogen Economies records South Australia’s amendment. France recognised natural hydrogen under its mining code in April 2022, and permits limited methane extraction only for use on site, with any surplus reinjected or converted. Germany’s Hydrogen Acceleration Act, enacted on 1 April 2026, added hydrogen and helium to the minerals that can be licensed without landowner consent. The Saskatchewan explorer calls the province’s framework Canada’s most advanced, which is the company’s description. Speculative Where tenure is missing, the bottleneck is absolute, and it says nothing about the rock.

Frontier Fugitive gas is unmeasured at the one site where it could be. Hydrogen’s hundred-year warming potential is put at 4.3 to 12 with a central value of 11, and at 33 over twenty years. Co-produced methane raises the modelled carbon intensity from about 0.4 to 1.5 kg CO2e per kilogram. Frontier A resource that is found by detecting hydrogen escaping through rock is not an obvious low-leakage resource, and the measurement that would settle it at Bourakebougou has not been published.

6 · Research dependencies

Frontier The subject waits on a consumption rate more than on a generation rate. The federal model is most sensitive to how long a trapped accumulation survives microbial and mineral consumption, and a Koloma laboratory project under ARPA-E is studying the microbes naturally present in hydrogen reservoirs. Speculative A measured consumption rate in one producing reservoir would narrow the federal inventory by more than any refinement of the generation term.

Frontier It waits on seal petrophysics for the smallest molecule. Dolerite and salt are the seals with evidence behind them. The capacity of shale, carbonate and fractured crystalline rock to hold hydrogen over geological time is, in the AAPG interview’s phrase, not yet well understood. Speculative Seal measurement is ordinary laboratory work, and its absence is a funding choice rather than a scientific barrier.

Frontier It waits on a way to tell young hydrogen from old. The Bulqizë team attributes some of its gas to reactions 160 to 165 million years ago, which shows that the age and origin of hydrogen can be argued from geochemistry. Speculative Applied at Bourakebougou, the same reasoning is what would separate live generation from a dissolved inventory, and it is the scientific step between the field’s best observation and its central claim.

Established It waits on reservoir models that carry a dissolved phase. The Mali study calls for a dynamic model before reserves or production rates can be defined, because most of the hydrogen at depth is in solution. It also identifies the neutron log, which responds to free hydrogen, as the best candidate for detection beyond gas logging. Frontier Petroleum reservoir simulators handle dissolved gas routinely; what is missing is hydrogen-specific solubility, diffusion and consumption data to put into them.

Frontier For stimulation, it waits on reaction kinetics in real rock. The ARPA-E portfolio funds catalysts, organic acids, carbon dioxide, electrical fracturing and real-time geophysical monitoring of the mineral changes that release hydrogen. Speculative Each is a laboratory programme until a field test publishes kilograms of hydrogen per tonne of rock reacted and how that figure changes over months.

Established And it waits on atmospheric chemistry it inherits from the wider hydrogen economy. The warming effect of leaked hydrogen, through methane lifetime and stratospheric water vapour, is set out in Hydrogen Economies and in the German academies’ paper. Geologic production adds nothing new to that science; it adds a production route on which nobody has yet measured the leak.

7 · Required experiments

Frontier The decisive result is a year of published production from a second field. The decisive result is a dedicated hydrogen well outside Mali that produces for at least twelve months and publishes its rate, flowing and shut-in pressure and composition at least monthly, at a sustained rate an order of magnitude above Bourakebougou’s, about 500 tonnes a year. That threshold applies the flow-rate analysis cited in Hydrogen Economies, which puts commercially viable rates at least an order of magnitude above observed occurrences, to the one occurrence that has been produced. Frontier A year at Ramsay’s modelled 100 kg a day would confirm a local fuel, not an industry; a year at about 1.4 tonnes a day would move the subject from frontier to the first rung of a resource. Established Candidates exist: Gold Hydrogen at Ramsay, whose methanol feasibility study is due in the March quarter of 2027; Max Power’s completions programme at Lawson, for which no timeline is given; and HyTerra’s planned production test in Kansas. Frontier None has committed to publishing a year of data, and the experiment is the publication as much as the well.

Frontier The cheapest decisive measurement is at the field that already produces. A shut-in and pressure build-up test at Bourakebougou, combined with sampling of dissolved gas at depth and a mass balance of gas produced against pressure recovered, would show whether recharge comes from exsolution or generation. Speculative If recovered pressure tracks what the dissolved inventory can supply, Mali is a stock with a long tail; if it exceeds it, Mali is a flow and the replenishment thesis has its first quantitative support. Frontier It needs no new hardware, and none of the sources this brief relies on describes one planned.

Frontier Measure consumption where the hydrogen is. A time series of microbial activity and hydrogen loss in one producing reservoir would put a number on the residence time that carries a 0.72 weight in the federal model. Speculative Even an order-of-magnitude bound would shrink the model’s seven-order range by more than any other single input.

Frontier Publish a stimulated test with a closed mass balance and a decline curve. The Oman injection has shown that hydrogen-dominated gas comes back from serpentinised peridotite near 1 km; the Permian pilot has shown that hydrogen can be produced and sold through existing gas infrastructure. Frontier Neither has published kilograms. The test that matters reports hydrogen produced per tonne of rock reacted, its decline over at least six months, and the effect of restimulation; for hydrogen made in an oil reservoir it also reports the precursor, so that a reader can tell rock chemistry from hydrocarbon conversion. Speculative Eden GeoPower’s stated pilot with a partner, which could start late in 2027, would be the first chance to see this from an electrical-fracturing approach.

Established Measure fugitive methane and hydrogen at a producing site. The instruments and protocols exist and are the ones Hydrogen Economies already asks for across the hydrogen economy. Frontier One season of measurement at Bourakebougou or Ramsay would replace every modelled carbon-intensity figure in 3 with an observed one.

Frontier A falsification test for the prospectivity method is available now. The federal map assigns relative chances before drilling. Speculative Scoring every hydrogen well drilled since its release against the cell it was drilled in, dry holes included, would give the method its first false-positive rate; the report’s well compilation leaves out dry holes, so the test requires operators to report hydrogen analyses from unsuccessful wells too.

8 · Engineering requirements

Established The wells are shallow by petroleum standards, and that is part of the case. Mali’s main reservoir is at about 100 m, the Nemaha Ridge well reached 1,695 m, and the second Lawson well’s transition into basement begins near 2,308 m. The cost models in 3 assume 400 to 500 m, or 1 to 3 km. Frontier Shallow, low-pressure wells are cheap to drill and cheap to abandon, which is why a rate of a hundred kilograms a day is not instantly fatal for a local user and is fatal for a commodity supplier.

Frontier Horizontal drilling is the obvious lever and, on the only model published, a weak one. Ramsay’s 500 m horizontal is modelled at 112 kg a day against 100 for a vertical development well. Speculative If that holds, the shale playbook of multiplying contact area does not transfer, and the engineering effort moves from the wellbore to the reservoir’s supply.

Established Surface plant is a separation and compression train sized by total gas. Pressure-swing adsorption and membranes are the standard options; the 2025 cost model compares four separation techniques and finds the fastest value growth with pressure-swing adsorption in its 1.8 billion m³ case. Compression to 300 bars and above is the Mali operator’s stated plan for transport, with liquefaction excluded on energy cost. Helium recovery, where helium is a few per cent of the stream, adds a further separation stage whose economics depend on helium prices rather than hydrogen’s.

Established Detection and monitoring have hydrogen-specific tools. The Mali study identifies the neutron log as the best downhole detector of free hydrogen after gas logging, and an ARPA-E project at the Colorado School of Mines is building real-time geophysical monitoring of the mineral changes that release hydrogen during stimulation. Frontier Neither is yet standard practice for an exploration well, which is one reason the published record is dominated by mud-gas readings.

Frontier Stimulation imports the geothermal and shale completion toolkit, with its risks. The Geothermal Megaprojects brief records that toolkit producing a 37-fold gain in geothermal flow and treats induced seismicity as its governance problem. The stimulated-hydrogen version adds reactive chemistry: injection at 200 to 300 °C for best yield, catalysts, acidified water and electrical pulses. One of the 18 ARPA-E projects addresses induced seismicity and hydrogen leakage together. Speculative The Texas A&M model’s pairing of hydrogen with heat extraction, using the produced heat to power the operation, is a sensible way to share the cost of a deep, hot reservoir, and it is untested.

9 · Adjacent technologies

Established Helium is the closest neighbour and may be the senior partner. Helium at 3 to 20% appears in a number of hydrogen projects, Lawson’s core averaged 4.4%, and the Australian explorer is booking helium first. Frontier Any assessment of a hydrogen well that omits the helium revenue understates it, and any that rests on helium is a helium assessment.

Established Geothermal shares the drill, the fracture and the heat. Stimulated hydrogen uses the completion methods examined in Geothermal Megaprojects, at similar temperatures, and the 2026 Stanford workshop paper models the two as one operation. Speculative A geothermal developer with hot ultramafic rock is the most natural first operator of a stimulated-hydrogen pilot.

Established Carbon mineralisation uses the same rocks and the same family of reactions. One ARPA-E project uses carbon dioxide to deliver reactants and recover hydrogen, and Koloma’s own method injects carbon dioxide-charged water to etch iron-bearing rock, which places stimulated hydrogen next to the carbon mineralisation discussed in Carbon Capture at Scale. Speculative A single injection that stores carbon and releases hydrogen would join two subsidy cases, and would also join two verification problems.

Established Ammonia, methanol and steel are where the hydrogen would go. The industrial users examined in Zero Carbon Industrial Systems are the buyers a local resource can reach; the Australian plan is methanol, and a company estimate shown in the federal webinar puts geologic ammonia at about $200 per tonne (company’s own estimate). Frontier Because transport is costly, geologic hydrogen competes for the plant built on top of it, not for the hydrogen market as a whole.

Frontier Mining and underground storage are adjacent through the subsurface itself. The record natural flux was measured in a working chromite mine, and ARPA-E selected a project on processing iron ore tailings for award negotiation. One ARPA-E project would use subsurface iron-redox chemistry as a long-duration battery, relevant to Energy Storage Revolutions. Speculative Seal knowledge gained for natural accumulations would transfer directly to engineered underground hydrogen storage, and the reverse.

10 · Institutional requirements

Established The public science base is thin and, on the record, thinning. The federal survey’s two products were written by the same small group, and its publication page lists both lead authors, Gelman and Ellis, as former employees. The programme page announces no national resource assessment and says quantitative assessment is not currently possible. A joint industry programme with the Colorado School of Mines began on 26 February 2024. Frontier The agency that produced the subject’s best-known number has not announced the work that would replace it with an assessed one.

Established Public research money is a twentieth of private money. ARPA-E’s geologic hydrogen project list sums to about $22.8 million against over $500 million of venture investment. Frontier Public money buys published results; private money buys options on unpublished ones. With the ratio at about one to twenty, the decisive data in 7 will be released when investors choose, unless a regulator or a funder requires otherwise.

Frontier Disclosure is governed by securities venues, not by geology. The Saskatchewan release carries its exchange’s disclaimer of responsibility for its accuracy and discloses paid promotion; the Australian explorer reports through quarterly exchange filings; the best-funded United States explorer is private. Speculative A condition attached to public grants or tenure, requiring flow tests to report rate, pressure and composition over a fixed period, would create the dataset the subject lacks at almost no public cost.

Established Tenure law is moving, country by country. France brought natural hydrogen under its mining code in April 2022 and restricted associated methane to on-site use. Germany made hydrogen and helium free-to-mine minerals under an act enacted on 1 April 2026; the German academies’ paper describes a Tellus Energy Solutions pilot in northern Bavaria aiming for a commercial proof of concept by 2030. Hydrogen Economies records South Australia. In Canada, one explorer reports about 1.3 million acres under permit in Saskatchewan and 5.7 million under application, and another has drilled pilot wells in Quebec. Frontier No Canadian federal counterpart to the United States survey’s products appears in the record this brief examined.

Frontier Certification decides whether the low carbon intensity counts. The German academies recommend making natural hydrogen certifiable so that it can count toward decarbonisation quotas. Speculative Until a certification scheme names a measured fugitive-emissions requirement, a geologic producer’s carbon intensity will be a modelled figure, and the French rule on associated methane is the only instrument in the record that addresses co-production directly.

11 · Ethical & societal considerations

Established The deep biosphere is a stakeholder that cannot object. The team that measured the Albanian flux warns that these environments host a fragile deep biosphere that depends on hydrogen as an energy source. Frontier Producing hydrogen from a system that microbes have used for millions of years is an intervention in an ecosystem nobody has surveyed, and the consumption measurement asked for in 7 is also the first survey of it.

Established Hydrogen in confined spaces explodes. The Bulqizë mine has suffered three major gas explosions, the most recent in 2023. Frontier Natural accumulations near the surface, in mines, tunnels or water wells, are a safety question before they are an energy question, and the discovery history of the subject, a water well in Mali and a chromite mine in Albania, is a history of accidental encounters.

Frontier Retail investors are being sold a resource that has not been measured. One field researcher calls the sector “kind of a Wild West — with lots of overstatements.” The Saskatchewan discovery release discloses more than US$440,000 of paid promotion alongside a hydrogen result with no flow rate. Speculative Concentration figures reported without method, readings without units and resource claims without flow tests are the material a promotional campaign needs, and the disclosure standard proposed in 10 is also an investor-protection measure.

Frontier Stimulation puts injected fluids into aquifers and stress into faults. Hot, acidified or catalyst-laden water injected into fractured ultramafic rock raises the groundwater and induced-seismicity questions familiar from geothermal stimulation. Speculative One project in eighteen addresses seismicity and leakage, a smaller share of the research portfolio than the share of public concern these issues attract when a project reaches a community.

Speculative Who benefits from the only producing field is already a live question. Bourakebougou powers a village; a 2022 account reports its operator’s intention to compress the gas for transport to a port and a market. Speculative A resource whose first use was local and whose next proposed use is export is the ordinary pattern of extractive industry, and the subject’s clean-energy framing does not exempt it.

12 · Civilizational implications

Speculative If the resource is a flow, hydrogen becomes an extractive industry with its own geography. The prospective places are cratons, ophiolites and rifts: Mali, South Australia, Kansas and the midcontinent, Saskatchewan, Oman, Albania and Lorraine. Speculative That map overlaps only partly with the map of oil and gas, so a successful geologic hydrogen industry would redistribute energy rents toward countries and provinces that have rock and lack hydrocarbons.

Established If it is a stock, it is a non-renewable mineral resource like any other. The team that measured the largest natural flux says geologic hydrogen is not renewable on human timescales. Frontier In that case the subject is about recoverable accumulations of finite size, judged by the same reserve arithmetic as gas, and the federal inventory’s headline matters only through the recoverable fraction nobody has estimated.

Frontier The base case on the present evidence is a local fuel and a helium co-product. One producing field at about 50 tonnes a year, one appraisal at a modelled 36.5 tonnes a year per well, and a record flux of 200 tonnes describe a resource that can run a village, a methanol plant or a helium plant, not a national hydrogen supply. Frontier That is a real use and a small one, and it would not change the global hydrogen balance described in Hydrogen Economies.

Handwave The civilisational claim made for the subject rests on the federal inventory, and the inventory cannot carry it. “Two hundred years of net-zero hydrogen demand” is an illustration of a 2% recovery of a most probable value from a seven-order-of-magnitude range, computed with a generation input twenty times the literature figure. Frontier It may prove an underestimate; the point is that no measurement now on record supports it in either direction, and a claim of that size requires the measurement before the rhetoric.

13 · Timelines

These horizons separate what a well, a filing or a statute has dated from what a company or a reviewer has projected; stated targets are given with the party that set them.

  • Already happened: Established One field, one record flux, two federal publications, two flow tests. Bourakebougou was found in 1987 and has produced since 2012. France recognised natural hydrogen in April 2022. The Bulqizë flux was published in February 2024; the federal global model in December 2024; the federal prospectivity map on 16 January 2025. Lawson was announced on 16 January 2026, Germany’s act was enacted on 1 April 2026, the Ramsay 3 flow test ran from 13 to 16 October 2026, and the Permian stimulation pilot was announced on 13 November 2026.
  • Next 12 months: Frontier Company-set dates, each of which would change a sentence here. Gold Hydrogen targeted a maiden helium contingent resource for November 2026, ahead of any hydrogen resource. Gold Hydrogen’s methanol feasibility study is due in the March quarter of 2027. HyTerra planned a production test in Kansas after the 2026 winter, and Max Power’s completions programme at Lawson has no stated date. Eden GeoPower said in August 2026 that a hydrogen pilot with a partner could start late in 2027.
  • 10 yr: Frontier The first multi-year flow records, or their continued absence. Tellus Energy Solutions’ pilot in northern Bavaria aims for a commercial proof of concept by 2030 (company’s target, as reported by the German academies). The intergovernmental review cited in Hydrogen Economies places initial production in the 2030s. By the end of this horizon either a second field has published a year of production or the subject has had a decade of drilling without one, and either outcome is informative.
  • 25 yr: Speculative Scale, if it comes, comes from stimulation or from a rate nobody has seen. The same review judges large-scale deployment unlikely before the 2040s. If natural wells stay near 100 kg a day, scale requires stimulated production with a decline curve nobody has yet measured.
  • 50 yr: Speculative A mineral industry located by ultramafic geology, with helium as a standard co-product, if the flow or the stimulation case holds; otherwise a set of local fuel and helium operations on a few cratons.
  • 100 / 250+ yr: Handwave The two-hundred-year illustration. Whether the crust holds enough recoverable hydrogen to supply a net-zero economy for two centuries is the claim the subject is sold on, and on present evidence it is not a forecast but a scenario computed from an unmeasured consumption rate.

14 · Technology tree & dependencies

  • Depends on Nothing on this map blocks the decisive test, which needs only a well and a commitment to publish. The case for producing is set by the demand ceiling and the stock-versus-flow framing in Hydrogen Economies; stimulation borrows the completion toolkit assessed in Geothermal Megaprojects; and the carbon dioxide-driven variants share chemistry and verification problems with Carbon Capture at Scale.
  • Requires (not on this map) A dedicated well outside Mali that produces for a year and publishes rate, pressure and composition. A measurement at Bourakebougou that separates exsolution of dissolved gas from live generation. A field measurement of how fast microbes and minerals consume a trapped accumulation. A reporting standard that says what a hydrogen flow test must disclose and for how long. Wellhead separation that is economic for streams in which nitrogen is the majority gas. And tenure law naming hydrogen and helium as licensable substances wherever the rock is prospective.
  • Enables A low-carbon feedstock under the willingness-to-pay ceiling for an ammonia, methanol or power plant built on top of the resource; a helium supply outside the existing producers; and, only if the decisive test succeeds at an order of magnitude above Mali, a supply option that would change the Hydrogen Economies assessment rather than sit beside it.
  • Adjacent Zero Carbon Industrial Systems for the users; Energy Storage Revolutions for underground hydrogen storage and iron-redox storage; Geothermal Megaprojects for the shared heat and drilling.

15 · Common misconceptions & speculative claims

Frontier “The USGS found enough hydrogen for two hundred years.” The federal model’s abstract says a small fraction of its most probable in-place value, for example 105 Mt, would supply projected net-zero demand for about 200 years. Established That fraction is illustrative, the in-place value spans 103 to 1010 Mt, and the authors say most of the hydrogen is likely impractical to recover. Frontier The two hundred years is a scenario, not a finding.

Established “The 2025 USGS assessment estimated the United States resource.” The 2025 publication is a prospectivity map of relative chances from 0.15 to 0.85, and it states that no volumes are known. The tonnages in circulation come from the separate December 2024 global model, which has no geography. The agency’s own programme page says quantitative assessment is not currently possible.

Established “Natural hydrogen is renewable.” The team that measured the largest natural flux on record says it is not, because production is far too slow for global energy needs. Frontier Whether any individual field is replenished on a production timescale is the open question of 4, and the one producing field does not yet answer it.

Frontier “Mali proves self-replenishment.” Mali proves that pressure has not fallen in eleven years at about 50 tonnes a year. The paper that reports it also describes a dissolved inventory degassing into the producing reservoir and says the residence time of hydrogen is unknown. Speculative A large dissolved stock would produce the same record for many years before declining.

Established “A 97% result is a discovery.” Concentration is not rate. Ramsay’s 97% is an air-corrected drilling sample; Lawson’s 28.6% is a core-tube sample, its flow test gave 16.8 to 19.1%, and the well then produced brine. Frontier A discovery in the resource sense is a sustained rate, and only Ramsay outside Mali has published a flow-based one, at about 100 kg a day.

Frontier “Geologic hydrogen costs under a dollar a kilogram.” Published estimates run from $0.14 to $6.82, the low end from a model that specifies an accumulation volume and a well count rather than a measured rate. Established No produced cost exists. A trade analyst’s summary, that every cost claim is self-reported and pre-field-validation, is the accurate one.

Established “Mali produces only five tonnes a year.” An August 2025 policy explainer by the Clean Air Task Force says Mali’s production is limited to five tonnes a year. The primary paper’s 1,500 m³ a day is about 49 tonnes, the German academies give about 50, and the Australian explorer cites about 125 kg a day. Frontier The error runs in the unusual direction, understating the one producing field by a factor of ten, and it matters because it is the yardstick every appraisal is measured against.

Speculative “Stimulation solves the flow-rate problem.” It may. The only published field-scale stimulated rates are model extrapolations from a 13-day laboratory record, and their opening values, 532 to 2,661 m³ a day, bracket Mali’s. Frontier The field injections in Oman and the Permian have reported hydrogen without reporting kilograms.

Frontier “Stimulated hydrogen is already being sold through pipelines.” The Permian pilot did gather hydrogen through existing gas infrastructure into a sales stream, over 30 days, in an oil reservoir, with no volume disclosed (vendor). Speculative That demonstrates handling, not a resource, and it does not say whether the hydrogen came from rock or from oil.

Handwave “Half a billion dollars would not go into the ground without something there.” Investment is a forecast by investors, not a measurement of rock. Frontier The best-funded explorer has disclosed no flow datum, and the subject’s most cited caution comes from the federal geologist who built its most cited number: “It’s impossible to say today whether this will be commercially viable.”