Where it stands

Climeworks has run direct-air-capture plants with mineral storage in Iceland since 2021, and an outside auditor publishes Mammoth’s output under a registry standard, so its claims can be checked more closely than most. What has been checked is small. The auditor verified 278 net tonnes for March to August 2025 and 82 for the next two months, after deducting 34 to 37 per cent of the CO2 stored for the plant’s operating emissions. The company reports 675 net tonnes for the first half of 2026, about 1,350 a year: under 4% of a 36,000-tonne nameplate that assumes all 72 containers at peak rate every day of the year, when 12 are installed. Orca never exceeded a quarter of its design. Energy and gross capture are redacted from the final audits and no cost per tonne has been published; a draft audit implies about 40 MWh per tonne captured during ramp-up, seven times the company’s own figure. The business case now rests on selling scarce, audited tonnes to a small number of large buyers, on reselling other suppliers’ removals, and on a next-generation machine and a Louisiana plant, neither yet in the field.

The company

Founded 2009, as a spin-off of ETH Zurich, by Christoph Gebald and Jan Wurzbacher [22, 20]
Headquarters Zurich, Switzerland, with a US headquarters in Texas since 2024 [16, 20]
Set up to make Machines that take carbon dioxide from the air on a solid filter material, for injection and mineral storage in Icelandic basalt by Carbfix, on geothermal power; since 2024 it also resells removal credits from other methods [2, 5, 17, 4]
Team 483 before the May 2025 restructuring, by Bloomberg’s count (another report gave 498), which cut 106 jobs, 78 of them in Switzerland. No later headcount appears in the sources read. [13, 15]
Leadership Christoph Gebald and Jan Wurzbacher, co-founders and co-chief executives [4, 22]
Disclosed funding US$162 million of equity in July 2025, mainly from BigPoint Holding and Partners Group; the company says it has raised over US$1 billion since its founding. The Louisiana hub it belongs to received about US$50.2 million of federal funds for its first phase, with Battelle as prime recipient. [4, 17, 25]
Customers More than 160 organisations by May 2024, including Microsoft, JPMorgan Chase and Boston Consulting Group; Morgan Stanley contracted 40,000 tonnes; British Airways, Lufthansa and SWISS among airline buyers; about 21,000 individual subscribers by 2025 [9, 8, 23]
Stated plans All 12 installed Mammoth containers upgraded by the end of 2026 and next-generation tests at Mammoth from early 2027, both scheduled; a Louisiana plant producing by the end of 2027, as stated in October 2024 and repeated in April 2026; a million tonnes a year by 2030 and a billion by 2050 [23, 22, 12, 9, 19]

What it claims, and how far each claim has got

Each claim is placed on the Institute’s evidence ladder, which measures how far the public evidence for a claim has got, not whether the claim is true: Claimed, Described, Shown, Verified, Repeated and In use. The definitions are on the Frontier Companies page. Flags inside each assessment follow the rest of the site: Established, Frontier, Speculative and Handwave.

Climeworks “aims to third-party verify and certify” the carbon removal at Mammoth

Said May 2024 · Verified

Established This is the company’s strongest result. For March to August 2025 the auditor verified 442.1 tonnes stored in basalt, deducted 163.1 tonnes of operating emissions from heat, electricity, sorbent and water and 0.6 tonnes of releases, and certified 278.3 net: 63% of what was stored. September and October 2025 gave 82.3 net from 124.0 stored, 66%. A critical finding on the risk register was closed; open actions cover reservoir modelling and an update to the storage permit. Frontier Heimildin’s 2025 investigation draws the boundary more widely. Embodied emissions are amortised from May 2029 to April 2039, so no tonne certified so far carries a share of building the plant. Heimildin notes that the registry is paid by Climeworks, and that the company’s own carbon accounting put its corporate emissions at 1,079 tonnes in 2022 and 1,700 in 2023, against 876 tonnes captured from December 2023 to October 2024. Established The draft of the March to August report was not clean: it gives 264.7 certificates on its cover and 278.3 in its body. The final gives 278.3 in both.

What is publicOutput audits by 350Solutions under Puro.earth’s Geologically Stored Carbon methodology for March to August 2025 (278.3 net tonnes certified) and September to October 2025 (82.3), each giving tonnes injected and emissions deducted. They draw on a facility audit by DNV.
What is missingGross capture and energy use, which the final reports redact; any deduction for the plant’s embodied emissions, which begins in 2029; an audit of any 2026 period.
What would settle itFinal reports with their inputs unredacted, an audit of the first half of 2026 that matches the company’s 675 tonnes, and an embodied-emissions figure for the whole plant.

Sources: 1, 5, 6, 7, 8

Mammoth will capture “up to 36,000 tons of CO2” a year; net removal “will be lower”

Said 8 May 2024 · Shown

Established The nameplate is 72 containers each at its design peak of 1.37 tonnes a day, every day of the year: 72 × 1.37 × 365 is 36,000 tonnes, gross. The draft audit says three of the 72 are to be held in reserve on standby. Twelve containers are installed and the other 60 have no timetable. The company now cites 20,000 to 22,000 tonnes net for full build-out. Established In the first half of 2026 the plant removed 675 tonnes net, by the company’s figure: about 1,350 a year, 3.75% of the nameplate. Frontier The company’s case is that Mammoth is in a three-year ramp-up begun in 2024, and that its upgraded containers now run at a capacity factor of 40 to 50 per cent. Read against the nameplate, 72 such containers would remove 14,400 to 18,000 tonnes a year; the build-out figure needs 56 to 61 per cent, better than the best containers achieve now. Frontier Figures for the first ten months disagree: Heimildin took 105 tonnes from the registry, while the company told swissinfo it had captured 750. Neither source says whether its number is gross, net or certified.

What is publicRegistry audits of net removal for March to October 2025; company figures for the first halves of 2025 and 2026; two upgraded containers at the design rate for six months, on the company’s figures; 12 of 72 containers installed.
What is missingGross capture and uptime for the whole plant, a date for the remaining 60 containers, and the basis of the 20,000 to 22,000 tonnes net the company now cites for full build-out.
What would settle itAudited annual net removal from a completed plant, or a published schedule for the remaining containers.

Sources: 1, 23, 21, 24, 13, 8, 15, 5

Mammoth removed 675 tonnes net in the first half of 2026, against 119 a year earlier; upgraded containers reach the original design rate of 1.37 tonnes a day, and operating cost per tonne fell by more than half

Said 10 September 2026 · Shown

Established The improvement is large on the company’s numbers, and its direction matches the audits, which show about 46 net tonnes a month from March to August 2025 and 41 in September and October; the company’s figure for the first half of 2026 is 112 a month. Against the audited 2025 rates the 2026 figure is about 2.4 to 2.7 times higher; the sixfold figure is measured from the company’s 119 tonnes for the first half of 2025. It followed some 18 months of work on sorbent, mechanics and operation, after the first containers had run at about half their design rate. Frontier Twelve containers at the design rate for 181 days would capture about 2,980 tonnes gross; 675 net is 23% of that, so the module as a whole still runs well below its two upgraded units. Handwave A cost halved from an undisclosed figure is not a cost, and Bloomberg reports the company did not disclose the expense. Wurzbacher told Bloomberg the earlier approach “was really a volume game” and that the focus is now performance.

What is publicThe company’s figures, as reported by Bloomberg and others: two upgraded containers at the design rate for over six months, a capacity factor of 40 to 50 per cent, an operating-cost cut given as a percentage.
What is missingA registry audit of the 2026 periods, gross capture, and the operating cost in money.
What would settle itAn output audit for January to June 2026 confirming the 675 net tonnes, then the upgraded module’s audited output in 2027.

Sources: 21, 22, 23, 24, 5, 6, 7

Orca, opened in Iceland in September 2021, can capture up to 4,000 tonnes of carbon dioxide a year

Said September 2021 · Claimed

Established No public record shows Orca near its design. It has never captured more than 1,000 tonnes in a year, Bloomberg reported in May 2025, and swissinfo that it has not reached 1,000 tonnes of net removal in any year: at best a quarter of design. Its 2023 accounts carried a US$1.4 million depreciation charge on it because it had not met expectations, Heimildin reported, and Bloomberg, from an interview with Wurzbacher, that its technology is outdated and the company will not invest heavily to raise its output. Frontier The company’s case is that Orca was a pilot that validated its approach, and that the Iceland shortfalls are early mechanical problems, ice and snow among them, now being addressed with upgrades. Established Heimildin’s much-repeated “just over 2,400” units since 2021 is for all of Climeworks’ capture in Iceland, Mammoth’s first months included, not for Orca alone.

What is publicAnnual capture as reported by Bloomberg and swissinfo, and totals for Iceland as a whole from registry and accounts data, as reported by Heimildin.
What is missingA year-by-year record of gross capture, net removal and uptime for Orca alone.
What would settle itOrca’s annual gross and net figures, matched to the registry’s certificates.

Sources: 14, 15, 8, 4

In the laboratory, the next-generation technology shows a tenfold longer sorbent lifetime and fourfold process densification; field tests at Mammoth begin at the start of 2027

Said 10 September 2026 · Claimed

Frontier This is the second round of such claims. In June 2024 the company said its third generation captured twice as much CO2 per module for half the energy, with a filter material lasting about three times longer and overall costs halved, and that it would first be built in Louisiana; a 2026 press account dates its full-scale validation in Switzerland from May 2024 to January 2025 and says the per-module and energy results were “confirmed by third-party testing partner Svante”. A testing partner is not independent of the company, and no data from the validation appears in the sources read. Speculative The sources read do not say whether the 2027 technology is that third generation. Fourfold densification would mean fewer containers for the same output, which bears directly on the 60 Mammoth containers not yet built. Established The present containers took some 18 months of upgrades in the field to reach the rate they were designed for; the laboratory gains face the same test from 2027.

What is publicThe statement. In 2024 the company also said a full-scale third-generation collector had been built and tested in Basel.
What is missingAny data from the laboratory or the Basel unit: the sorbent, cycles to failure, capture per cycle, energy per tonne.
What would settle itAudited output and energy from the 2027 field units at Mammoth.

Sources: 10, 11, 19, 22, 24, 23

Costs are “closer to the $1,000 per ton mark than we are to the $100 per ton mark”; the target is $300 to $350 a ton by 2030, and a cost per ton will be published after one to two years of operation

Said 8 May 2024 · Claimed

Established The targets have moved. An earlier goal of about $100 a tonne became $300 to $350 by 2030 in Wurzbacher’s May 2024 account and $400 to $600 by 2030 in the chief operating officer’s a month later, falling to $150 to $250 by 2050, against Wurzbacher’s $100 by 2050. Katrin Sievert, a climate finance and policy researcher at ETH Zurich, told swissinfo in May 2025 that the technology had “not yet performed at the scale originally hoped for” and that cost reductions had been “slower than anticipated”. Frontier The two 2030 figures agree if the first is per tonne captured and the second per tonne removed: at the audited 63 to 66 per cent net, $300 to $350 captured is about $455 to $556 removed. Handwave The promised cost figure has not appeared. The window the company set closed in May 2026, and in September it gave a percentage, not a price. An IEA estimate cited in September 2026 puts direct air capture with storage at roughly $600 to $1,000 a tonne for existing projects.

What is publicTargets only, which differ by speaker; in September 2026, a percentage cut in operating cost per tonne with no figure.
What is missingA cost per tonne, captured or removed, capital or operating, for any plant.
What would settle itA published, audited cost per net tonne for Mammoth, as the company said it would publish.

Sources: 9, 10, 15, 8, 21, 24, 6, 7

Upgrades have “doubled energy efficiency”

Said July 2025 · Claimed

Established The only measured figures public are in the draft audit: 4,822 MWh of electricity and 12,713 MWh of heat against 442.1 tonnes captured, about 10.9 and 28.8 MWh a tonne, 39.7 in all. Wurzbacher’s own figure, as Heimildin reports it from Nikkei, was up to 5 to 6 MWh a tonne; the draft’s is about seven times that. The final report redacts both lines. Frontier The strongest case for the company: the period was a ramp-up with containers at about half their design rate, so site loads such as water treatment and CO2 dissolution, which the electricity line includes, fell on few tonnes; and the power and heat are geothermal, so their climate cost is already inside the 163 tonnes deducted. Handwave “Doubled” has no baseline and no absolute figure. Heatmap noted in 2024 that the company had been reticent about how much energy it uses. The final reports give no reason for the redactions.

What is publicNo energy figure in any final document. A draft of the March to August 2025 audit, published on the registry, gives 4,822 MWh of electricity and 12,713 MWh of heat for the period.
What is missingEnergy per tonne, gross and net, by plant and period, and the baseline the doubling is measured from.
What would settle itUnredacted energy inputs in the final audits, or a published life-cycle assessment for Mammoth.

Sources: 4, 5, 6, 8, 9, 2, 24

A direct-air-capture plant in Calcasieu Parish, Louisiana, with an investment decision and construction start in the third quarter of 2026 and production by the end of 2027

Said 28 October 2024 · Claimed

Established The hub, Project Cypress, received about US$50.2 million for its first phase in 2024, with several hundred million dollars more possible during construction; Battelle leads, with Climeworks and Heirloom as technology providers. It appeared on a leaked cancellation list, went more than 500 days without a public update, and was retained after the Department of Energy’s review in April 2026. Established The department’s page for the project’s environmental impact statement, last updated 23 October 2026, says the statement “has been canceled due to project modifications”, without saying what changed. No investment decision is reported in the sources read, and the third quarter of 2026 has passed. Frontier The company said in March 2026 that it remains “strongly committed”. It cut 22% of its staff in May 2025 amid the US policy reversal and what Bloomberg described as unfavourable market conditions, and said in mid-2025 that it would re-evaluate the project if its funding changed. First-stage capacity has been given as 250,000 and as about 300,000 tonnes a year.

What is publicA state economic-development release, a federal award to the hub’s first phase, and the hub’s retention after the federal review of April 2026.
What is missingAn investment decision, a construction start, a storage permit and a settled first-stage size.
What would settle itA reported investment decision and construction start, or a stated cancellation.

Sources: 12, 25, 3, 18, 19, 20, 26, 14, 17, 10

Where it fits

The briefs this company’s work bears on, and how. Each of those briefs links back here.

Carbon Removal Verification

The brief uses Climeworks to show that tonnes exist at the plant fence and not at the company boundary. The Mammoth audits refine that: the registry boundary deducts the operating emissions of capture and storage, 34 to 37 per cent of what is stored, but defers the plant’s embodied emissions to 2029–2039 and leaves out the company’s overheads. The same documents show three of the brief’s bottlenecks at once. Data access: the final reports redact gross capture and energy that a draft on the same registry printed. The registry business model: the registry is paid by the company it certifies, by Heimildin’s account. Monitoring obligations: the reports carry open actions on reservoir modelling and the storage permit. On the delivery ledger the brief tracks, Mammoth had sold about a third of its 25-year output by May 2024 while removing about 1,350 net tonnes a year in 2026; the container upgrades scheduled for the end of 2026 and the next-generation tests scheduled for early 2027 are the operator’s timetable the brief names.

Carbon Capture at Scale

The brief’s sixth bottleneck is delivery, and Climeworks is its measuring stick: Mammoth’s first half of 2026, annualised, is 3.75% of nameplate, and Orca never reached a quarter of its design. Its first is thermodynamic: the only measured energy figure for Mammoth, from a ramp-up period, is about 40 MWh per tonne captured, seven times the company’s own figure, and the 2027 field tests are where the claims of tenfold sorbent life and fourfold densification meet it; the 2024 claim of halved energy has no field data in the sources read. Its fifth is capital and policy risk: a 22% staff cut in May 2025, the Louisiana hub’s survival of the federal review in April 2026, the cancellation of its environmental impact statement for project modifications, recorded on a Department of Energy page last updated 23 October 2026, and no investment decision reported. The brief’s figure for Mammoth’s first ten months, 105 tonnes or about 0.35% of ten months’ design, is the registry’s; the company gave 750 tonnes for the same window, about 2.5%.

The numbers

Figures marked as Institute arithmetic are the Institute’s own derivations from the cited sources; the working is shown so that anyone can redo it.

QuantityValueHow it is worked outSources
Mammoth’s nameplate, taken apart 72 containers × 1.37 tonnes a day × 365 days = 36,000 tonnes a year, gross Every container at its design peak every day of the year. Institute arithmetic. 1, 23
Mammoth, first half of 2026 675 tonnes net: about 1,350 a year, 3.75% of the nameplate and 6 to 7% of the 20,000 to 22,000 tonnes net cited for full build-out The company’s figure, doubled. Institute arithmetic. 21, 23
The installed module against its design, first half of 2026 675 tonnes net against about 2,980 gross at the design rate: 23% 12 × 1.37 × 181 days. Institute arithmetic. 23, 21
Capacity factor the build-out figure implies 56 to 61%, against 40 to 50% for the upgraded containers 20,000 and 22,000 tonnes divided by the 36,000-tonne nameplate. Institute arithmetic. 23
Audited net removal, March to August 2025 278.3 tonnes from 442.1 stored, after 163.1 tonnes of operating emissions and 0.6 of releases: 63% Output audit under Puro.earth’s Geologically Stored Carbon methodology. 6
Audited net removal, September to October 2025 82.3 tonnes from 124.0 stored, after 41.7 deducted: 66% Output audit under the same methodology. 7
Energy, March to August 2025 4,822 MWh of electricity and 12,713 MWh of heat: about 39.7 MWh a tonne captured (10.9 electrical, 28.8 thermal), against the 5 to 6 MWh the company had cited The draft audit’s inputs divided by 442.1 tonnes captured. Institute arithmetic. 5, 8
Orca against its design Never more than 1,000 tonnes in a year, against 4,000: at most 25% Bloomberg’s figure, May 2025. 14
Company emissions against capture 1,079 tonnes in 2022 and 1,700 in 2023, against 876 tonnes captured from 1 December 2023 to 31 October 2024 The company’s carbon accounting and capture data, as Heimildin reported them. 8
The two 2030 cost targets, if one is per tonne captured and the other per tonne removed $300 to $350 a tonne captured is about $455 to $556 a tonne removed at 63 to 66% net, inside the $400 to $600 target Division by the audited net ratios. Neither source states its basis. Institute arithmetic. 9, 10, 6, 7

What would change this assessment

Status as of 22 November 2026. Events that are also on the Watchlist link to it.

MilestoneWhy it mattersStatusLatest
All 12 installed Mammoth containers upgraded to the new sorbent and mechanics Tests whether the two upgraded containers’ rate holds across a module, and sets the plant’s output for 2027. In progress Two containers upgraded and at the design rate for over six months, as of 10 September 2026; the rest scheduled by the end of 2026. [22, 23, 24]
Next-generation field tests at Mammoth The first field check of the tenfold sorbent-lifetime and fourfold densification claims. Not seen Scheduled for the start of 2027; laboratory results only, as of 10 September 2026. [22, 24]
A registry output audit for the first half of 2026 Would move the 675-tonne figure from the company’s word to verified. Not seen The latest audit read, dated 28 January 2026, covers September and October 2025. [7]
A published cost per tonne for Mammoth The company said in May 2024 it would publish one after one to two years of operation; every cost target is measured from it. Did not happen Not published by May 2026. On 10 September 2026 the company gave only a percentage cut in operating cost. [9, 21]
An investment decision and construction start for the Louisiana plant Decides whether the third-generation design reaches commercial scale, outside Iceland, by the company’s 2027 target. Not seen None reported; it was targeted for the third quarter of 2026. The federal environmental impact statement was cancelled for project modifications, by a page updated 23 October 2026. [12, 11, 26]
Unredacted energy and gross capture in the final audits, or a life-cycle assessment for Mammoth Without them no outsider can check energy per tonne or the ratio of net to gross. Not seen The final March to August 2025 report redacts both; its draft did not. [5, 6]
A timetable for Mammoth’s remaining 60 containers Without one the 36,000-tonne nameplate has no date. Not seen No timeline, as of 12 September 2026. [23]

Sources

Statements by the company and its own papers are labelled as such; nothing the company has published has been peer reviewed.

  1. Climeworks, Mammoth plant page — Company statement. climeworks.com/plant-mammoth
  2. Climeworks, Mammoth taking final shape — Company statement. climeworks.com/news/mammoth-taking-final-shape
  3. Climeworks, Project Cypress team awarded funding from US DOE — Company statement. climeworks.com/news/project-cypress-team-awarded-funding-from-us-doe
  4. Climeworks, Climeworks raises USD 162M to scale up technology, July 2025 — Company statement. climeworks.com/press-release/climeworks-raises-usd-162m-to-scale-up-technology
  5. 350Solutions, Climeworks Mammoth Facility Output Audit Report 350-PU2507.02-OA, draft V1.1, 1 December 2025 (March to August 2025), Puro.earth registry — Independent. puro.earth/documents/content/eC0_UI4lQuKWivcypRfp6Ao2a37
  6. 350Solutions, Climeworks Mammoth Facility Output Audit Report 350-PU2507.02-OA, final V1.2, 3 December 2025 (March to August 2025), Puro.earth registry — Independent. puro.earth/documents/content/xUw8rd9dRzm61Jq_eYAVeQo2993
  7. 350Solutions, Climeworks Mammoth Facility Output Audit Report 350-PU2601.02-OA, V1.2, 28 January 2026 (September to October 2025), Puro.earth registry — Independent. puro.earth/documents/content/9dcb9gzsTbi2xuKhrIINrgo2a38
  8. Heimildin, Climeworks’ capture fails to cover its own emissions, 15 May 2025 — Press report. heimildin.is/FGY3
  9. Heatmap, Climeworks’ newest direct air capture plant is officially live, 8 May 2024 — Press report. heatmap.news/sparks/climeworks-mammoth-5-things-to-know
  10. IEEE Spectrum, Climeworks captures double the CO2 for half the energy, 5 June 2024 — Press report. spectrum.ieee.org/amp/carbon-capture-climeworks-2668462217
  11. Trellis, Climeworks unveils upgraded carbon capture tech, 12 June 2024 — Press report. trellis.net/article/climeworks-unveils-upgraded-carbon-capture-tech
  12. Louisiana Economic Development, Climeworks proposes $50 million investment to expand Louisiana’s direct air capture hub into southwest Louisiana, 28 October 2024 — Government. www.opportunitylouisiana.gov/news/climeworks-proposes-50-million-investment-to-expand-louisianas-direct-air-capture-hub-into-southwest-louisiana
  13. Bloomberg, Climeworks is cutting 22% of staff as US climate backlash hits carbon removal, via SWI swissinfo.ch, 21 May 2025 — Press report. www.swissinfo.ch/eng/climeworks-is-cutting-22%25-of-staff-as-us-climate-backlash-hits-carbon-removal/89379470
  14. Bloomberg, Climeworks is cutting 22% of staff as US climate backlash hits carbon removal, via Insurance Journal, 22 May 2025 — Press report. www.insurancejournal.com/news/international/2025/05/22/824741.htm
  15. SWI swissinfo.ch, Why Swiss carbon-removal start-up Climeworks faces serious headwinds, 22 May 2025 — Press report. www.swissinfo.ch/eng/climate-solutions/why-swiss-carbon-removal-start-up-climeworks-faces-serious-headwinds/89386618
  16. Blue News, Zurich-based climate company lays off a fifth of its workforce, 2025 — Press report. www.bluewin.ch/en/news/zurich-based-climate-company-lays-off-a-fifth-of-its-workforce-li.2705721
  17. Sifted, Climeworks raises $162m, 2 July 2025 — Press report. sifted.eu/articles/climeworks-raises-162m
  18. E&E News, Carbon removal hubs languish as DOE audits drag on, 20 March 2026 — Press report. www.eenews.net/articles/carbon-removal-hubs-languish-as-doe-audits-drag-on
  19. Decarbonfuse, on Project Cypress clearing the Department of Energy’s review, 21 April 2026 — Press report. decarbonfuse.com/posts/project-cypress-gets-green-light-doe-clears-600m-louisiana-dac-hub
  20. SWI swissinfo.ch (Keystone-SDA), Climeworks receives surprising green light for plant in Louisiana, 28 April 2026 — Press report. www.swissinfo.ch/eng/climate-solutions/climeworks-receives-surprising-green-light-for-plant-in-louisiana/91326278
  21. Bloomberg, Carbon removal pioneer Climeworks increases CO2 capture sixfold, via Energy Connects, 10 September 2026 — Press report. www.energyconnects.com/news/renewables/2026/september/carbon-removal-pioneer-climeworks-increases-co2-capture-sixfold
  22. ESG Today, Climeworks doubles CO2 capture performance at Iceland carbon removal plant, 10 September 2026 — Press report. www.esgtoday.com/climeworks-doubles-co2-capture-performance-at-iceland-carbon-removal-plant
  23. CleanThinking, on Mammoth’s throughput and costs, in German, 12 September 2026 — Press report. www.cleanthinking.de/climeworks-mammoth-durchsatz-kosten-2026
  24. Net Zero Compare, on Mammoth’s removal and operating costs, 16 September 2026 — Press report. netzerocompare.com/articles/climeworks-increases-co2-removal-at-mammoth-as-operating-costs-fall
  25. US Department of Energy, Project Cypress fact sheet, 2024 — Government. www.energy.gov/sites/default/files/2024-03/Project%20Cypress%20Fact%20Sheet_final.pdf
  26. US Department of Energy, DOE/EIS-0567: Project Cypress Regional Direct Air Capture (DAC) Hub, Calcasieu Parish and Caddo Parish, Louisiana, last updated 23 October 2026 — Government. www.energy.gov/node/4845848
About this page. The Institute has no financial or other relationship with Climeworks and accepts no payment for including any company. This page assesses public claims; it is not investment advice. A company that believes a claim is misplaced on the ladder can send evidence through the contact page; corrections are made here and recorded on Updates. The page is reviewed by 22 February 2027, or sooner if a milestone above is met. All Frontier Companies.