https://doi.org/10.18757/ejtir.2021.21.2.5504
Authors. Park, J. E
Venue. European Journal of Transport and Infrastructure Research 21(2)
How the Institute flags it
frontier 7 times
https://doi.org/10.18757/ejtir.2021.21.2.5504
Authors. Park, J. E
Venue. European Journal of Transport and Infrastructure Research 21(2)
frontier 7 times