A brief is revised on its review clock or when an evidence trigger fires. The world does not wait for either: a law passes, a regulator issues a rule, a trial reports, a schedule slips. Each entry below records one such change, with the sources it rests on, against the briefs it affects, and says whether those briefs have been revised to reflect it. The same entries appear at the top of each affected brief, so a reader sees what has moved before reading text that predates it.

This page records changes in the evidence. Changes to the site itself, release by release, are in Assessment Changes. Dated events the briefs say are still to come are on the Watchlist. Newest first.

Advanced Air Mobility: whose noise figure it was, and Dubai’s finished vertiports

23 November 2026 · Correction · Established · Incorporated in the brief

Advanced Air Mobility attributed to NASA the figure of 45.2 A-weighted decibels for Joby’s prototype flying over at 500 metres and 100 knots in 2021. Joby’s release of 10 May 2022 says NASA processed the microphone data and Joby then applied standard corrections for spherical spreading and atmospheric attenuation to reach 45.2. Only the take-off and landing figure, below 65 decibels at 100 metres, is attributed to NASA’s engineers. The brief now says so wherever it uses the number.

The brief also said it could not confirm that a Dubai vertiport had been completed. Gulf News reported on 18 November 2026 that the vertiport near Dubai International Airport and a second at Dubai Marina were complete and certified, the Marina site by the UAE’s General Civil Aviation Authority, and that commercial passenger services had not begun.

Affects: Advanced Air Mobility

Advanced Fission now records the Army’s statement on tactical reactors

23 November 2026 · Correction · Established · Incorporated in the brief

The brief counts forward military bases among the three microreactor applications that compete against diesel, without saying that the military buyer has stepped back from that use. In October 2025 the Army’s principal deputy assistant secretary for installations, energy and environment said the Army does not at this time see nuclear power as a tactical application, and its Janus programme buys reactors for domestic installations. The position section now records the statement and points to Microreactors and Process Heat; its comparison with diesel is unchanged.

Affects: Advanced Fission

AI-Assisted Governance: what the April 2026 compliance deadline has produced so far

23 November 2026 · Correction · Established · Incorporated in the brief

AI-Assisted Governance named three quantities that decide what the April 2026 deadline for high-impact federal AI systems meant: how many systems were declared high-impact, how many minimum practices were waived, and how many systems were switched off. It said none had been published. The first has been: the 2025 federal inventory, released in April 2026, designates 445 of 3,611 use cases high-impact. The other two exist only in part. FedScoop asked 28 agencies in the week after the deadline; several reported high-impact uses retired, paused or rolled back, and the one waiver it found covered a use case not designated high-impact. No government-wide count of waivers or retirements has been found. Public-Sector AI Assurance carries the agency-by-agency record.

Affects: AI-Assisted Governance

Focused ultrasound converges more than 1,000 sources, not several hundred

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said magnetic-resonance-guided focused ultrasound converges several hundred beams through the skull. Rezai and colleagues, reporting their 2024 Alzheimer’s study in the New England Journal of Medicine, describe the clinical system as a hemispherical phased-array transducer with more than 1,000 ultrasound sources. The brief now says so; nothing else in its account of the platform changes.

Affects: Bioelectric Medicine

Climeworks’ Iceland totals, job cuts and funding corrected in Carbon Capture at Scale

23 November 2026 · Correction · Established · Incorporated in the brief

Four statements about Climeworks were wrong or out of date.

  • The brief said Orca had captured just over 2,400 tonnes since 2021. Heimildin gives that figure, as “carbon units”, for all of Climeworks’ operations in Iceland, not Orca alone, and its 1,000-tonne best year is also for Iceland as a whole. Bloomberg reported in May 2025 that Orca by itself has never captured more than 1,000 tonnes in a year, and the brief now cites that. The reading-list note on Heimildin also gave ten months for the window in which Climeworks captured 876 tonnes; it is eleven, December 2023 to October 2024.
  • The brief said the company cut “a quarter” of its workforce, and in one place put the cut between the October 2025 hub terminations and the April 2026 restoration. It cut 106 of 483 staff, 22% on Bloomberg’s count, in May 2025, five months before the terminations.
  • “Approximately $800 million” raised was the May 2025 figure. The company says its $162 million round in July 2025 took its funding since inception to over $1 billion.
  • Mammoth’s “roughly 0.3% of design” in its first ten months rests on the 105 tonnes Heimildin took from registry information. Swissinfo reported the company’s own figure for the same months as 750 tonnes, about 2% of design. The brief now gives both.

Affects: Carbon Capture at Scale

Climeworks’ Iceland totals and Canada’s removal purchasing corrected in Carbon Removal Verification

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said Heimildin’s 2025 investigation found that Orca had captured just over 2,400 tonnes since 2021. Heimildin gives that figure, as “carbon units”, for all of Climeworks’ operations in Iceland, not for Orca alone. The brief also set Climeworks’ corporate emissions against 876 tonnes captured over ten months; Heimildin dates that capture from 1 December 2023 to 31 October 2024, eleven months. The position section and the reading-list note now say both.

The brief’s account of Canada stopped at the federal call for bids. It now adds that in June 2026 Deep Sky delivered direct-air-capture credits from Alberta to Microsoft and the Royal Bank of Canada, verified by Isometric, and that in November 2026 the Treasury Board named 19 standing offers under the federal programme, two of them for Deep Sky’s projects in Alberta and Quebec. A standing offer commits no purchase.

Affects: Carbon Removal Verification

Digital Citizenship: payment-rail counterfactuals, and the Pix trade case decided

23 November 2026 · Correction · Established · Incorporated in the brief

Digital Citizenship said that neither India’s UPI nor Brazil’s Pix has a counterfactual. Neither was randomised, but economists have built quasi-experimental counterfactuals from uneven exposure. Alok, Ghosh, Kulkarni and Puri (NBER Working Paper 33259) compare Indian pincodes by their March 2016 share of deposits at banks that adopted UPI early; Burga, Cespedes, Parra and Ricca (arXiv:2608.13871) compare Brazilian municipalities by their mobile penetration before Pix. The brief now names both. It keeps its point that no study yet tests whether the gain comes from replacing the payment channel.

The brief also called the United States trade investigation of Brazil’s payment practices an initiation, not a finding. On 1 June 2026 the US Trade Representative published a determination finding Brazil’s preferential treatment of Pix unfair and discriminatory, and a 25% tariff on a wide range of Brazilian goods took effect on 22 July 2026. Digital Public Infrastructure carries the case and the quasi-experimental record in full.

Affects: Digital Citizenship

The authorship of the reconductoring analysis corrected in Energy Corridors

23 November 2026 · Correction · Established · Incorporated in the brief

The brief attributed the 2024 analysis arguing that reconductoring existing lines could supply much of the transfer capability the United States needs, faster and more cheaply than new lines, to Lawrence Berkeley National Laboratory with GridLab. Its authors are at the University of California, Berkeley’s Goldman School of Public Policy and at GridLab; no national laboratory is among their affiliations. The position section and the reading-list entry now say so.

Affects: Energy Corridors

Willow Rock’s licence date, schedule and site work corrected in Energy Storage Revolutions

23 November 2026 · Correction · Established · Incorporated in the brief

Three statements about Hydrostor’s Willow Rock compressed-air project were wrong or out of date.

  • The California Energy Commission approved the project on 19 December 2025, not 20 December, as its notice of determination and a San Francisco resolution of April 2026 record.
  • The brief gave commercial operation as about July 2029 after a thirteen-month slip. Its source gives June 2028 as the original date, an 18-month extension in December 2023 and then a request for thirteen more months, and states no resulting date. The San Francisco resolution expects commercial operation on 1 July 2030.
  • The brief said it could not confirm the groundbreaking planned for mid-2026. The company said in August 2026 that on-site work began in July, while still describing breaking ground and financial close as due later in the year; its statements to 12 November 2026 announce no close.

Affects: Energy Storage Revolutions

Fault-Tolerant Quantum Computing gave an unsourced photonic loss figure as a measurement

23 November 2026 · Correction · Established · Incorporated in the brief

Fault-Tolerant Quantum Computing presented 78 to 82 per cent as the measured optical-path transmission of Xanadu’s photonic system, against the more than 99.5 per cent needed for fault tolerance. The figure comes from a January 2026 review (arXiv:2601.16484), which calls it current but ties it to no measurement. The measurement in Xanadu’s own Nature paper on its Aurora machine is far worse: losses of slightly over 95 per cent on the heralded optical paths, against loss budgets of about 1 per cent. The brief now attributes the 78 to 82 per cent to the review and gives the Aurora figure as the measurement.

The brief also records that in October 2026 Xanadu announced provisional approval for up to US$10 million, as a one-year contract extension building on its Stage B work in DARPA’s Quantum Benchmarking Initiative. The announcement does not describe it as a move to Stage C.

Affects: Fault-Tolerant Quantum Computing

The seaweed steer trial’s 80 per cent, and the UC Davis lifecycle study’s peer review

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said Roque and colleagues reported methane reductions of over 80 per cent in beef steers across their 21-week trial of red seaweed. Across the trial, methane yield fell 45 per cent at the lower dose and 68 per cent at the higher; the 80 per cent in the paper’s title applies only to the higher dose on the low-forage diet. The brief now gives the trial-wide figures.

The brief also described the UC Davis lifecycle assessment of cultured meat as a preprint. It was published after peer review in ACS Food Science & Technology (volume 5, pages 61–74) in December 2024. It remains contested, and the brief’s argument about media purity is unchanged.

Affects: Future Agriculture

Fervo’s flotation proceeds and a broken link corrected in Geothermal Megaprojects

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said Fervo raised $1.89 billion in its May 2026 flotation. That is the offering before the underwriters’ option. The company’s quarterly filing gives 80.5 million shares sold at $27, including 10.5 million on the option’s full exercise, for gross proceeds of about $2.2 billion. The position and timeline sections and the reading-list note now give that figure.

The link given for ThinkGeoEnergy’s 10 November 2026 report on Fervo’s pipeline led to the publication’s front page, not the report. The entry is now cited by title and date without a link.

Affects: Geothermal Megaprojects

Gravitational Wave Engineering overstated the Einstein Telescope’s null stream

23 November 2026 · Correction · Established · Incorporated in the brief

Gravitational Wave Engineering described the null stream of the Einstein Telescope’s triangular design, a combination of its arms that cancels gravitational waves and leaves the instrument’s own noise, as established and as “the only self-calibrating noise monitor the field has”. No detector with a null stream has been built. Physics World reported in September 2025 that such a detector has not yet been realised and that it is not clear the null stream would be a fundamental advantage for data analysis. The brief now presents the null stream as an undemonstrated property of the design, flagged frontier rather than established. Next-Generation Gravitational-Wave Observatories sets out the case for and against the triangle.

Affects: Gravitational Wave Engineering

Gravity Modification had the short-range gravity bound the wrong way round

23 November 2026 · Correction · Established · Incorporated in the brief

Gravity Modification said that the 2020 Eöt-Wash torsion-balance experiment excluded gravitational-strength Yukawa interactions at ranges below 38.6 micrometres. The bound runs the other way. Lee, Adelberger, Cook, Fleischer and Heckel, in Physical Review Letters, limit any gravitational-strength Yukawa interaction, at 95% confidence, to ranges below 38.6 micrometres: a force as strong as gravity is excluded at every longer range, and the experiment does not exclude one at shorter ranges. The dissertation behind the paper states the same result as an exclusion for length scales above 39 micrometres.

The brief now gives the direction correctly in its position, experiments, frontier and upside sections and in its reading-list note on the paper. Its statements that a deviation below 38.6 micrometres would be a discovery, and that the next generation of balances is pushing below that range, already matched the corrected reading and are unchanged. Tabletop Tests of Gravity carries the full short-range record.

Affects: Gravity Modification

The source of the geologic-hydrogen figures corrected in Hydrogen Economies

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said the federal assessment behind the best-known geologic-hydrogen figures, the US Geological Survey’s Professional Paper 1900, estimates hydrogen generated and retained over geological time, says most of it is inaccessible and gives no recoverable fraction. Professional Paper 1900 is a prospectivity map of the conterminous United States and estimates no volumes. The figures, including the comparison with all proven natural-gas reserves, come from a modelling paper by two of the survey’s geologists, Ellis and Gelman, who note that much of the hydrogen is likely too deep, too far offshore or in accumulations too small to recover. The position section and the reading-list entry now say so.

Affects: Hydrogen Economies

The hypoimmune islet case is peer-reviewed

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said the single-patient hypoimmune islet transplant, performed in 2025 without immunosuppression, had no peer-reviewed report as of November 2026. It has one. Carlsson and colleagues reported the case through 12 weeks as a brief report in the New England Journal of Medicine (393:887), published online on 4 August 2025, and a 14-month follow-up appeared in the same journal in 2026. The case is still a single patient with no independent replication, and the brief’s reading of it is otherwise unchanged.

Affects: Lab-Grown Organs

Multi-Messenger Astronomy now gives both accounts of the LISA telescope contract’s phases

23 November 2026 · Correction · Established · Incorporated in the brief

Multi-Messenger Astronomy said that the €26.1 million first-phase contract the European Space Agency awarded on 5 May 2026 for LISA’s telescopes was structured in four phases with a decision point at each. That is how trade reporting describes the agency’s plan. The contractor’s own release, issued by Thales Alenia Space the same day, says the development is expected to proceed in three phases. The brief now gives both accounts and says whose each is. The agency’s own statement of the phases has not been found, and it would settle which count is right.

Affects: Multi-Messenger Astronomy

MASAI: the interim figures and the final result

23 November 2026 · Correction · Established · Incorporated in the brief

The brief gave the Swedish MASAI mammography trial’s results as about 20 per cent more cancers detected across roughly 80,000 women, with screen-reading workload down about 44 per cent, without saying that these were the 2023 interim figures. Across the full trial of about 106,000 women, Lund University reports 29 per cent more cancers detected without more false positives and the same 44 per cent workload reduction. The final analysis, published in The Lancet in 2026, found the interval-cancer rate with AI-supported screening non-inferior to standard double reading, with a proportion ratio of 0.88 (95 per cent CI 0.65 to 1.18), higher sensitivity and equal specificity. The brief now labels the interim figures and adds the final result.

Affects: Precision Medicine

Who wrote the dark-oxygen critiques, the Hachinohe furnace rating, and The Metals Company’s new permit timetable

23 November 2026 · Correction · Established · Incorporated in the brief

The brief said company staff wrote at least two of the three critiques of the 2024 dark-oxygen paper. They are authors of all three: the December 2025 opinion article in Frontiers in Marine Science lists six current or former employees of The Metals Company among its 13 authors. The brief also said that article called for retraction. It does not; one of its co-authors, Per Hall, told Live Science in March 2026 that he hopes the journal retracts the paper.

The brief gave the Hachinohe smelting furnace as 3,000 kVA, the figure in the company’s February 2025 announcement. The company’s August 2025 technical report gives 4,000 kVA. The brief now gives both.

The brief said the company expected the United States permitting process to conclude before the end of the first quarter of 2027, and described the first production system as a 3.0-million-tonne-a-year system. In its update of 12 November 2026 the company reported that NOAA expects to decide on certification by mid-December 2026, and said it expects the commercial recovery permit before its targeted fourth-quarter 2027 commissioning. The first system is now to start at about 1 million wet tonnes a year, possibly 1.5 million in its second year, with conversion to its 3.0-million-tonne nameplate in the third. The position, bottlenecks, engineering, experiments and timelines sections now say so.

Affects: Seabed Mineral Extraction

Study S-005 corrects four propulsion briefs

23 November 2026 · Correction · Established · Incorporated in the brief

Writing Study S-005, Propellantless Propulsion, against the Institute’s propulsion briefs found four passages to correct. Pathological Science quoted the 2021 Dresden EmDrive result as refuting all claims “by at least 3 orders of magnitude”. That is the conference abstract’s wording; the peer-reviewed paper says at least two orders on Shawyer’s own equation, and bounds the thrust below a photon rocket’s. Reactionless Propulsion called the 2016 Eagleworks figure about 500 times smaller than Shawyer’s patent figure; on the brief’s own numbers the factor is about 270. Electrodynamic Propulsion Concepts said the Hall-thruster benchmark sits four orders of magnitude above the Mach-effect claims; on the Mach Effect Thrusters brief’s own range it is two to three.

Mach Effect Thrusters said the magnitude of Woodward’s mass-fluctuation term had never been independently derived. A revised preprint of 28 October 2026 from the Space Studies Institute now derives it and finds that the claimed force does not follow under its stated hypotheses. It has not been refereed, and the brief says so.

Affects: Pathological Science, Reactionless Propulsion, Electrodynamic Propulsion Concepts, Mach Effect Thrusters

Autonomous weapons: the Review Conference extends talks to 2028 without a negotiating mandate

21 November 2026 · Result · Established · Incorporated in the brief

The Seventh Review Conference of the Convention on Certain Conventional Weapons closed in Geneva on 21 November 2026, a day after its scheduled end, without a mandate to negotiate on lethal autonomous weapons systems. By consensus, states agreed to extend the discussions for two more years and to “elaborate” a possible accord by 2028, without committing to binding rules, according to the Associated Press. A proposal among the Conference’s documents had provided for the expert group to “negotiate a new Protocol”. Seven states (Austria, Belgium, Brazil, Ireland, Mexico, New Zealand and Panama) proposed launching negotiations, and that effort fell short. Activists blamed Russia and the United States for blocking stronger language. The Stop Killer Robots campaign, an interested party, called the outcome a “watered-down mandate”, while the UN’s high representative for disarmament called it a “significant achievement”.

Military AI and Strategic Stability named this as its decisive near-term result. Of the three outcomes it distinguished in advance, this is the second: consensus on further discussion without negotiation, now with a 2028 date. Existential Risk Governance records the outcome as a further instance of its finding about consensus forums: a General Assembly committee majority of 163 for negotiating, and a Geneva result that sets a timetable rather than opening a negotiation. Autonomous Weapon Swarms asked whether any mandate addresses weapons operating as a group. No account of the decision read for the brief says that it does. Each brief’s pending sentences now carry the outcome with its date.

Still open: the decision’s own text, which none of the accounts quotes, so its meeting days and any wording on weapons operating as a group are not established here; which delegations held the line, which rests so far on activists’ accounts; whether elaboration becomes negotiation before 2028; and whether any state takes the routes outside the forum.

Affects: Military AI and Strategic Stability, Autonomous Weapon Swarms, Existential Risk Governance

California’s training-data disclosure law argued in the Ninth Circuit; no ruling yet

18 November 2026 · Schedule · Established · Incorporated in the brief

On 18 November 2026, the date Synthetic Data and Training Provenance carried, a three-judge Ninth Circuit panel in San Francisco heard xAI’s appeal in x.AI LLC v. Bonta, No. 26-1591. xAI is appealing the district court’s refusal in March 2026 to block AB 2013, California’s law requiring developers of generative systems to post summaries of their training data. xAI argues that the law compels speech in breach of the First Amendment and exposes trade secrets. The panel did not rule at the hearing, and no ruling had been reported by 22 November 2026. Two legal-press accounts of the argument describe the panel as sceptical of parts of xAI’s challenge.

AB 2013 is one of the brief’s two running experiments in mandated training-data transparency, and the ruling decides whether that experiment continues in its current form. The brief now records that the appeal was argued and is awaiting a ruling, where it previously gave the argument as scheduled. Its assessment does not move until the court rules.

Still open: the panel’s decision, which has no scheduled date, and whether either side then seeks further review.

Affects: Synthetic Data and Training Provenance

The Federal Reserve’s productivity and jobs task force holds its first session

16 November 2026 · Schedule · Established · Incorporated in the brief

On 16 November 2026 the Federal Reserve’s task force on productivity and jobs held its first public session, a conference hosted by the Board and the Federal Reserve Bank of San Francisco. It went ahead on the date AI-Driven Productivity carried. Chair Kevin Warsh opened it and moderated three of the four discussion sessions. In his opening remarks he set out three “illustrative scenarios, not forecasts”: productivity gains that are broadly shared, an expansion with substantial labour-market disruption, and disappointment. He asked: “Will this new technology deliver a rise in total factor productivity?” The task force is led by Marc Andreessen, Charles Jones, who is on leave at Anthropic, and Asha Sharma of Microsoft.

The brief’s finding is that the central bank has become an actor in the AI-productivity question before the measurement exists. That finding stands. The chair framed a supply effect as one scenario among three and named total factor productivity as the open question, which is the measurement the brief says is missing. The brief now records that the session was held, with its date and his framing, where it previously said it was scheduled.

Still open: whether the task force publishes findings or a schedule of further sessions. The revised third-quarter productivity release, which the brief carries for 8 December 2026, is the next dated measurement.

Affects: AI Driven Productivity

Four briefs still carried the record Space Habitats had just corrected

15 November 2026 · Correction · Established · Incorporated in the brief

The review of Space Habitats moved the record for a crewed closed ecology from BIOS-3’s six months to the 370 days Lunar Palace’s operators report, and the best food closure from 60% over a year to 73% over 370 days. Mars Colonization and O’Neill Cylinders still carried the old figures, in sixteen places between them, and Multi-Planetary Civilization listed three human closure records and left out the longest. Synthetic Ecosystems had carried the 370-day run since before this release, so two of these briefs had been contradicting a third for some time. Each passage now gives the operators’ figure, says whose figure it is and that nobody else has verified it, and points to Space Habitats; where Mars Colonization’s closure ladder quotes a percentage for BIOS-3, it now says that the percentage is the compiler’s, since the facility’s own directors never gave one. O’Neill Cylinders also counted twelve Starship flights; it now gives fourteen by 28 September 2026.

The review of Mind Uploading found that Neurogenetics described the 2025 loss of federal support for connectome programmes and stopped there; it now records that a court ruled the freeze illegal in September 2025.

The Mars Colonization and O’Neill Cylinders passages were reported twice: by the reviewer, who read the sibling briefs as the review now requires, and by a check this release adds to every build, which compares what a revised brief stopped saying with what other briefs still say. Multi-Planetary Civilization was found by the check alone and Neurogenetics by the reviewer alone. Every correction in v1.2.0 was found by a reviewer; this is the first release in which the check found one a reviewer missed.

Affects: Mars Colonization, O'Neill Cylinders, Multi-Planetary Civilization, Neurogenetics

Corrections to twenty-three related briefs found during the third review pass

15 November 2026 · Correction · Established · Incorporated in the brief

Re-examining twenty-one briefs on 15 November 2026 turned up statements in twenty-three related briefs that were wrong or had gone out of date. Each was checked against a source that the revising brief had read before it was changed, and each corrected brief now links to the brief that owns the record.

  • High-Temperature Superconductors said SPARC’s first plasma had slipped once, to 2026. It has slipped twice, and is targeted for 2027.
  • Intelligence Measurement gave ARC-AGI-2 as a current floor at 2.4 to 3.0 per cent. The benchmark’s authors reported 54 per cent at $31 per task in January 2026.
  • Human-Machine Symbiosis said no enrolment, endpoint or result was available for Synchron’s US trial, and that the field has no shared benchmark. Six patients met its primary safety endpoint, reported at a neurosurgical congress in 2024, and a shared decoding benchmark closed in June 2024.
  • Neural Interfaces called fourteen people over twenty years the largest interventional dataset in existence. It is the largest published safety dataset; larger cohorts have since been implanted without publishing in comparable form.
  • Cognitive Liberty described the UNESCO neurotechnology instrument as a 2025 draft and said the brief could not cite the US state statutes. The Recommendation was adopted on 12 November 2025, and four states are named in a legal commentary of 30 March 2026.
  • Artificial General Intelligence and Collective Intelligence each said no compute-matched comparison of multi-agent against single-agent systems had been published, and the second added that pairwise error correlation had never been measured for a language-model ensemble. Budget-matched comparisons have appeared since December 2025, and error correlation has been measured across more than 350 models; the full control, and any measurement inside a working team of agents, are still missing.
  • Science of Science, Human Cognitive Augmentation and Intelligence Amplification each carried the 19 per cent developer slowdown as a standing fact. Its authors called it outdated for current tools on 24 February 2026, and their follow-up inconclusive.
  • AI Electricity Demand put gas-turbine lead times at three or four years. For heavy-frame turbines the largest maker was booking delivery in 2032.
  • Earth-System Digital Twins said no party other than the vendor had evaluated the Earth-2 models, and called the record-extremes study an unpublished preprint. An independent Norwegian team tested one of the models against weather stations in 2026, and the study appeared in a journal that year.
  • Nanomedicine credited Universal Vaccines with the platform’s population-scale manufacturing and safety record. That record belongs to the COVID-19 mRNA vaccines; no universal vaccine has been given at population scale, and the largest exposure is 12,400 people in a trial that failed.
  • Cellular Rejuvenation and Biological Immortality each called the within-person test of epigenetic clocks unfunded and unrun, and the first gave the human plasma-exchange evidence as eight uncontrolled patients. The clock test has been run once, in one cohort of 699 people, where change alone predicted death for two of seven clocks; a randomised, placebo-controlled plasma-exchange trial in 42 adults was published in 2025.
  • Existential Risk Governance dated the executive order rescinding the US gain-of-function policy to 4 May 2025. It was issued on 5 May 2025, the day before the policy it rescinded took effect.
  • Military AI and Strategic Stability said no independent count of what the Replicator programme fielded appears in its sources, without the programme’s own official’s statement that it fielded hundreds rather than thousands.
  • Xenobiology carried four statements about the mirror-life governance record that the new Mirror Life brief falsifies: that the December 2024 statement and its technical report could not be consulted, a single ten-to-thirty-year timing range where the report gives two scenarios, a funding constraint described as of 2025 and philanthropic alone, and the claim that nobody has proposed a detection programme. One was proposed in October 2026. The brief’s three biology-level statements on nutrition, immune evasion and the ribosome bottleneck are left as they stand.
  • Genetic Engineering, Neurogenetics and Human Adaptation for Space carried two claims the Precision Medicine re-run settled. Elevidys was linked to three deaths from acute liver failure in July 2025: there were two, in March and June 2025, both non-ambulatory patients, plus a third in a trial of a different product from the same sponsor; non-ambulatory dosing was suspended, the hold was lifted for ambulatory patients on 28 July 2025, and a boxed warning was added on 14 November 2025. And the clinical holds on Intellia’s nex-z, which two briefs described as unresolved, were lifted: the polyneuropathy trial restarted on 27 January 2026 and both by 14 May 2026, with enhanced liver monitoring.
  • Deep Space Infrastructure used Artemis III as the coming stress test for the Deep Space Network, in seven places, on the basis that it would fly two crewed vehicles in cislunar space. The programme was restructured on 27 February 2026: Artemis III became a crewed Earth-orbit docking flight targeted for mid-2027, and the first crewed landing moved to Artemis IV in 2028. The brief’s argument is unchanged and its date is two years later.
  • Space Law and Governance published a counting correction of its own — that the Artemis Accords had 70 signatories, against an encyclopaedia’s stale 61 — and had itself gone stale: Djibouti signed on 14 September 2026 and Côte d’Ivoire on 24 September as the 75th. The same brief and Lunar Industry disagree about the size of the rival grouping, seventeen-plus against thirteen; neither figure was re-checked, and the disagreement is now stated in the brief rather than left for a reader to find.

Affects: High Temperature Superconductors, Intelligence Measurement, Human-Machine Symbiosis, Neural Interfaces, Cognitive Liberty, Artificial General Intelligence, Collective Intelligence, Science of Science, Human Cognitive Augmentation, Intelligence Amplification, AI Electricity Demand, Earth-System Digital Twins, Nanomedicine, Cellular Rejuvenation, Biological Immortality, Existential Risk Governance, Military AI and Strategic Stability, Xenobiology, Genetic Engineering, Neurogenetics, Human Adaptation for Space, Deep Space Infrastructure, Space Law and Governance

The military-AI standard now binds two briefs, and both were audited against it

15 November 2026 · Review · Established · Incorporated in the brief

The Institute’s editorial standard for military AI and autonomous weapons was adopted on 15 September 2026 and bound one brief. A second, Autonomous Weapon Swarms, was published on 15 November 2026 and is bound by it too. Both were then read clause by clause against the standard’s four commitments by a reviewer who had not seen either being written, the day before the Seventh CCW Review Conference opened.

The audit found forty-one passages worth changing, of which seven were breaches as written. The pattern was not advocacy but drift: the briefs’ own voice taking on one side’s framing through the choice of a word, and flags on political claims outrunning the advocacy, campaign and newsletter sources the briefs’ own reading lists put lower. The most serious finding was a contradiction between the two briefs published the same day: one said, as established, that none of the human cost of drone warfare in Ukraine had been attributed to autonomous operation, while the other reported the first such attribution. Both now say the same thing. Every breach and nearly every lesser finding has been applied, and the audit at the foot of the standard page has been replaced by an account of what was found in both briefs, including what failed and the three corrections that were not made because they would have rested on facts neither brief’s reading list holds.

One structural fault is worth recording separately. Autonomous Weapon Swarms claimed in its own text to be bound by the standard, and its record did not carry the pointer that puts a link to the standard in a brief’s header, so the page did not show what the text asserted. It does now, and the gate that checks published standards against the briefs they bind covers it.

Affects: Military AI and Strategic Stability, Autonomous Weapon Swarms

November 2026 review, third pass: twenty-one briefs, and what the search limits cost

15 November 2026 · Review · Established · Incorporated in the brief

On 15 November 2026 the twenty-one briefs listed below were re-examined against current sources under the review policy. Nine were re-researched in full, eleven had every dated claim re-checked and revised where it had moved, and one, Military AI and Strategic Stability, was rewritten and then audited clause by clause against the editorial standard that binds it. Each now carries a review badge dated 15 November 2026, which restarts its clock.

Among the events now in the text: the expert group at the Convention on Certain Conventional Weapons adopted its final report on 4 September 2026 and the Seventh Review Conference sits on 16 to 20 November 2026, with its outcome pending as this edition closes; New START expired on 5 February 2026; the EU AI Act’s high-risk obligations were deferred to 2 December 2027 by a regulation in force since 27 July 2026, and the first harmonised standard under the Act was cited on 14 October 2026; the authors of the most-cited negative result on AI and developer productivity described it on 24 February 2026 as outdated for the tools then in use, and their follow-up as only very weak evidence; United States output per hour rose at a 3.6 per cent annual rate in the third quarter of 2026; a universal influenza candidate reported 24 per cent efficacy against a pre-specified 50 per cent on 21 October 2026; a European forecast system initialised from raw observations has run in real time since 3 November 2026; the largest gas-turbine maker was taking reservations for delivery in 2032; and SPARC’s first plasma has slipped a second time, to 2027.

What this pass could not do, recorded because it bears on how much the badges are worth. Three briefs — Lunar Industry, Precision Medicine and Advanced Battery Technologies — reached their research step after a shared search allowance had run out, and were re-opened later the same day to complete it. Three others were stopped by an automated safety check before anything was written: Cellular Rejuvenation, AI–Biology Governance and AI–Cyber Convergence. Those three carry their September 2026 text, carry no November badge, and have been set out for drafting outside the Institute’s own tooling, as three briefs were earlier this week. One of them may be wrong in its central claim: a United States policy on screening synthetic nucleic-acid orders, reported as dated November 2026, would falsify AI–Biology Governance’s statement that no such mandate exists. The Institute could not open the document, so nothing about it appears in that brief, and this paragraph is the only place the lead is recorded.

Affects: Military AI and Strategic Stability, AI Governance, Agentic Autonomy and Control, Synthetic Data and Training Provenance, Embodied AI and Robot Foundation Models, Content Authenticity Infrastructure, AI Driven Productivity, The Physical Stack of AI, AI Weather Prediction, Artificial General Intelligence, Brain-Computer Interfaces, Neural Interfaces, Artificial Scientists, Multi-Agent Intelligence Systems, Longevity Therapies, Universal Vaccines, Commercial Fusion, Existential Risk Governance, Lunar Industry, Precision Medicine, Advanced Battery Technologies

Mind Uploading and Space Habitats re-researched for the studies that rest on them

15 November 2026 · Review · Established · Incorporated in the brief

Studies S-003, on whole-brain emulation, and S-004, on closed-loop life support for voyages that cannot be resupplied, take their numbers from two briefs: Mind Uploading and Space Habitats. Both were given a full review on 15 November 2026 so that neither study is built on a September figure, and both now carry the review on their badges.

Mind Uploading. The complete male fruit-fly central nervous system, a preprint in October 2025, was published in September 2026; the brief now gives the published counts. Its proofreading figure for the largest mouse dataset was a floor rather than a total, and now says so. Its account of the 2025 freeze on connectomics funding stopped at an institutional bridge running to June 2026; a court ruled the freeze illegal that September, and federal award data list the larger grant as running to 2028. A fly brain model run in a simulated body in March 2026, presented by its developer as an upload, is recorded with what it did and did not validate.

Space Habitats. The brief had carried six months as the longest human closure ever run and 60% as the best food closure, both from a review. The operators of Beijing’s Lunar Palace report a crewed closed run of 370 days in 2017–18 at 73% of food by dry weight, and give 55%, not 60%, for the earlier 105-day run the review described; those are the operators’ own figures, which nobody else has verified, and the brief says so. The commercial-station procurement, the station leak, the Starship flight count and the first-module dates were brought up to November 2026.

Affects: Mind Uploading, Space Habitats

Studies S-003 and S-004 published, and what writing them corrected in five briefs

15 November 2026 · Schedule · Established · Incorporated in the brief

Studies S-003, Whole-Brain Emulation, and S-004, Closed-Loop Life Support for Multi-Generational Voyages, are published. S-003 was promised for Q4 2026 and is published inside it; S-004 was promised for 2027. The schedule note of the same day withdrew both dates and said the first of those quarters had passed with nothing written. It had not passed, and that sentence was wrong.

Study S-003 asks what an emulation of one particular individual would have to contain. Under stated assumptions it prices the acquisition — zettabytes for a human brain at today’s cubic-millimetre data densities — and finds the computational budgets in the literature seven orders of magnitude apart between two commonly cited fidelity levels, because nobody knows which level is sufficient. Its contribution is an acceptance test: an emulation must pick out its own original against other individuals and predict memories and trained associations it was never shown, a test that could establish fidelity to a person but not that the emulation is that person. Its finding is substantial engineering downstream of unresolved frontier research, with a scientific gap wherever the claim requires a recoverable state nobody has yet specified.

Study S-004 asks what a vessel that can never be resupplied would have to keep reproducing for two centuries. Its finding is that no system yet demonstrates the combined ecological, industrial, demographic and institutional independence such a voyage needs: known physics permits each function, but nothing shows a community maintaining all of them together without outside repair or rescue. It works through a two-hundred-year water account, the reasons published minimum populations run from under a hundred to tens of thousands, an energy account of about two hundred megawatts for a reference population of ten thousand, before propulsion, and the machine that would have to replace the machines.

Both studies were checked against the briefs they rest on, and the briefs were corrected where they said more than their sources. Mind Uploading no longer says that synaptic weights are absent from a scan by construction: in one cortical preparation synapse size tracks strength, which is some information if not a readout. Nor does it say that no behavioural test could tell a generic emulation from an individual one; a test built from what the individual learned could. Space Habitats now gives its 13 and 78 tonnes of shielding per person with the geometry they belong to, one person’s own hundred cubic metres, and the same paper’s much lower figures for shared habitats. It, Mars Colonization and Multi-Planetary Civilization no longer say food closure in flight is zero, which experimental crops contradict; they say no flown system has supplied a regenerative diet. And the primary investigation of Biosphere 2’s oxygen loss, read for S-004, gives the decline as 21% to 14%, where Multi-Planetary Civilization and Historical Space Colonization Concepts had carried a secondary 14.5%; both now give the primary figure and its cause, the soil’s microbes and the building’s concrete.

Affects: Mind Uploading, Space Habitats, Mars Colonization, Multi-Planetary Civilization, Historical Space Colonization Concepts

Study S-002 published four months late; the next two lose their dates

15 November 2026 · Schedule · Established · Incorporated in the brief

The studies page has carried three promises with dates on them since early 2026. S-002, Traversable Wormhole Engineering, was promised for Q3 2026 and is published today, four months after the quarter it was promised in. It assesses what general relativity requires of a throat a person could pass through, what quantum field theory permits, and the distance between the two, which it states as a ratio of about ten to the forty-first. Its finding is that no physical law prohibits a traversable wormhole and that this is nonetheless not an engineering problem: there is no formation mechanism, and what binds the proposition is a set of quantum-field-theory theorems rather than any limit of apparatus.

S-003, Whole-Brain Emulation, was promised for Q4 2026 and S-004, closed-loop life support for multi-generational voyages, for 2027. Both now show no date. The first of those quarters has passed with nothing written, and the Institute would rather say it has no date than publish one it has already missed once. Both remain commissioned, and both have a written specification. A reader who wants to know whether the Institute is keeping its schedule can now see that it did not keep this one.

The study sits on top of the six briefs listed below and replaces none of them: it draws its numbers from the records they carry and states one figure those briefs do not, the ratio between what a human-passable throat would require and the deepest negative energy density any laboratory has produced in a measured configuration. It also qualified one of them. Vacuum Energy Engineering called the averaged null energy condition “proved twice, in flat space, from independent premises” and treated that as the strongest single fact on its page. A 2024 review of the quantum energy inequalities, read for the study, characterises both results as argued rather than fully derived and records complete proofs in two dimensions only. That brief now says derivation rather than proof, in five places, and carries the review.

Affects: Wormholes, Space-Time Metric Engineering, Vacuum Energy Engineering, Negative Mass, Warp Drives, Alcubierre Metrics

Three briefs written outside the Institute’s own drafting, then checked

15 November 2026 · Review · Established · Incorporated in the brief

Three pieces of work had been stopped by an automated safety check: a new Xenotransplantation brief, the revision of Microphysiological Systems, and a new Mirror Life brief. Rather than reword the requests, the Institute set out what each brief had to cover, including the house standards and the facts already verified, and had the text drafted elsewhere. All three arrived on 15 November 2026 and were checked before publication.

The checking found two things worth recording. The drafts agreed with every fact the Institute had already verified. And one of them corrected this page: the Senate passed the FDA Modernization Act 3.0 on 16 December 2025, not 17 December, which was the day the bill reached the House. That entry now carries the correction.

What was checked, and what was not. The load-bearing claim of each brief was opened at its source: the footnote naming mirror organisms in the US high-risk research policy of 20 July 2026; the UK Research and Innovation policy statement that lists mirror-life organisms and requires a risk assessment rather than prohibiting the work; the UN Scientific Advisory Board’s brief; the joint statement of the China Arms Control and Disarmament Association and the Nuclear Threat Initiative; and the clinical update behind the pig-kidney record. The reading lists carry roughly 140 sources between them, and the Institute did not open every one. The citation ledger is what checks the rest, and it has not yet been run against these three briefs.

Microphysiological Systems keeps its argument and now carries the five changes listed on this page, which are marked as incorporated above. Xenotransplantation takes over the pig-organ record that Lab-Grown Organs had been carrying. Mirror Life owns the governance record from December 2024 onward and leaves the background on orthogonal biology to Xenobiology. All three are on the six-month review tier.

Affects: Microphysiological Systems, Xenotransplantation, Mirror Life

The cross-framework tool-poisoning study is published at AISec with its figures unchanged

15 November 2026 · Result · Frontier · Incorporated in the brief

The Dynatrace study cited by Agentic Autonomy and Control is published in the proceedings of AISec ’26, the ACM workshop on artificial intelligence and security, which was scheduled for 15 November 2026 in The Hague. The study measures tool-poisoning attacks on AI agents across frameworks. Its ACM reference is DOI 10.1145/3847352.3848107. The version carrying that reference reports the figures the brief already carried: 9,720 cells across 12 agent frameworks, 18 models and 45 poisoned-tool scenarios; 22.9% overall attack success; per-model success from 0.4% to 49.7%; and Claude Opus 4.8 vulnerable in 8 of 530 cells. It also repeats its caution that eight model identifiers lack dated snapshots, so a re-run may not reproduce it.

The brief reads the study as showing that model-level resistance to injection is real for some providers and absent for others. That reading now rests on a paper accepted through the workshop’s review rather than on a preprint, and because the figures did not change, the reading does not move. The brief now records the publication where it previously gave the presentation as scheduled.

Still open: independent replication across providers, which the brief names as the test its hypothesis should face.

Affects: Agentic Autonomy and Control

Huntington’s gene therapy: four-year slowing smaller and not significant

14 November 2026 · Result · Frontier · Incorporated in the brief

On 29 September 2026 uniQure reported four-year data for AMT-130, its one-time gene therapy for Huntington’s disease. In 12 high-dose patients the slowing of decline on the composite cUHDRS scale was 44 per cent against an updated external control, and it was not statistically significant. At three years, in 15 patients, the company reported 80 per cent. Three related briefs carried the September 2025 three-year figure, 75 per cent, without the later reading, two of them calling it the largest signal of its kind on record. Each now carries the four-year result with its date.

The company said more than half of the external control’s four-year data were missing and that the four-year effect was therefore likely understated. Its licence application rests on the three-year data. The comparison is still against an external control, not the trial’s own sham arm; Neurodegeneration Reversal sets out what that does and does not establish.

Affects: Neurodegeneration Reversal, Genetic Engineering, Neurogenetics, Neuroplasticity Engineering

Corrections to related briefs found during the second review pass

14 November 2026 · Correction · Established · Incorporated in the brief

Re-researching nine fast-moving briefs on 14 November 2026 turned up statements in related briefs that had gone out of date or were wrong. Each was checked against a source before it was changed.

  • Artificial Photosynthesis called a perovskite/silicon tandem solar-to-hydrogen system “already deployed”. Systems built on silicon alone are; tandem cells were still shipping in megawatts.
  • Neurogenetics put every treatment in its monogenic list at $2 million or more. The otoferlin deafness therapy approved in April 2026 is supplied free in the United States.
  • Cognitive Enhancement treated a US approval of a home tDCS device for depression as unverified. It is on the FDA record: premarket approval P230024, 8 December 2025.
  • Morphogenetic Pattern Formation gave embryo models a single efficiency of about one per cent. A 2026 report put it at 15 to 20 per cent of cultures.
  • Artificial Wombs described the ISSCR’s 2021 embryo-model framework as current. It was replaced on 11 August 2025, and the update prohibits culturing embryo models to potential viability.
  • Artificial Satellites for Climate Control used an orbital-mass baseline of 10,000 to 12,000 tonnes. ESA’s report of 1 May 2026 counts 15,883 tonnes at the end of 2025.
  • Deep Space Infrastructure said refuelling had no demonstration behind it. That holds for cryogenic transfer between spacecraft, not for refuelling in general.
  • Orbital Debris and Space Traffic described the ADRAS-J2 target as slowly tumbling. JAXA’s images show it almost stationary.
  • In-Space Servicing and Depots dated Swift’s re-entry from a tertiary source only. The US Space Force confirmed it on 4 November 2026.

Affects: Artificial Photosynthesis, Neurogenetics, Cognitive Enhancement, Morphogenetic Pattern Formation, Artificial Wombs, Artificial Satellites for Climate Control, Deep Space Infrastructure, Orbital Debris and Space Traffic, In-Space Servicing and Depots

EPA reinstates its 2035 goal for ending mammalian testing

14 November 2026 · Regulation · Established · Incorporated in the brief

The brief’s misconceptions section cites the EPA’s “abandoned” 2035 deadline as the counterexample to the idea that regulatory acceptance is only a matter of time. In January 2026 the EPA reinstated it. A release dated 21 January 2026 recommits the agency to the goal, first set in a 2019 memo, of eliminating mammalian study requests and funding by 2035, after the previous administration had cancelled the phase-out deadlines.

The example still makes the brief’s point, in a different form: a deadline set, cancelled and reinstated within seven years is a policy target, not evidence that validated replacements exist. Whether the 2035 date is met is open.

Affects: Microphysiological Systems

FDA Modernization Act 3.0 has passed both chambers, as separate bills

14 November 2026 · Law · Established · Incorporated in the brief

The brief says a bill styled FDA Modernization Act 3.0 “had not been enacted as of early 2026.” That remains true as of 14 November 2026, but each chamber has now passed a version: the Senate passed S. 355 by unanimous consent on 16 December 2025, and the House passed H.R. 2821 on 20 July 2026. The two chambers must pass the same bill before it can go to the President. As passed by the House, it would require the FDA to issue, within one year of enactment, an interim final rule replacing “animal” with “nonclinical” in specified regulations.

Like the FDA rule recorded below, the bill addresses how the regulations are worded. Neither names a method the agency must accept, so the brief’s distinction between permission and acceptance stands.

Corrected 15 November 2026. This entry first gave 17 December 2025 as the date the Senate passed S. 355, following the legal summary it was built from. Congress.gov’s action list for the bill shows the Senate passed it on 16 December 2025 and the House received it on 17 December. The substance of the entry is unchanged.

Affects: Microphysiological Systems

FDA rule replaces “animal” with “nonclinical” in its drug regulations

14 November 2026 · Regulation · Established · Incorporated in the brief

On 22 September 2026 the FDA published a direct final rule, Nonclinical Testing Terminology, which substitutes “nonclinical” for references to animal tests and studies in its drug and biologics regulations and adds definitions for the new terms. The agency states that the rule adds no new requirements. It takes effect on 4 February 2027; comments close on 7 December 2026, and if significant adverse comment is received the agency will withdraw it and proceed through a companion proposed rule.

For this brief, the rule does by regulation much of what the FDA Modernization Act 3.0 would direct by statute. It removes wording that implied animal data were the default; it qualifies no organ chip, so the brief’s central fact — that no microphysiological system has been qualified — still holds.

Affects: Microphysiological Systems

First organ chip enters the final stage of FDA qualification

14 November 2026 · Regulation · Established · Incorporated in the brief

On 9 September 2026 Emulate announced that it had submitted a full qualification package for its Human Liver-Chip to the FDA’s ISTAND programme, for assessing drug-induced liver injury, with data from two of its platforms. Submission opens the final stage of review; it is not qualification. The brief’s statement that no microphysiological system had completed ISTAND therefore still holds as of 14 November 2026, but the first decision is now pending.

The company reports that the package includes reproducibility data from three independent laboratories; the package itself is not public. A qualification would answer, for one context of use, the question this brief treats as decisive: whether a regulator will name a method for a named purpose. It would not by itself supply the prospective, between-laboratory study the brief ranks first.

Affects: Microphysiological Systems

The Liver-Chip’s 87 per cent sensitivity is an adjusted figure

14 November 2026 · Correction · Established · Incorporated in the brief

The brief reports that the human Liver-Chip “identified 87 per cent of the toxic compounds” in its 2022 validation study. That is the study’s headline figure, and it was reached with drug concentrations adjusted for protein binding. A December 2022 commentary on the study reports that before that adjustment the chip flagged 12 of 15 toxic drugs, a sensitivity of 80 per cent.

The 100 per cent specificity, and the brief’s caveats about a vendor-authored, retrospectively selected panel, are unaffected. Where the brief quotes 87 per cent it should say the figure is adjusted, and its next revision will.

Affects: Microphysiological Systems

November 2026 review, second pass: nine fast-moving briefs

14 November 2026 · Review · Established · Incorporated in the brief

On 14 November 2026 the nine briefs listed below, all on the six-month fast tier, were re-researched in full from fresh sources under the review policy. In each, every dated and forward-looking claim was checked, what had changed since September was added with its date, earlier forecasts were kept beside what happened to them, and no claim previously flagged as uncertain was dropped. Each now carries a review badge dated 14 November 2026, which restarts its review clock.

Among the events now in the text: the first US approval of a gene therapy for inherited deafness and of a home brain-stimulation device for depression; the August 2025 rewrite of the international rules for stem-cell embryo models; four-year data for the Huntington’s gene therapy and its application for approval; a 35.5 per cent certified perovskite/silicon cell and the first US hybrid-module production; ESA’s tenth space environment report; and the failed commercial rescue of NASA’s Swift observatory, which re-entered on 4 November 2026. Where sources disagreed, as on the fibre distance at which a memory-based quantum link first beats direct transmission, the briefs say so rather than pick one.

Affects: Quantum Networks, Perovskite Tandem Photovoltaics, Neurodegeneration Reversal, Precision Neuropsychiatry, Embryo Models, Sensory Restoration, Orbital Debris and Space Traffic, In-Space Servicing and Depots, In-Vitro Gametogenesis

November 2026 review: briefs re-examined against current sources

13 November 2026 · Review · Established · Incorporated in the brief

On 13 November 2026 the briefs listed below were re-examined against current sources under the review policy. In each, every dated and forward-looking claim was checked, what had changed since September was added with its date, and no claim previously flagged as uncertain was dropped. Most were re-researched in full from fresh sources. Planetary Defense, Nuclear Waste Solutions, Small Modular Reactors, Energy Storage Revolutions, Geothermal Megaprojects, Mars Colonization, Nanomedicine and Lab-Grown Organs had a light review: their dated claims were re-checked and the sections those claims sit in were revised. Each now carries a review badge dated 13 November 2026, which restarts its review clock.

Events that had come due since September are now in the text, among them ESA’s Hera arriving at the Didymos asteroid system, Finland licensing the first deep geological repository for spent nuclear fuel, China extending its pause on new rare-earth export controls, and the first closed-loop thorium-229 nuclear clocks.

Affects: Precision Quantum Sensing, Quantum Materials, Programmable Metasurfaces, Mars Colonization, Planetary Defense, Cislunar Navigation and Lunar Time, Multi-Messenger Astronomy, Megaconstellation Externalities, Lab-Grown Organs, Nanomedicine, Immune Engineering, RNA Medicines, Ex-Vivo Organ Repair, Pathogen-Agnostic Surveillance, Generative Biomolecular Design, Metabolic Medicines, Fault-Tolerant Quantum Computing, AI Companions, Autonomous Materials Discovery, Critical Mineral Midstream, Compute Concentration, Energy Storage Revolutions, Geothermal Megaprojects, Small Modular Reactors, Nuclear Waste Solutions, Carbon Removal Verification, Earth-System Digital Twins, Post-Quantum Migration, Digital Chokepoints, Advanced Air Mobility, Information Integrity

Four corrections to the pig-organ transplant record

13 November 2026 · Correction · Established · Incorporated in the brief

The Lab-Grown Organs brief carries the Institute’s record of gene-edited pig organs transplanted into living people. Four statements in its September text were wrong or out of date, and were corrected on 13 November 2026:

  • The recipient who lived 271 days with a pig kidney was described as back on dialysis and still waiting. He received a deceased-donor human kidney on 13 January 2026, which his hospital describes as the pig kidney serving as a bridge to a human transplant.
  • An auxiliary pig liver was described as lasting 171 days. The graft was removed on day 38; 171 days was the recipient’s survival.
  • “Every graft lost or removed” overlooked the first living kidney recipient, who died at 52 days of a cardiac cause with the graft still working.
  • The brief did not mention the pig-heart clinical trial the FDA cleared on 15 May 2026.

The same two errors about the 271-day recipient were corrected in Designer Organisms and Whole Organ Regeneration. The pig-organ record continues to live in Lab-Grown Organs.

Affects: Lab-Grown Organs, Designer Organisms, Whole Organ Regeneration, Xenotransplantation

The record begins in November 2026. Version v1.3.0 · November 2026.