Where it stands

Joby Aviation is the American eVTOL developer furthest into FAA certification on its own account, and much of what it says it has done is public: piloted vertical take-offs and transitions to wing-borne flight in California and Dubai, demonstration flights in Texas and Florida, and a first FAA-conforming aircraft flying with company pilots since March 2026. The evidence that matters most is not public. Its certification progress is its own chart, which, on the Institute’s reading, put its side of the fourth of five stages at 83% in October 2026; the FAA publishes no such figure, and FAA pilots are not due to begin training on the aircraft until the first half of 2027. Its American first-passenger targets have run 2024, 2025 and 2026, and now 2027. Its range figure dates from a 2021 prototype, and its headline noise figure is its own extrapolation of NASA’s data. The 2022 accident on record happened beyond the flight envelope, and its cause is known; apart from one commentator on it, this page quotes no outside critic. In Dubai two vertiports are built and certified, but no passenger can fly before a UAE operator certificate. The business case rests on the type certificate; until it arrives, revenue is Blade’s helicopters.

The company

Founded 2009, by JoeBen Bevirt [1]
Headquarters Santa Cruz, California, United States [1]
Set up to make A piloted electric air taxi with six tilting propellers that takes off vertically and cruises on a wing, carrying a pilot and four passengers, which it means to certify, build and fly as its own operator; it has held an FAA air carrier certificate since May 2022 [1, 4, 7, 25]
Leadership JoeBen Bevirt, founder and chief executive; Paul Sciarra, executive chairman; Didier Papadopoulos, president of aircraft OEM; Gregory Bowles, chief policy officer; Rodrigo Brumana, chief financial officer [14, 23]
Listing New York Stock Exchange, as JOBY, since August 2021, after a merger with Reinvent Technology Partners, a special purpose acquisition company. Toyota agreed a US$500 million strategic investment, of which the first US$250 million closed in 2025. [1, 10]
Customers No eVTOL passenger has paid a fare. Revenue of US$55.1 million in the third quarter of 2026 came primarily from Blade, its helicopter and jet passenger business, which flew more than 44,000 passengers that quarter. The US Air Force has committed nearly US$37 million, mainly to autonomy work. Dubai’s Roads and Transport Authority granted it six years’ exclusive rights to run air taxis in the emirate in February 2024. [5, 20, 21, 22]
Stated plans FAA pilot training and Joby flight testing of the relevant aircraft in the first half of 2027; operational flight testing in Dubai “with a pilot on board” before the end of 2026; four aircraft a month in 2027; up to 500 a year eventually from Ohio [13, 14, 22]

What it claims, and how far each claim has got

Each claim is placed on the Institute’s evidence ladder, which measures how far the public evidence for a claim has got, not whether the claim is true: Claimed, Described, Shown, Verified, Repeated and In use. The definitions are on the Frontier Companies page. Flags inside each assessment follow the rest of the site: Established, Frontier, Speculative and Handwave.

“We’re on the fifth and final stage of the type certification process”, with stages one to three complete; on the Institute’s reading of the company’s chart, stage four stood at 83% on its side and 78% on the FAA’s

Said 4 November 2026 · Claimed

Established The five stages are the company’s way of presenting the FAA process: certification basis, means of compliance, certification plans, testing and analysis, then “show and verify” under a Type Inspection Authorization. By its account it entered the last stage in December 2024, when four FAA test pilots spent three days evaluating a conforming flight deck in a simulator; its own pilots began flying a conforming aircraft in March 2026; no FAA pilot has yet flown one for credit. Established Its side of stage four went from more than 40% in December 2024 to 70% in August 2025 and, on the Institute’s reading of the latest chart, 83% at 30 October 2026; the FAA’s side from more than 50% to 78%. Stage five stood at 25% and 14%. Speculative At the 2025–26 pace, about 0.9 points a month, the 17 points left on the company’s side would take about a year and a half, though the company warns that its percentages move as documents are edited and resubmitted. Handwave Its policy chief’s point that every aircraft to enter TIA has eventually been certificated carries no date and comes from categories with settled rules; he added that there are “no guarantees”. Frontier The company’s strongest case is that no rival has reported getting this far: the Advanced Air Mobility brief records Archer’s means of compliance accepted only in January 2026, and no eVTOL type certificate from the FAA or EASA.

What is publicThe company’s quarterly chart and releases, and its accounts of FAA “for credit” tests and FAA-approved test reports. The FAA publishes no progress figures.
What is missingWhat the percentages count, any FAA statement of the programme’s status, and the start of flight tests by FAA pilots under the Type Inspection Authorization.
What would settle itFAA pilots flying the conforming aircraft for credit, then a type certificate; or a further move of the dates.

Sources: 6, 8, 10, 14, 22, 23

“Joby’s First FAA-Conforming Aircraft Takes Flight”, flown by company pilots ahead of FAA pilots

Said 11 March 2026 · Shown

Established The aircraft flies as described: piloted, it takes off vertically, converts to wing-borne flight and lands, in public, in California and Dubai, and it has flown piloted pilot-programme demonstrations in Florida and demonstration flights in Texas. Dubai’s government reported the first crewed point-to-point air-taxi flight in the UAE, which the company dates to 9 November 2025, and the FAA’s administrator has welcomed the pilot-programme flights as a source of data. Established The record also has a failure. On 16 February 2022 a remotely piloted prototype broke up after a propeller blade separated in a commanded dive to 181 knots at 8,900 feet. The NTSB found test conditions beyond the aircraft’s expected operating envelope, with a faulty tilt-actuator linkage contributing; no one was hurt. 181 knots indicated is about 208 mph, and more in true airspeed at that altitude, above the 200 mph top speed the company advertises. Frontier The company says it changed the design and added instrumentation and testing. Alex Scerri, writing in Vertical, credited uncrewed envelope testing for the absence of injury, noted that the on-board camera was not crash-resistant and the data module yielded nothing usable, and argued that such lessons “must be shared openly and in a timely manner”. The Institute found no other accident to a Joby aircraft in the sources it read.

What is publicPiloted flights in public: in Dubai since June 2025, a 17-minute point-to-point flight to Al Maktoum International Airport in November 2025, and pilot-programme demonstration flights in Florida in October 2026. Pilot-programme demonstration flights in Texas in September 2026. The NTSB’s report on the 2022 accident.
What is missingFlight-test data, the FAA’s conformity findings on the aircraft, and any account of the flight envelope cleared so far.
What would settle itFAA pilots completing for-credit flight tests across the envelope.

Sources: 9, 12, 14, 17, 19, 25, 26, 27, 29

“First, FAA pilots will come to Joby to train on our aircraft”, in the first half of 2027, with early American passenger flights in 2027

Said 4 November 2026 · Claimed

Established The date has moved twice in fifteen months. In August 2025 the company expected its pilots to fly the first conforming aircraft that year, with FAA pilots “shortly thereafter”; in November 2025, FAA pilots “taking the controls in 2026”; in March 2026, for-credit flight testing later in 2026; in November 2026, training in the first half of 2027. American first-passenger targets have run 2024, 2025, 2026 — repeated as late as 5 August 2026 — and now 2027. Frontier On the rule of thumb its policy chief cited, that TIA flight testing takes “somewhere between 6 and 18 months, depending on the complexity of the project”, a type certificate is unlikely before the second half of 2027 and could come at the end of 2028. Commercial flights under the pilot programme, its policy chief says, “will be tied to substantial TIA flight testing”, which no public document defines. Frontier The company’s strongest case is that the pace is now the FAA’s: it plans to fly several aircraft at once to shorten the phase. The brief names the agency’s test pilots as a bottleneck for that reason: the same specialists serve every applicant, and flying several aircraft at once adds to their load in the same months.

What is publicThe schedule, and the record of earlier schedules.
What is missingA date from the FAA, and a public definition of the “substantial TIA flight testing” to which, on the company’s account, commercial flights under the pilot programme will be tied.
What would settle itFAA pilots training on the aircraft by 30 June 2027, then flying it for credit.

Sources: 4, 10, 11, 14, 15, 16, 22, 23, 24

“Launching commercial passenger service in Dubai next year”, under six years’ exclusive rights from Dubai’s Roads and Transport Authority

Said 17 November 2025 · Claimed

Established The Dubai date has moved with the American ones. In February 2024 the company aimed for commercial passenger service by early 2026, with operations possibly from 2025; in June and November 2025, passengers in 2026, a year Dubai’s transport authority also gave. In November 2026 the plan for the rest of the year was operational flight testing “with a pilot on board”, and no launch date had been announced. Established The ground work is real: a vertiport near Dubai International Airport and a second at Dubai Marina were complete and certified by 18 November 2026, making a first route. The company began seeking a UAE air operator certificate in September 2024; none had been reported by 22 November 2026, and its UAE team says passengers will fly only after one is issued. Frontier Its UAE general manager described the first passenger flights as “eventually nonpaying passenger flights out of the completed vertiports”, after proving runs, so a first passenger and a first fare may be months apart. Speculative The brief calls the Gulf a strong test of the aircraft and a weak test of the system: one authority controls land, airspace and approval, so a good result in Dubai is an upper bound for other cities.

What is publicPiloted flights in Dubai since June 2025; two of four vertiports completed and certified by the UAE’s General Civil Aviation Authority by 18 November 2026; the exclusive agreement of February 2024.
What is missingA UAE air operator certificate, which the company says must come before any passenger, and a launch date.
What would settle itOperational flights between the certified vertiports, then the certificate and a first passenger, paying or not.

Sources: 5, 9, 12, 15, 22, 28, 29, 30, 31, 32, 33

“A maximum range of 150 miles”, “recently demonstrated during flight testing”, at up to 200 mph with a pilot and four passengers

Said 1 September 2021 · Claimed

Established The figure has not changed since 2021, and it comes from a prototype flown before the FAA’s 2024 powered-lift rule settled what reserve such an aircraft must carry. The Advanced Air Mobility brief’s rule applies: a range figure without its reserve, payload and alternate distance is not a number. Frontier The launch routes do not need the full figure, which is the company’s strongest case. At top speed 150 miles is 45 minutes of flying; its own Dubai example, the airport to Palm Jumeirah in about ten minutes, is under a quarter of that, leaving the rest for reserve and pack wear. No pack energy density appears in the company statements read for this page, so whether the margin holds cannot be checked. Established The 523-mile flight used up to 40 kg of liquid hydrogen and a fuel cell in a converted airframe, landing with 10% of its hydrogen left. It shows a different powertrain and says nothing about the battery aircraft’s range.

What is publicThe company’s statement of a 2021 test flight by a prototype; a converted prototype’s 523-mile hydrogen-electric flight in June 2024.
What is missingThe 2021 flight’s data, and range for the conforming aircraft with a legal reserve, a full payload and an aged battery pack.
What would settle itThe range and reserve figures in the type certificate and flight manual, then dispatch data from operations.

Sources: 1, 2, 5, 7

45.2 dBA overhead at 500 metres after NASA testing, a level that “will barely be perceptible against the ambient environment of cities”

Said 10 May 2022 · Shown

Established NASA made the measurements; the headline number is the company’s. Its release says NASA processed the microphone data into a map of the sound below the aircraft, and Joby then applied standard corrections for spherical spreading and atmospheric attenuation to arrive at 45.2 dBA at 500 metres. The take-off and landing figure, below 65 dBA at 100 metres, is attributed to NASA’s engineers. Frontier That is the strongest outside anchor any eVTOL has, and the brief relies on it, but it is one prototype in one campaign, measured as single events rather than the repeated movements a neighbour hears. Speculative “Barely perceptible” is a claim about people, not decibels, and no community-scale measurement or survey has been published. Dubai’s two certified vertiports would be the first place to make one.

What is publicA two-week NASA measurement campaign in 2021 with more than 50 ground microphones, six overhead passes at 100 knots and more than 20 take-offs and landings. NASA engineers measured below 65 dBA at 100 metres from the take-off and landing path; the 45.2 figure is the company’s extrapolation of NASA-processed data.
What is missingNASA’s dataset, measurements of the conforming aircraft, cumulative levels over a day of operations, and any survey of how people near a vertiport respond.
What would settle itPublished measurements around a working vertiport at design movement rates, beside a helicopter baseline from the same site.

Sources: 2, 3, 32

Doubling American manufacturing capacity “to support the production of four aircraft per month in 2027”, and up to 500 aircraft a year eventually from Ohio

Said 17 December 2025 · Claimed

Established The line is real and growing. The company counted five aircraft flying and twelve more in production in August 2026, and “17 aircraft in production” in November, with an eighteenth begun. Frontier Four a month is 48 a year: about 2.7 times every aircraft begun on the Marina line to date, and twice the 24 a year the company gave as Marina’s planned capacity in August 2025. Toyota’s involvement is the company’s strongest case that the ramp can be engineered. Speculative The Ohio figure of up to 500 a year carries no date. Frontier Before a type certificate every aircraft built is a test article or stock; the factory’s useful rate is set by the certificate, and a production certificate is a separate FAA approval still to come.

What is publicSeventeen aircraft in production at 4 November 2026, with work orders released for an eighteenth; output in the eight core shops up 37% between the first and third quarters of 2026; facilities bought in Ohio; a manufacturing alliance with Toyota, which has invested US$250 million.
What is missingAircraft completed per month, an FAA production certificate, and a date for the Ohio capacity.
What would settle itAircraft completed per month through 2027, and a production certificate.

Sources: 4, 10, 13, 14, 16, 22

“First-Ever Fully Autonomous Flight Across the United States”: 3,199 miles “with zero control inputs from its onboard safety pilot”

Said 18 September 2026 · Shown

Established This is the company’s autonomy system in a conventional aeroplane, with a safety pilot aboard and supervision from the ground; it is not the air taxi. The flights happened in public, and the Air Force has kept paying for the work. Frontier A customer adding money is the nearest thing here to outside acceptance, but no test report is public, so “zero control inputs” is the company’s own measure. Frontier It bears on the brief’s question of whether the pilot comes out: the work is going to defence cargo first, and no regulator has a means of compliance for autonomous passenger flight in controlled airspace.

What is publicA public tour by a converted Cessna Caravan with stops at named airports and an Air Force base; the Air Force’s expanded contracts, worth nearly US$37 million, with an operational-testing ceiling of US$50 million.
What is missingFlight logs, the criteria behind “zero control inputs”, and any Air Force test or acceptance report.
What would settle itAn Air Force operational test report, or an FAA approval for any reduced-crew or uncrewed operation.

Sources: 18, 20, 22

Where it fits

The briefs this company’s work bears on, and how. Each of those briefs links back here.

Advanced Air Mobility

The brief says the American schedule waits on agency test pilots, and Joby is where that bottleneck is now being tested: FAA pilots are to begin training on its aircraft in the first half of 2027, and on the six-to-18-month rule of thumb its policy chief cited, the flight phase that follows puts a type certificate in the second half of 2027 at the earliest. Its record bears out the brief’s advice to discount launch dates: four American first-passenger years in four and a half years, and a Dubai year that has become pilot-only flight testing. It touches two more of the brief’s bottlenecks. Capital: in the third quarter it used US$195 million of cash and held US$2.2 billion at 30 September 2026, and its chief financial officer expects to pay about US$450 million in cash for Resonant Sciences early in 2027, subject to regulatory approval; its revenue is Blade’s helicopters, as the brief says of the survivors. Energy: its 150-mile range dates from a 2021 prototype and has never been stated with a reserve. The brief’s one independent noise anchor is NASA’s 2021 campaign on Joby’s prototype, though the 45.2 dBA figure is the company’s extrapolation of NASA’s data. Dubai’s certified vertiports are where the brief’s metered year could begin, if anyone publishes it.

The numbers

Figures marked as Institute arithmetic are the Institute’s own derivations from the cited sources; the working is shown so that anyone can redo it.

QuantityValueHow it is worked outSources
FAA certification on the company’s chart, 30 October 2026 Stage four, testing and analysis: 83% on the company’s side (more than 40% in December 2024, 70% in August 2025) and 78% on the FAA’s (more than 50% in August 2025). Stage five, show and verify: 25% and 14%. The company’s releases and quarterly chart. The chart prints its values without stage labels; the pairing is the Institute’s reading of their order against the letter’s statement that stages one to three are complete. 8, 10, 22
End of FAA flight testing, on the company’s schedule and the rule of thumb it cited Between the second half of 2027 at the earliest and the end of 2028 FAA pilot training in the first half of 2027, then a TIA flight phase of 6 to 18 months, the industry rule of thumb the company’s policy chief cited. Institute arithmetic; for-credit flights follow training, so the earliest end is later than the sum suggests. 22, 23
American first-passenger years the company has set 2024 (set in May 2022), 2025, 2026 (repeated on 5 August 2026), 2027 (November 2026): four in four and a half years Company releases; the 2025 target and the move to 2027 as reported by AIN. 4, 16, 24
Dubai vertiports finished Two of four, both certified by the UAE’s General Civil Aviation Authority by 18 November 2026: VDX near Dubai International Airport and VMR at Dubai Marina The authority’s and Skyports’ announcement as reported in the Gulf press. 32, 33
Aircraft in production Five flying and twelve in production in August 2026; “17 aircraft in production” in November, with an eighteenth begun The company’s August release and November letter. 16, 22
The 2027 production target against the record 48 aircraft a year: about 2.7 times the 18 begun on the Marina line to date, and twice Marina’s planned 24 a year 4 a month × 12; 48 ÷ 18. Institute arithmetic. 10, 13, 22
Advertised range and speed 150 miles (241 km) at up to 200 mph (322 km/h): 45 minutes at top speed. The company’s ten-minute Dubai example trip is under a quarter of that. 150 ÷ 200 = 0.75 hours. Institute arithmetic; cruise speed in service will be lower than top speed. 1, 5
Noise from the 2021 NASA campaign 45.2 dBA overhead at 500 metres and 100 knots; below 65 dBA at 100 metres from the take-off and landing path The first is the company’s extrapolation of NASA-processed data; the second is attributed to NASA’s engineers. Both as published by the company. 3
The February 2022 accident A remotely piloted prototype broke up after a propeller blade separated in a commanded dive to 181 knots indicated (about 208 mph) at 8,900 feet, beyond its expected envelope; no one was hurt NTSB final report DCA22FA082, February 2024; knots to mph is Institute arithmetic. 25
Cash, third quarter of 2026 Net loss US$211.8 million; US$195 million of cash used; US$2.2 billion in cash and investments at 30 September 2026 The company’s third-quarter letter. 22

What would change this assessment

Status as of 22 November 2026. Events that are also on the Watchlist link to it.

MilestoneWhy it mattersStatusLatest
FAA pilots begin training on the conforming aircraft The step the company ties to its American passenger flights; it has moved from 2025 to 2026 to 2027. Not seen Expected in the first half of 2027, on the company’s statement of 4 November 2026. [22, 23]
For-credit TIA flight tests by FAA pilots, and how long they run The last major step before a type certificate; moves the certification claim off the company’s chart. Not seen Not begun as of 4 November 2026; the company’s policy chief cited a rule of thumb of 6 to 18 months for the phase. [23]
Operational flight testing between the Dubai vertiports, with a pilot aboard The first use of the certified route; the last part of the 2026 Dubai plan still standing. Not seen Planned for later in 2026; on 18 November 2026 the vertiport operator said it looked forward to welcoming Joby’s flights between its vertiports “soon”. [22, 33]
A UAE air operator certificate for Joby No Dubai passenger, paying or not, can fly without it. In progress Sought since September 2024; none reported as of 22 November 2026. [28, 31]
First American passengers under the White House pilot programme, non-paying and then paying Tests the 2027 date and the brief’s view that the American schedule waits on agency test pilots. Not seen Placed in 2027 on the company’s third-quarter 2026 call, as AIN reported; demonstration flights only, in Texas in September and Florida in October 2026. [17, 19, 24, 23]
Four aircraft a month from the factory in 2027 Shows whether the production ramp is real ahead of certification. Not seen Seventeen aircraft in production on 4 November 2026, an eighteenth begun. [13, 22]
Published noise measurements around a working vertiport, or NASA’s 2021 dataset Would test “barely perceptible” against people rather than a single flyover. Not seen Nothing at community scale published as of 22 November 2026. [3]

Sources

Statements by the company and its own papers are labelled as such; nothing the company has published has been peer reviewed.

  1. Joby Aviation, Joby Aviation announces closing of business combination with Reinvent Technology Partners to become publicly traded company, 10 August 2021 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/16/joby-aviation-announces-closing-of-business-combination
  2. Joby Aviation, Joby and NASA collaborate to measure noise footprint of electric air taxi, 1 September 2021 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/17/joby-and-nasa-collaborate-to-measure-noise-footprint-of
  3. Joby Aviation, Joby confirms revolutionary low noise footprint following NASA testing, 10 May 2022 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/38/joby-confirms-revolutionary-low-noise-footprint-following
  4. Joby Aviation, Joby receives Part 135 certification from the FAA, 26 May 2022 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/40/joby-receives-part-135-certification-from-the-faa
  5. Joby Aviation, Joby to launch air taxi service in UAE, 11 February 2024 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/87/joby-to-launch-air-taxi-service-in-uae
  6. Joby Aviation, Joby completes third stage of FAA certification process, 21 February 2024 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/88/joby-completes-third-stage-of-faa-certification-process
  7. Joby Aviation, Joby demonstrates potential for emissions-free regional journeys with landmark 523-mile hydrogen-electric flight, 11 July 2024 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/101/joby-demonstrates-potential-for-emissions-free-regional
  8. Joby Aviation, Joby successfully conducts first FAA testing under TIA, begins final phase of certification program, 20 December 2024 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/122/joby-successfully-conducts-first-faa-testing-under-tia
  9. Joby Aviation, Joby cements global lead in air taxi industry with Dubai flights and beginning of commercial market readiness work, 30 June 2025 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/132/joby-cements-global-lead-in-air-taxi-industry-with-dubai
  10. Joby Aviation, Joby reports second quarter 2025 financial results, 6 August 2025 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/139/joby-reports-second-quarter-2025-financial-results
  11. Joby Aviation, Joby begins power-on testing of first conforming aircraft, enters final stage of type certification process, 5 November 2025 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/156/joby-begins-power-on-testing-of-first-conforming-aircraft
  12. Joby Aviation, Dubai air taxi network takes flight: Joby completes landmark flight and announces next vertiport locations, 17 November 2025 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/162/dubai-air-taxi-network-takes-flight-joby-completes
  13. Joby Aviation, Joby announces plans to double manufacturing capacity in United States, 17 December 2025 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/165/joby-announces-plans-to-double-manufacturing-capacity-in
  14. Joby Aviation, Joby’s first FAA-conforming aircraft takes flight, 11 March 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/176/jobys-first-faa-conforming-aircraft-takes-flight
  15. Joby Aviation, Shareholder letter, first quarter 2026, 5 May 2026 — Company statement. d1io3yog0oux5.cloudfront.net/_e910416bcebfbc689e1b73726604cafa/jobyaviation/db/1086/9884/pdf/Joby_Aviation_2026_Q1_Shareholder+Letter_compressed.pdf
  16. Joby Aviation, Joby reports second quarter 2026 financial results, 5 August 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/187/joby-reports-second-quarter-2026-financial-results
  17. Joby Aviation, Joby launches eIPP flights in Texas, 10 September 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/191/joby-launches-eipp-flights-in-texas
  18. Joby Aviation, Joby completes first-ever fully autonomous flight across the United States, 18 September 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/192/joby-completes-first-ever-fully-autonomous-flight-across
  19. Joby Aviation, Joby brings its vertical takeoff and landing air taxi to Florida, 30 October 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/195/joby-brings-its-vertical-takeoff-and-landing-air-taxi-to
  20. Joby Aviation, Joby expands autonomous flight contracts with U.S. Air Force to nearly $37 million, 4 November 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/196/joby-expands-autonomous-flight-contracts-with-u-s-air
  21. Joby Aviation, Joby reports third quarter 2026 financial results, 4 November 2026 — Company statement. ir.jobyaviation.com/news-events/press-releases/detail/197/joby-reports-third-quarter-2026-financial-results
  22. Joby Aviation, Shareholder letter, third quarter 2026, 4 November 2026 — Company statement. d1io3yog0oux5.cloudfront.net/_980d8bfcc1656117460efb6ab040a346/jobyaviation/db/1110/9894/shareholder_letter/Joby_Aviation_2026-Q3-Ltr_to_Shareholders_FINAL110426.pdf
  23. Joby Aviation, third-quarter 2026 earnings call, 4 November 2026 (transcript published by The Motley Fool) — Company statement. www.fool.com/earnings/call-transcripts/2026/11/05/joby-joby-q3-2026-earnings-call-transcript
  24. Hanneke Weitering, Joby and Archer push eVTOL passenger flights to 2027, AIN FutureFlight, 11 November 2026 — Press report. www.ainonline.com/aviation-news/futureflight/2026-11-10/joby-and-archer-push-evtol-passenger-flights-2027
  25. US National Transportation Safety Board, final report DCA22FA082, Joby Aero JAS4-2 N542AJ, Jolon, California, 16 February 2022 (published February 2024) — Government. data.ntsb.gov/carol-repgen/api/Aviation/ReportMain/GenerateNewestReport/104654/pdf
  26. Charles Alcock, NTSB confirms propeller failure caused crash of Joby’s eVTOL prototype, AIN, 10 February 2024 — Press report. ainonline.com/news-brief/2024-02-10/ntsb-confirms-propeller-failure-caused-crash-jobys-evtol-prototype
  27. Alex Scerri, Lessons learned from Joby’s 2022 eVTOL accident, Vertical, 25 March 2024 — Press report. verticalmag.com/opinions/lessons-learned-from-jobys-2022-evtol-accident
  28. Jack Daleo, Joby seeks Middle East’s first air taxi operator certification, FLYING, 11 September 2024 — Press report. www.flyingmag.com/joby-seeks-middle-easts-first-air-taxi-operator-certification
  29. Government of Dubai Media Office, RTA and Joby complete first crewed eVTOL taxi flight, 16 November 2025 — Government. www.mediaoffice.ae/en/news/2025/november/16-11/rta-and-joby-complete-first-crewed-evtol-taxi-flight
  30. Elan Head, First air taxi service to launch in Dubai in 2026, IEEE Spectrum, 28 December 2025 — Press report. spectrum.ieee.org/joby-air-taxi
  31. Waheed Abbas, UAE flying taxis: regulator visits Joby and Archer facilities before service launch, Khaleej Times, 15 October 2026 — Press report. www.khaleejtimes.com/business/uae-flying-taxis-regulator-visits-joby-and-archer-facilities-before-service-launch
  32. Gulf News, Dubai air taxis: DXB to Dubai Marina in under 10 minutes as new vertiport gets approval, 18 November 2026 — Press report. gulfnews.com/uae/dubai-air-taxis-dxb-to-dubai-marina-in-under-10-minutes-as-new-vertiport-gets-approval-1.500752044
  33. Gulf Today, Dubai completes Marina vertiport, paving way for electric air taxi services, 18 November 2026 — Press report. www.gulftoday.ae/news/2026/11/18/dubai-completes-marina-vertiport-paving-way-for-electric-air-taxi-services
About this page. The Institute has no financial or other relationship with Joby Aviation and accepts no payment for including any company. This page assesses public claims; it is not investment advice. A company that believes a claim is misplaced on the ladder can send evidence through the contact page; corrections are made here and recorded on Updates. The page is reviewed by 22 February 2027, or sooner if a milestone above is met. All Frontier Companies.