The Watchlist holds every dated event the briefs name. 242 of them are targets: dates set by the party doing the work, for its own work, and between them they name 170 organisations. A first flight “in 2027”, a plant online “by the first quarter”, a trial reading out “in the second half”. A date chosen by the organisation that benefits from meeting it is evidence of intent, not of schedule, and this page measures the difference.

Laws and calendars are recorded on the Watchlist but not scored here. A regulation that applies on a fixed date, or a conference that meets when it said it would, tells a reader little about anyone’s forecasting.

How a target is scored

  • Happened on time: it happened by the end of the period the party gave. A target “in 2026” is on time until 31 December 2026; a target on a named day has that day.
  • Happened late: it happened after that period closed. A target that slipped and then happened is scored here.
  • Partly happened: part of what was promised happened inside the period; the record says which part.
  • Did not happen: the period closed without it and no new date was given.
  • Slipped: a new date was announced. The event goes back on the Watchlist on its new date and is scored again when that one passes.
  • Cancelled: the work was formally abandoned.
  • Not established: the public record does not show what happened. These are listed and are left out of any share.

Every outcome except the last cites a source, and a party’s own announcement counts only for what it says the party did. These targets are the ones the briefs happened to name. They are not a sample of any industry, so the counts describe this list and nothing wider.

So far

One target has been recorded so far: met, missed, moved or abandoned. 0 of 1 happened on time. A share will be printed once at least 10 outcomes are established; below that, a percentage would say more than the evidence does.

Set byRecordedHappened on timeHappened latePartly happenedDid not happenSlippedCancelledNot established
Companies10000100
All10000100

Every recorded target

PartyTargetDate givenOutcomeRecorded
The Metals Company US decision on The Metals Company's commercial recovery permit outside the Authority the first quarter of 2027 Slipped, now the fourth quarter of 2027 12 November 2026

Next to come due

The open targets whose periods close soonest. Each is checked when its period closes, and a release cannot ship while one has gone unrecorded for more than sixty days.

PartyTargetDue byBrief
eGenesis eGenesis fifth expanded-access pig-kidney recipient reaching one year post-transplant 22 November 2026 Xenotransplantation
ESA ESA release of Hera's first detailed images of Dimorphos 25 November 2026 Planetary Defense
Astrobotic Astrobotic Griffin lunar landing carrying Astrolab FLIP rover to Nobile crater region 30 November 2026 Lunar Industry
Gold Hydrogen Gold Hydrogen publishes a maiden helium contingent resource for its Ramsay Project in South Australia 30 November 2026 Geologic Hydrogen
US Department of Energy US Department of Energy contracts with host states for Nuclear Lifecycle Innovation Campuses 15 December 2026 Nuclear Waste Solutions
1X Technologies 1X's first US customer deliveries of its home humanoid 31 December 2026 Embodied AI and Robot Foundation Models
Absci Interim proof-of-concept data for Absci's machine-learning-designed antibody 31 December 2026 Generative Biomolecular Design
Archer Aviation Archer's first piloted transition flight 31 December 2026 Advanced Air Mobility
Atlas Data Storage Atlas Data Storage scales DNA data storage to terabyte data sets 31 December 2026 DNA Data Storage
Banco Central do Brasil Banco Central do Brasil launches Drex, its tokenised settlement platform 31 December 2026 Digital Public Infrastructure
Firefly Aerospace Firefly's Blue Ghost Mission 2 to the lunar farside 31 December 2026 Lunar Industry, Lunar Farside Radio Cosmology
Rosatom Physical start-up of Russia's BREST-OD-300 lead-cooled fast reactor 31 December 2026 Advanced Fission