Marathon Fusion is a real, technically serious seed-stage company. None of the things it says it has done has yet been checked in public by anyone outside it. The nearest is lithium-6 enrichment in a plasma centrifuge, which the company says a materials-testing laboratory certified in August 2026; no certificate, laboratory statement or enrichment level has been published. Its October 2026 claim to have turned mercury into stable gold rests on textbook physics and one posted gamma-ray spectrum, and no mass, neutron source or data has been published; at the stated “ten times CERN’s record” the quantity is at most about nine billionths of a gram a year, and a thirtieth of that if the comparison is of totals. Gold from power plants would need fusion plants that do not yet exist, thousands of tonnes of mercury per plant and seven to eighteen years of storage before sale. By the company’s own estimate a neutron is worth about ten orders of magnitude more as a medical isotope than as gold, and that, not gold, is where its business case lies.
The company
| Founded | 2023, San Francisco [2] |
| Set up to make | Tritium fuel-cycle systems for fusion power plants; since 2025 it has also proposed making isotopes, including gold, with fusion neutrons [2, 5] |
| Team | 28 people, by the company’s count in October 2026 [1] |
| Leadership | Kyle Schiller, chief executive; Adam Rutkowski, chief technology officer; Jason Parisi, who leads its science and is lead author of most of its papers [2, 9] |
| Disclosed funding | About US$11 million in seed funding and federal grants on public record, including a US$5.9 million seed round co-led in July 2024 by 1517 Fund and Anglo American, a mining company. The company says it has raised over US$18 million. [5, 7, 2] |
| Customers | None disclosed. The company said in July 2024 that it had signed letters of intent with Commonwealth Fusion Systems and Helion; their terms are not public. [5, 6] |
| Stated plans | A Series A “based on the results”; a commercial pilot facility in 2028; “tens of tons” of lithium-6 a year by 2029 [8] |
What it claims, and how far each claim has got
Each claim is placed on the Institute’s evidence ladder, which measures how far the public evidence for a claim has got, not whether the claim is true: Claimed, Described, Shown, Verified, Repeated and In use. The definitions are on the Frontier Companies page. Flags inside each assessment follow the rest of the site: Established, Frontier, Speculative and Handwave.
Mercury turned into “real, stable gold” with fusion neutrons in September 2026, “at 10x the record set by CERN in 2025”
Established The reaction is textbook: a 14 MeV fusion neutron knocks a second neutron out of mercury-198, and the mercury-197 left behind decays within days to gold-197, gold’s only stable isotope. Four independent groups have measured its cross section. Established CERN’s 2025 record was about 89,000 gold nuclei a second at peak, 29 picograms over 2015 to 2018. Ten times that rate for a year is about 9 nanograms; ten times the total is 0.29 nanograms. A laboratory neutron generator reaches either with a thimble of natural mercury. Frontier The spectrum counts mercury-197 decaying, so “stable gold” is inferred from decay physics rather than weighed. The run probably happened as described; it shows a reaction, not a product, and says nothing yet about the strength of Marathon’s own source.
| What is public | One gamma-ray spectrum with lines the company labels mercury-197 and gold-197, counted 8 to 44 hours after irradiation. |
| What is missing | The mass of gold, the neutron source and its flux, the sample mass, the irradiation time, the raw data, and whether “ten times” compares rates or totals. |
| What would settle it | A preprint or dataset on the run, followed by an independent laboratory assay of the gold. |
Lithium-6 and hydrogen isotopes enriched in the company’s plasma centrifuge
Frontier This could be the company’s strongest result, and it is the one least connected to its headlines. Every deuterium-tritium power plant must breed its own tritium from lithium enriched in lithium-6, and the Commercial Fusion brief names that enrichment as a bottleneck the industry rarely mentions: the old mercury-based process was abandoned and its capacity allowed to lapse. A certificate from an outside laboratory would move the claim past the company’s say-so; none is public. Whether it matters depends on numbers not yet published: how much, how pure, and at what cost per kilogram.
| What is public | The company says a materials-testing laboratory, Covalent, certified the lithium-6 enrichment; no certificate, laboratory statement or enrichment figure is public. |
| What is missing | The laboratory’s certificate or statement, the enrichment level, separation factor, throughput and energy per kilogram. The hydrogen result was not independently verified, and no tritium has been put through the machine. |
| What would settle it | Published separation metrics with an outside laboratory’s certificate, then a pilot plant producing to specification. |
Isotopes enriched in “the world’s most powerful plasma centrifuge, beating the Soviet record that stood for 40 years”
Speculative The likeliest benchmark is a 1988 Kurchatov Institute review of plasma centrifuges driven at more than a megawatt. If so, “most powerful” refers to drive power, which says nothing about how well the machine separates isotopes.
| What is public | The statement. |
| What is missing | Which record, the input power, the separation achieved. |
| What would settle it | The run’s parameters, and the record it is compared with. |
A fusion reactor being built in San Francisco “to achieve record power density”, doubling it every month
Established The device is a deuterium beam fired at a solid lithium-tritide target. Such machines return at most about 1% of their beam energy as fusion, so it can never produce net electricity; the company’s own papers accept this. It is a neutron source. Frontier Even so, 1 kW of deuterium-tritium fusion is about 3.6×1014 neutrons a second, roughly eight times the steady-state record set in 2019. Reaching it would be a real achievement; going from 1 kW to a gigawatt is twenty monthly doublings.
| What is public | Design targets on the company’s website: 1 kW of fusion power, 20 kW/m², a neutron flux of 1012 per cm² per second. |
| What is missing | Beam parameters, any achieved neutron yield, the starting date for the monthly doubling, and a licence for the tritium. |
| What would settle it | A state radioactive-materials licence for the site, then a measured neutron yield. |
“Our first medical isotopes”: copper-64 and copper-67 made from zinc
Established Making copper isotopes from zinc with 14 MeV neutrons from laboratory generators is routine nuclear chemistry. The spectrum shows that the company had access to a source of that class by September 2026, and little more.
| What is public | One gamma-ray spectrum. |
| What is missing | Activities, specific activity, purity, partners and regulatory filings. |
| What would settle it | Measured activities and a named clinical or research customer. |
A fusion blanket can make about 2 tonnes of gold per gigawatt of fusion heat a year while breeding its own tritium, allowing plants to “double the revenue generated”
Speculative The yield is physically bounded and plausible: it needs more than half of all fusion neutrons to react in mercury. The reference plant reaches a tritium-breeding ratio of 1.19 only with idealised structure, and real blankets lose a tenth to a third of their ratio to structure and ports, which is the whole margin. The only independent simulation found could not reach 1.2. Established The reference plant holds 622 tonnes of mercury-198, which is 6,239 tonnes of natural mercury: about thirty years of the world’s 2025 primary mine output. Its gold comes out radioactive, from a gold-195 contaminant, and must be stored 6.8 years to meet a waste limit and 13.7 to ship without a radioactive label. Handwave “Double the revenue” takes no account of that storage, of what enrichment costs, or of what a fleet’s gold would do to the price. Karl Lackner, emeritus director at the Max Planck Institute for Plasma Physics, accepts the physics and judges the gold from a gigawatt reactor worth about as much as its electricity, but expects that it “probably wouldn’t be done in the first generation of fusion reactors”.
| What is public | An unreviewed preprint, still at its third version, with a neutronics simulation of one reference plant. Its data are to be released “upon publication”. |
| What is missing | Peer review, an independent neutronics check with realistic blanket structure, and any route to hundreds of tonnes of enriched mercury. |
| What would settle it | A named, independent review of the breeding ratio with real structure; a kilogram-scale mercury-198 enrichment pilot. |
Fusion neutrons can make actinium-225, thorium-229, lead-212 and other medical isotopes at scale
Frontier This is the coherent core of the company’s plan. By its own estimate a fusion neutron earns about 10−20 dollars as electricity or gold and about 10−10 as actinium-225, so a kilowatt-scale source can pay long before any power plant does. Speculative The headline yields assume a 10 MW source; its tables also give figures at 1 kW, the scale of the company’s own design, where yields are correspondingly smaller. The steady-state deuterium-tritium record is 130 watts. The market is real and short of supply, but producers using other routes are already scaling: one has made actinium-225 at commercial scale since January 2026.
| What is public | A series of unreviewed preprints, from November 2025 to September 2026, with yield tables for modelled sources. |
| What is missing | A source at the power the headline yields assume, measured yields, purity, and a customer. |
| What would settle it | A measured activity from a real irradiation, then a drug master file and a paying customer. |
Where it fits
The briefs this company’s work bears on, and how. Each of those briefs links back here.
Commercial Fusion
The brief names lithium-6 as the bottleneck “almost never mentioned”: every plant must breed its own tritium from enriched lithium, and the world let the old enrichment capacity lapse. Marathon’s enrichment, which the company says a materials-testing laboratory certified, bears on that directly, and its missing numbers are the ones that would decide whether it can supply a fleet. The gold blanket bears on the brief’s other unmet requirement, breeding: it spends neutrons the blanket needs, at a modelled margin that real structure would probably consume. Any mercury channel waits on the first deuterium-tritium plants with breeding blankets, the earliest of which is ARC, after SPARC’s first plasma.
Muon-Catalyzed Fusion
The brief already cites Marathon’s paper on muon-catalysed isotope production as that field’s likeliest first product. The company makes the same argument for deuterium-tritium neutrons: a source far too weak to make electricity can still pay by making scarce medical isotopes. That ranking, not gold, is the strongest idea in its portfolio.
Nuclear Clocks
Speculative The brief says thorium-229 supply is a question of access, and that the world’s inventory is fixed once Oak Ridge’s uranium-233 campaign ends. Marathon’s September 2026 preprint models a fusion route, thorium-230(n,2n)thorium-229, accumulating about 250 curies, roughly 1.3 kg, in six months from a 10 MW source. That would be about thirty times the roughly 40 grams the brief records Oak Ridge as expecting, and more against the “few grams” the paper cites. The paper is about cancer therapy, not clocks, and the source it assumes is about 77,000 times the steady-state record; the connection is the Institute’s, not the company’s.
Extreme-Environment Test Infrastructure
The brief finds no fusion-spectrum irradiation position anywhere, and describes such facilities as purchases only states make. Marathon’s beam-target source, if it reached its design flux, would be a privately built fusion-spectrum source on a centimetre-scale target: far short of what materials qualification needs, but a test of whether the capability has to be bought at national scale at all.
Asteroid Mining
The brief’s point about asteroid platinum applies to fusion gold: a valuation that uses today’s price assumes the delivery has not happened. Gold is priced as a stock, not a flow, so a credible synthetic route would move the price through expectations years before metal arrived, and the 7-to-18-year storage lag means the first plant would sell into a price set by every plant that followed it.
The numbers
Figures marked as Institute arithmetic are the Institute’s own derivations from the cited sources; the working is shown so that anyone can redo it.
| Quantity | Value | How it is worked out | Sources |
|---|---|---|---|
| “Ten times CERN’s record” | About 9 nanograms of gold a year, read as a rate; 0.29 nanograms, read as a total | 10 × 89,000 nuclei a second for a year; or 10 × 29 picograms (2015–2018). Institute arithmetic. | 15 |
| Neutron flux needed for that rate | About 108 per cm² per second on one cubic centimetre of natural mercury: a laboratory generator at a few centimetres | A 2-barn cross section on 4.1×1021 mercury-198 atoms. Institute arithmetic. | 17 |
| Marathon’s 1 kW design source | 3.6×1014 neutrons a second, about eight times the steady-state record of 4.6×1013 (2019) | 1,000 W divided by 2.82×10−12 J per reaction. Institute arithmetic. | 4, 18 |
| Gold per fusion neutron in the preprint | 0.54 atoms | 2 tonnes is 6.1×1027 atoms; a gigawatt of fusion heat releases 1.12×1028 neutrons a year, taking a gigawatt thermal as a gigawatt of fusion power; Institute arithmetic. | 10 |
| Natural mercury per reference plant | 6,239 tonnes, about thirty years of 2025 primary mine output (210 tonnes) | 622 tonnes of mercury-198 at 9.97% natural abundance. | 10, 20 |
| Storage before the gold can be sold | 6.8 years to a low-level-waste limit; 13.7 to ship without a radioactive label; 17.7 for an ounce to fall below a banana’s activity | Gold-195, 186-day half-life. The preprint’s figures, reproduced by the Institute. No release standard for activated gold exists. | 10, 28 |
| Fusion capacity to match mined gold | 1,650 to 1,840 gigawatts of fusion heat | 3,300 tonnes (USGS) or 3,672 tonnes (World Gold Council) at 2 tonnes per gigawatt-year. | 10, 21, 22 |
| The gold credit per megawatt-hour | About $18 for every $1,000 an ounce: about $66 at 19 November’s $3,625, about $74 at 22 October’s $4,050 | 64,301 ounces from a gigawatt of fusion heat delivering 3.51 TWh at 40% conversion. Institute arithmetic. | 23, 31 |
| The credit after the 13.7-year hold | About $23 at an 8% discount rate; up to about $58 if the gold could be sold forward at a 1% lease rate, though no market quotes that far ahead | Discount factors of 0.348 and 0.872 on $66. Institute arithmetic. | Institute arithmetic |
| Revenue per neutron, on the company’s estimate | About 10−20 dollars as electricity or gold; about 10−10 as actinium-225 | The company’s February 2026 paper. | 12 |
What would change this assessment
Status as of 22 November 2026. Events that are also on the Watchlist link to it.
| Milestone | Why it matters | Status | Latest |
|---|---|---|---|
| Data on the September gold run — neutron source, flux, sample mass, measured activity — and an independent assay of the gold | Turns a reaction signature into a quantity. | Not seen | Nothing published as of 22 November 2026. |
| A state licence for tritium and a neutron generator at the company’s site | Confirms the reactor is being built and starts the clock on the monthly doubling. | Not seen | None reported as of 21 November 2026. |
| Separation factor, throughput and energy use for the centrifuge, published with an outside laboratory’s certificate | Decides whether the 2028 pilot and the 2029 lithium-6 target are credible. | Not seen | No figures published. [8] |
| A closed Series A, and its size | Shows whether investors bought the gold, the isotopes or the fuel cycle. | Not seen | None reported. The company was not among the 28 federal INFUSE awards of 2 November 2026. [27] |
| First plasma in SPARC, ahead of ARC, the first deuterium-tritium plant with a breeding blanket on any announced schedule | Sets the earliest date any blanket could carry mercury. | In progress | Expected in 2027. |
| A named, independent neutronics review of the 1.19 breeding ratio with realistic blanket structure | The first outside scrutiny of the gold-blanket concept. | Not seen | The preprint is still at version 3 and unreviewed. [10] |
| The NRC’s final rule for fusion machines, and a release level for activated gold | Sets how long reactor gold must be held before sale. | In progress | Proposed 26 February 2026; not final. [28] |
| Paying isotope customers and repeatable operation | Shows a neutron-service market exists before any power plant does. | Not seen | None disclosed. |
Sources
Statements by the company and its own papers are labelled as such; nothing the company has published has been peer reviewed.
- Marathon Fusion, thread on X, 21 October 2026 — Company statement. x.com/MarathonFusion/status/2113001073019662481
- Marathon Fusion, About — Company statement. marathonfusion.com/about
- Marathon Fusion, Alchemy — Company statement. www.marathonfusion.com/alchemy
- Marathon Fusion, Beam-driven fusion — Company statement. marathonfusion.com/beam-driven-fusion
- Marathon Fusion closes $5.9M seed round to process fuel for fusion energy, PR Newswire, 18 July 2024 — Company statement. www.prnewswire.com/news-releases/marathon-fusion-closes-5-9m-seed-round-to-process-fuel-for-fusion-energy-302200223.html
- TechCrunch, Without this company’s technology, future fusion power plants might never light up, 18 July 2024 — Press report. techcrunch.com/2024/07/18/without-this-companys-technology-future-fusion-power-plants-might-never-light-up
- CB Insights, Marathon Fusion company profile (funding total) — Data. www.cbinsights.com/company/marathon-fusion
- Heatmap, on Marathon Fusion’s lithium and hydrogen enrichment, 27 August 2026 — Press report. heatmap.news/climate-tech/marathon-fusion-lithium-tritium
- Nuclear Engineering International, Marathon in fusion fuel cycle breakthrough, September 2026 — Press report. www.neimagazine.com/news/marathon-in-fusion-fuel-cycle-breakthrough
- Rutkowski, Harter and Parisi, Scalable Chrysopoeia via (n,2n) Reactions Driven by Deuterium-Tritium Fusion Neutrons, arXiv:2507.13461 (2025) — Company preprint. arxiv.org/abs/2507.13461
- Parisi and Rutkowski, Isotope Production in Fusion Systems, arXiv:2512.09242 (2025) — Company preprint. arxiv.org/abs/2512.09242
- Parisi and Schiller, The Value and Cost of Fusion Neutrons, arXiv:2603.00835 (2026) — Company preprint. arxiv.org/abs/2603.00835
- Parisi and Rutkowski, Scalable Production of Lead-212 and Actinium-225 Generators with Fusion Neutrons, arXiv:2609.19166 (2026) — Company preprint. arxiv.org/pdf/2609.19166
- Parisi and Rutkowski, Isotope Production in Muon-Catalyzed-Fusion Systems, arXiv:2511.20951 (2025) — Company preprint. arxiv.org/pdf/2511.20951
- CERN, ALICE detects the conversion of lead into gold at the LHC, 8 May 2025 — Independent. home.cern/alice-detects-conversion-lead-gold-lhc
- Karl Lackner, Five questions on producing gold via nuclear fusion, Max Planck Research 3/2025 — Independent. www.mpg.de/25735182/S006_Five_Questions_074.pdf
- Palvanov et al., cross sections of the mercury-198(n,2n) reaction near 14 MeV — Independent. indico.gsi.de/event/13014/contributions/60856/attachments/39459/53620/30_palvanov-satimbay-198hg.pdf
- Physics World, Record-breaking fusion reaction could transform medical isotope production, 2019 — Press report. physicsworld.com/a/record-breaking-fusion-reaction-could-transform-medical-isotope-production
- Kishimoto, on the energy ceiling of beam-target fusion, arXiv:2601.09458 (2026) — Independent. arxiv.org/html/2601.09458v2
- US Geological Survey, Mineral Commodity Summaries 2026: Mercury — Government. pubs.usgs.gov/periodicals/mcs2026/mcs2026-mercury.pdf
- US Geological Survey, Mineral Commodity Summaries 2026: Gold — Government. pubs.usgs.gov/periodicals/mcs2026/mcs2026-gold.pdf
- World Gold Council, Gold Demand Trends, full year 2025 — Data. www.gold.org/goldhub/research/gold-demand-trends/gold-demand-trends-full-year-2025
- Kitco, Gold falls below $3,650, 19 November 2026 — Press report. www.kitco.com/news/article/2026-11-19/gold-falls-below-3650-silver-tumbles-fed-rate-concerns-pressure-metals
- The Deep Dive, Marathon Fusion claims 10x CERN gold record without disclosing actual yield, 22 October 2026 — Press report. thedeepdive.ca/marathon-fusion-claims-10x-cern-gold-record-without-disclosing-actual-yield
- The Oregon Group, Fusion start-up turns mercury into gold, but can’t say what it costs, October 2026 — Press report. theoregongroup.com/latest-news/marathon-fusion-mercury-gold-cern-record-cost
- Fusion forum thread with an independent OpenMC simulation of a mercury blanket — Independent. bs-fusion.discourse.group/t/can-fusion-turn-mercury-into-gold/94
- US Department of Energy, INFUSE fiscal 2026 awards list, 2 November 2026 — Government. science.osti.gov/-/media/funding/pdf/Awards-Lists/2026/Awards-List-Spreadsheet-Template_INFUSE-FY26.pdf
- US Nuclear Regulatory Commission, proposed regulatory framework for fusion machines, Federal Register, 26 February 2026 — Government. www.govinfo.gov/content/pkg/FR-2026-02-26/html/2026-03865.htm
- Korobtsev and Rusanov, review of plasma centrifuges, Kurchatov Institute (1988), OSTI 5623362 — Independent. www.osti.gov/etdeweb/biblio/5623362
- NorthStar Medical Radioisotopes, routine commercial-scale actinium-225 production, 6 January 2026 — Company statement. www.northstarnm.com/northstar-medical-radioisotopes-confirms-successful-routine-commercial-scale-ac-225-production
- Fortune, gold price on 22 October 2026 — Press report. fortune.com/article/current-price-of-gold-10-22-2026